Professional Documents
Culture Documents
REV
DATA SHEET
PREP'D CHK'D DATE
DAW 31-Mar-24
Project Name : Warehouse & Staff Camp Service : Distribution Panel
Location : Male Staff Camp Quantity : 1 Unit
1 General
8 Altitude (m above mean sea level): Less 1000 m Max Wind Loading (km/h):
9 Standards
19 Enclosure
24 Arrangement
34 Incoming Section: Load Break Switch (A) Top Bottom Front Back Sec. No.:
38 Entry: Top Entry Bottom Entry Removable Entrance Plates Open Bottom
39 Top Wire Way: 152 mm 304 mm Bottom Wire Way: 152 mm 304 mm
Page 1 of 3
LV PANEL DOCUMENT NO. REV
DATA SHEET
PREP'D CHK'D DATE
DAW 31-Mar-24
Project Name : Warehouse & Staff Camp Service : Distribution Panel
Location : Male Staff Camp Quantity : 1 Unit
41 Indicating Lights
43 Type: Other:
46 Protection
55 Relaying*
64 Nameplates
71 Shipping
73 Coating
* All information with an asterisk must be furnished by Vendor when not provided by Medco E&P
Page 2 of 3
LV PANEL DOCUMENT NO. REV
DATA SHEET
PREP'D CHK'D DATE
DAW 31-Mar-24
Project Name : Warehouse & Staff Camp Service : Distribution Panel
Location : Male Staff Camp Quantity : 1 Unit
Notes
Page 3 of 3