S.M. Nirman Infrastructure & Development Pvt. Ltd.

20/3, S.N. Roy Road, Kolkata-700 038


Contractor Name : - Minarul Islam
BILL Date :- 08.03.2024 Bill No . 11th RA Bill Period:- 01.02.2024
PROJECT :- CORE & SHELL WORK FOR TOWER 12, PODIUM, UGR, STP & RAC AT USSHAR, BATANAGAR, KOLKATA
SL UPTO PREVIOUS PRESENT BILL
DESCRIPTION OF WORK Unit Rate
NO. QUANTITY AMOUNT QUANTITY
T12 1st Floor
1 Block Work 200 mm thk Cum 850.000 16.760 ₹ 14,246.00 -
2 Block Work 100 mm thk Sq.M 150.000 57.420 ₹ 8,613.00 -
3 Vertical Post above 150mm thk Rmt 220.000 75.300 ₹ 16,566.00 -
4 Vertical Post less 150mm thk Rmt 200.000 47.000 ₹ 9,400.00 -
Toilet,Kitchen & Toilet Shaft
5 Thresold 100mm*250mm Rmt 150.000 27.400 ₹ 4,110.00 -
Toilet,Kitchen & Toilet Shaft
6 Thresold 200mm*250mm Rmt 175.000 3.475 ₹ 608.13 -
7 Lintel 125mm to 150mm thk Rmt 200.000 30.000 ₹ 6,000.00 -
8 R.C.C Band 80mm thk Rmt 150.000 122.650 ₹ 18,397.50 -
9 Inside Plaster Sq.M 110.000 1,185.359 ₹ 130,389.46 -
10 Door Frame nos 250.000 - ₹ - -
T12 2nd Floor
1 Block Work 200 mm thk Cum 850.000 24.920 ₹ 21,182.00 -
2 Block Work 100 mm thk Sq.M 150.000 97.420 ₹ 14,613.00 -
3 Vertical Post above 150mm thk Rmt 220.000 100.000 ₹ 22,000.00 -
4 Vertical Post less 150mm thk Rmt 200.000 77.500 ₹ 15,500.00 -
Toilet,Kitchen & Toilet Shaft
5 Thresold 100mm*250mm Rmt 150.000 43.800 ₹ 6,570.00 -
Toilet,Kitchen & Toilet Shaft
6 Thresold 200mm*250mm Rmt 175.000 5.270 ₹ 922.25 -
7 Lintel 125mm to 150mm thk Rmt 200.000 41.265 ₹ 8,253.00 -
8 R.C.C Band 80mm thk Rmt 150.000 164.450 ₹ 24,667.50 -
9 Inside Plaster Sq.M 110.000 1,460.424 ₹ 160,646.61 -
10 Door Frame nos 250.000 14.000 ₹ 3,500.00 -
T12 3rd Floor
1 Block Work 200 mm thk Cum 850.000 24.920 ₹ 21,182.00 -
2 Block Work 100 mm thk Sq.M 150.000 97.420 ₹ 14,613.00 -
3 Vertical Post above 150mm thk Rmt 220.000 100.000 ₹ 22,000.00 -
4 Vertical Post less 150mm thk Rmt 200.000 77.500 ₹ 15,500.00 -
Toilet,Kitchen & Toilet Shaft
5 Thresold 100mm*250mm Rmt 150.000 43.800 ₹ 6,570.00 -
Toilet,Kitchen & Toilet Shaft
6 Thresold 200mm*250mm Rmt 175.000 5.270 ₹ 922.25 -
7 Lintel 125mm to 150mm thk Rmt 200.000 41.265 ₹ 8,253.00 -
8 R.C.C Band 80mm thk Rmt 150.000 164.450 ₹ 24,667.50 -
9 Inside Plaster Sq.M 110.000 1,032.715 ₹ 113,598.62 -
10 Door Frame nos 250.000 - ₹ - -
T12 4th Floor
1 Door Frame nos 250.000 32.000 ₹ 8,000.00 -
2 Block Work 200 mm thk Cum 850.000 1.100 ₹ 935.00 -
3 Block Work 100 mm thk Sq.M 150.000 7.090 ₹ 1,063.50 -
4 Inside Plaster Sq.M 110.000 66.885 ₹ 7,357.30 -
T12 5th Floor
10 Door Frame nos 250.000 34.000 ₹ 8,500.00 -
T12 Out Side
1 Out Side Plaster Sq.M 190.00 1,204.980 ₹ 228,946.20 -
2 Plaster Bit Making 40mm*25mm Rmt 50.00 117.585 ₹ 5,879.25 -
Plaster groove Making
3 20mm*20mm Rmt 20.00 117.585 ₹ 2,351.70 -
R.A.C Ground Floor
1 Block Work 200 mm thk Cum 850.00 21.500 ₹ 18,275.00 -
2 Block Work 100 mm thk Sq.M 150.00 1.290 ₹ 193.50 -
3 R.C.C Post Rmt 200.00 41.680 ₹ 8,336.00 -
4 R.C.C Band Rmt 150.00 25.000 ₹ 3,750.00 -
5 Inside Plaster Sq.M 110.00 721.200 ₹ 79,332.00 -
R.A.C 1st Floor
1 Block Work 200 mm thk Cum 850.00 45.500 ₹ 38,675.00 -
2 R.C.C Post Rmt 200.00 65.900 ₹ 13,180.00 -
3 R.C.C Band Rmt 150.00 25.000 ₹ 3,750.00 -
R.A.C 2nd Floor
1 Block Work 200 mm thk Cum 850.00 41.110 ₹ 34,943.50 -
2 Block Work 100 mm thk Sq.M 150.000 40.730 ₹ 6,109.50 -
3 Vertical Post above 150mm thk Rmt 220.000 62.600 ₹ 13,772.00 -
4 Vertical Post less 150mm thk Rmt 200.000 17.400 ₹ 3,480.00 -
Toilet,Kitchen & Toilet Shaft
5 Thresold 100mm*250mm Rmt 150.000 16.000 ₹ 2,400.00 -
Toilet,Kitchen & Toilet Shaft
6 Thresold 200mm*250mm Rmt 175.000 14.630 ₹ 2,560.25 -
7 Lintel 125mm to 150mm thk Rmt 200.000 7.760 ₹ 1,552.00 -
8 R.C.C Band 80mm thk Rmt 150.000 153.200 ₹ 22,980.00 -
R.A.C Out Side
1 Out Side Plaster Sq.M 190.00 679.237 ₹ 129,055.00 -
2 Block Work 100 mm thk Sq.M 150.000 112.186 ₹ 16,827.94 -
3 Block Work 200 mm thk Cum 850.00 13.800 ₹ 11,730.00 -
4 Red Brick Work 125mm thk Sq.M 180.000 43.100 ₹ 7,758.00 -
5 Vertical Post above 150mm thk Rmt 220.000 47.000 ₹ 10,340.00 -
6 R.C.C Band 80mm thk Rmt 150.000 185.000 ₹ 27,750.00 -
R.A.C
1 Scaffolding Cum 25.00 410.302 ₹ 10,257.55 -
2 De-Scaffolding Cum 15.00 79.866 ₹ 1,197.99 -
6th RA Bill
RAC
1 200 MM Thk. Block Work Cum 850.00 21.600 ₹ 18,360.00 -
2 Block Work Less than 200 MM Sq.M 150.00 6.960 ₹ 1,044.00 -
thk.

