You are on page 1of 1

M25

M26
400

DETAIL OF - M25
HOLD

M25
390

400
490
M26
500

DETAIL OF - M26

NOTES:
1.ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2.ALL MATERIALS FOR PIPE SUPPORTS SHALL BE A36 / S275JR / S355JR / EQ UNLESS
OTHERWISE MENTIONED IN THE DRAWING.
3. ALL PIPE SUPPORT DRAWING SHALL BE PREPARED AS PER THE EXCEL SHEET DIMENSIONS
SUPPORT ID QTY(NOS) & DOCUMENT-301-00-PI-SPC-00057.
POS-0015-304-73-TFC-17512 1 4. ALL WELDS ARE "BUTT WELD" AND CONTIINUOUS WELD UNLESS
OTHERWISE INDICATED

FOR FILLET WELDS SEE DETAILS BELOW

BILL OF MATERIALS ASSY QTY : 1

Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) mm (kg) Qty. (kg)
WELD ON BOTH SIDES WELD ON ONE SIDE
M25 1 L100X10 15.10 400.00 6.04 1 6.04 S275 a =0.5 X E min a =0.7 X E min
M26 1 L100X10 15.10 490.00 7.39 1 7.39 S275
Total 13.43
REFERENCE DRAWING

M27 S.NO DOC.NO REMARKS

1 301-00-PI-SPC-00057

0 ISSUED FOR APPROVAL INB 19.01.2024 SA 19.01.2024


250
REV By Date By Date
M28 DESCRIPTION
MARK CREATED CHECKED
DETAIL OF - M27
PROJECT TITLE :
North Field East Project
Onshore LNG Facilities
312
125

CONTRACTOR :
250
M27

DETAIL OF - M28
M28

320

SUPPORT ID QTY(NOS) SUB CONTRACTOR :


ALMANA STEEL STRUCTURES CO W.L.L
POS-0301-320-129C-WU-00011 1 P.O.BOX NO.40990
POS-0315-320-129C-WU-00011 DOHA-QATAR
1
PH:+974-4600809
POS-0316-320-129C-WU-00011 1 EMAIL : almanagroup@almanagroup.com
POS-0347-320-129C-WU-00011 1 web:www.almanagroup.com

SCALE : PROJECT NO. : J812


BILL OF MATERIALS ASSY QTY : 4
PROJECT SUPPORT MARK SHT SIZE REVISION
Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) mm (kg) Qty. (kg)
NFE1 PS14 04/04 A2 0
M27 1 L80X8 9.7 250.00 2.42 4 9.70 S275
M28 1 L80X8 9.7 312.00 3.00 4 12.10 S275
Total 21.80 Ope. Center Doc No.

You might also like