Sl. No. Subactivity / Steps Hazard Effect Control Measures Responsibility

PART A:- STANDARD JSA


1 Manual handling of Slippery surface & tripping hazard Slip/Trip/Fall may cause Clean up Water, grease, oil or other similar substances to SUPERVISOR
material injury prevent slippery surface. MONITORING AND
TRAINING
Proper access to work location. Access should be free of
tripping materials.
Use Mandatory PPE- Safety Shoes/Gum boot with steel toe,
Safety Helmet.
Sharp edges / surfaces Contact with Sharp Keep hands away from sharp edges / surfaces.
edges / surfaces may
cause injury or bruises
Use safety hand gloves as per nature of job.

Length & weight of the material Hit by material may Barricade the working area.
cause Injury
Assess the weight to be lifted.
Follow buddy system for handling lengthy / heavy object.
Loose Grip, Slippery surface of material, throwing of material Fall of object may cause Clean up Water, grease, oil or other similar substances of
Injury slippery surface of material.
Hold the material firmly while handling.
Material should not be thrown from top on ground / other level.

Secure the material while shifting on vehicle or trolley.


Use of safety gloves.
Unlocked castors or non gripped trolley by hand, Machne / Mobile Collapse of the trolley / Hold firmly trolley / scaffold /machine while push /pull.
scaffold wheels machine / scaffold or
contact with wheels Lock/Secure castors while trolley / scaffold /machine is in rest
may cause severe injury position.
During manual shifting of mobile scaffod / mobile machine, keep
foot away from contact with the bottom legs of scaffolding /
wheels.

Wrong Posture Backache, Strain Follow Safe Manual Handling techniques.


Use mechanical equipment if load is too heavy to handle.
Wrong Posture Backache, Strain

Train all concerns in manual materials handling techniques.


2 Lifting material Use correct posture for lifting the load. Ensure vision is not
blocked while carrying load.

Excess Weight/Wrong Posture due to poor manual lifting and Train all concerns in manual materials handling techniques.
handling, Inadequate nos. manpower, Vision block Backache, Strain
Provide adequate manpower for Manual Handling depending
upon size, and weight of load to be lifted.

Divide load weight between co-workers.


SUPERVISOR
Pinch points , caught in between materials causing hand or finger Hand and fingers Keep away body parts from pinch points. MONITORING AND
injuries injuries TRAINING
Proper coordination between workers during manual handing
of loads.
Wear the approved working gloves.
Fall of materials Injury to leg, foot and Assess the weight to be lifted.
hand Wear safety shoes with steel toe.
Hold the load frimly.
Wear hand gloves, leg guards.
Lift heavy / lengthy weight Severe back ache,
Continuous every day First assess the weight of load to be lifted (Legally allowed load
doing work by bending for manual lift: Adult Man -55kgs, Adult women-30kgs,
back may cause Adolescent male-30kgs, Adolescent female-20kgs.)
permanent back
disability, Spinal cord
bend, Ensure buddy system is followed while handling / fixing heavy
/lengthy objects.
Ensure safety hand gloves are used by workers while
performing work.

Deploy number of persons for manual handling work depending


upon weight of object/load.

Use correct posture while fixing / repairing / operating


machines.
Keep body away from nip points or entanglement hazards.
Use of trolleys / vehicles for shifting heavy material from one
place to another place.
Job Rotation of employees.
Use Crane / Material Lift/ other equivalent lifting equipment for
handling heavy material.
3 Manual handling of Fall of material , Fall of person Injury to personnel Ensure safe access and safe way to reach upto load. SUPERVISOR
material at height MONITORING AND
Wear fall protection devies/FBH. TRAINING
Provide fall protection devices like life line, hand railing,
platform etc.
Train workers on risk and hazards while working at height.
Overhead utilities Electrocution/ stuck by Ensure proper clearance from over head utility lines/ electrical
overhead lines may cables/ structures and obstructions.
cause burn injury
Adverse health effect, Wear suitable PPEs i.e. chemical suit, appron, rubber hand
Manual handling of skin irritation, gloves, safety shoes, eye protector etc. Do not handle chemical
4 chemicals Chemical exposure and respiration hazards respiration problem. container without lid. Use trolley or cart to transfer chemical
Eyw and hand injury. containers manually. Maintain good housekeeping.

5 Manual handling of Dusting hazards Respiration problem, Wear dust mask/ nose mask properly. Wear safety goggles.
material in dusty area eye injury

6 Manual handling of Poor ventilation, too cold, noisy atmosphere, direct sunlight, too hot, Personnel injury/ Stop the work till working atmoshphere is safe to work.
material in unsafe croudy place etc. accident SUPERVISOR
working atmoshphere. MONITORING AND
TRAINING
7 Manual handling of Adverse weather condition Personnel injury/ Stop the work during rain, cylone, storm or other adverse
material in adverse accident weather.
weather

8 Manual handling of Unfit, tired, person under influence of drugs, mentally upset, Personnel injury/ Stop the work. Take workers to rest. Keep away who is not fit
material with unstable physically unfit worker accident for work. Educate workers.
mental and physical
condtition of worker

9 Crossing over drain / Crossing drain line, improper ramp for passage, ramp without Personnel injury/ Provide proper ramp / passage way with handrails over drain / SUPERVISOR
ramp while manual handrails , Unsafe access accident trench. MONITORING AND
handling TRAINING
Avoid jumping over open drain /trench for taking short cut.
Provide temporary covers over drain lines / trench where
workers moves frequently.

Do not carry heavy object over ramp / passage way which is


constructed for crossing persons.
Provide even surface for access with railing.
Floor opening to be covered.

Note:
Prepared by: SALIH MAJEED Reviewed by: Approved by:

Note: This is standard JSA prepared based on general hazards. Site has to review this JSA considering process involved, site & work location condition, equipments/machines/ tools use, people involved and activities near by job location.
6-Jan-24

RANET--JSA-005

Compliance?
Yes / No Remarks

Yes

Yes

Yes

Yes

Yes

Yes
Yes
Yes
Yes

Yes
Yes

Yes
Yes
Yes
Yes

Yes

Yes
Yes
Yes

Yes
Yes
Yes

Yes
Yes
Yes

Yes
Yes
Yes
Yes
Yes
Yes

Yes

Yes

Yes

Yes

Yes
Yes

Yes
Yes

Yes
Yes
Yes

Yes
Yes
Yes

Yes

Yes

Yes

Yes

Yes

Yes
Yes

Yes

Yes
Yes

ved and activities near by job location.

You might also like