3 200 MM Thk. Red Brick Work Cum 220.00 0.430 ₹ 94.60 -


4 100 MM Thk. Threshold Rmt 150.00 2.650 ₹ 397.50 -
5 200 MM Thk. Threshold Rmt 175.00 20.250 ₹ 3,543.75 -
6 Mullian Less than 150 mm Thk. Rmt 200.00 2.550 ₹ 510.00 -

7 Mullian Greater than 150 mm Rmt 220.00 21.950 ₹ 4,829.00 -


Thk.

8 80 MM thk. Band /Cping Beam Rmt 150.00 65.850 ₹ 9,877.50 -


9 Inside plaster Sq.M 110.00 74.400 ₹ 8,184.00 -
T12

1 Block Work Less than 200 MM Sq.M 150.00 10.330 ₹ 1,549.50 -


thk.
2 100 MM Thk. Threshold Rmt 150.00 6.000 ₹ 900.00 -
2 Mullian Less than 150 mm Thk. Rmt 200.00 8.130 ₹ 1,626.00 -

4 80 MM thk. Band /Cping Beam Rmt 150.00 7.130 ₹ 1,069.50 -


5 Inside plaster Sq.M 110.00 186.000 ₹ 20,460.00 -
7th RA Bill
RAC
1 200 MM Thk. Block Work Cum 850.00 25.880 ₹ 21,998.00 -
2 Mullian Greater than 150 mm Rmt 220.00 22.900 ₹ 5,038.00 -
Thk.

3 80 MM thk. Band /Coping Beam Rmt 150.00 90.000 ₹ 13,500.00 -


4 Inside plaster Sq.M 110.00 316.250 ₹ 34,787.50 -
5 Outside plaster Sq.M 190.00 174.990 ₹ 33,248.10 -
T12
1 200 MM Thk. Block Work Cum 850.00 5.510 ₹ 4,683.50 -
2 Mullian Greater than 150 mm Rmt 220.00 4.200 ₹ 924.00 -
Thk.

3 80 MM thk. Band /Coping Beam Rmt 150.00 16.450 ₹ 2,467.50 -


4 Inside plaster Sq.M 110.00 162.420 ₹ 17,866.20 -
8th RA Bill
RAC
1 200 MM Thk. Block Work Cum 850.00 6.990 ₹ 5,941.50 -
2 Mullian Greater than 150 mm Rmt 220.00 12.810 ₹ 2,818.20 -
Thk.

3 80 MM thk. Band /Coping Beam Rmt 150.00 - ₹ - -


4 Inside plaster Sq.M 110.00 362.520 ₹ 39,877.20 -
5 Threshold (200X250) MM Rmt 175.00 10.880 ₹ 1,904.00 -
T12
1 200 MM Thk. Block Work Cum 850.00 3.940 ₹ 3,349.00 -
2 Mullian Greater than 150 mm Rmt 220.00 3.000 ₹ 660.00 -
Thk.

3 80 MM thk. Band /Coping Beam Rmt 150.00 11.750 ₹ 1,762.50 -


4 Inside plaster Sq.M 110.00 189.290 ₹ 20,821.90 -
9th RA Bill
RAC
1 200 MM Thk. Block Work Cum 850.00 12.330 ₹ 10,480.50 -
2 100 MM Thk. Block Work Sq.M 150.00 13.700 ₹ 2,055.00 -
3 Inside Plaster Sq.M 110.00 554.840 ₹ 61,032.40 -
10th RA Bill
RAC
1 Inside Plaster Sq.M 110.00 221.180 ₹ 24,329.80 -
2 Lead & Lifting of Materials at Sq.M 65.00 1,321.000 ₹ 85,865.00 -
RAC Area
11th RA Bill
RAC
1 Inside Plaster Sq.M 110.00 - ₹ - 212.74
2 200 MM Thk. Block Work Cum 850.00 - ₹ - 6.02
3 Threshold (200X250) MM Rmt 175.00 - ₹ - 13.50
4 Mullian Greater than 150 mm Rmt 220.00 - ₹ - 20.15
Thk.
7 Lintel 125mm to 150mm thk Rmt 200.000 - ₹ - 10.00
Supply Labour
Daily Carpenter & Fitter Supply 8.0
1 Hrs / Day Nos 520.00 - ₹ - -

2 Daily Helper Supply 8.0 Hrs / Day Nos 420.00 - ₹ - -

Daily Mason Supply 8.0 Hrs /Day. Nos 600.00 752.000 ₹ 451,200.00 69.00
3
Daily Labour Supply 8.0 Hrs /Day. Nos 450.00 685.125 ₹ 308,306.25 66.00
4

Gross Bill Amount ₹ 2,672,090.39


Retantion Money 5.0 % ₹ -133,604.52
Less T.D.S. 1.0 % ₹ -26,720.90
Add If Any ₹ -
Less Materials Issued ₹ -
Less Advance Paid Including Khoraki ₹ -
Hold Amount for any work ₹ -
Round Off ₹ -0.73
Payble Bill Amount ₹ 2,511,764.24
Amount in word : One Lakh Eighty-one Thousand Eight Hundred Thirty-Eight Rupees & Eleven Paisa only.
Development Pvt. Ltd.
olkata-700 038
Minarul Islam
to 29.02.2024 PAN NO: AEKPL1094L
SHAR, BATANAGAR, KOLKATA
PRESENT BILL CUMULATIVE
Remarks
AMOUNT QUANTITY AMOUNT

₹ - 16.760 ₹ 14,246.00
₹ - 57.420 ₹ 8,613.00
₹ - 75.300 ₹ 16,566.00
₹ - 47.000 ₹ 9,400.00
₹ - 27.400 ₹ 4,110.00

₹ - 3.475 ₹ 608.13
₹ - 30.000 ₹ 6,000.00
₹ - 122.650 ₹ 18,397.50
₹ - 1,185.359 ₹ 130,389.46
₹ - - ₹ -

₹ - 24.920 ₹ 21,182.00
₹ - 97.420 ₹ 14,613.00
₹ - 100.000 ₹ 22,000.00
₹ - 77.500 ₹ 15,500.00
₹ - 43.800 ₹ 6,570.00

₹ - 5.270 ₹ 922.25
₹ - 41.265 ₹ 8,253.00
₹ - 164.450 ₹ 24,667.50
₹ - 1,460.424 ₹ 160,646.61
₹ - 14.000 ₹ 3,500.00

₹ - 24.920 ₹ 21,182.00
₹ - 97.420 ₹ 14,613.00
₹ - 100.000 ₹ 22,000.00
₹ - 77.500 ₹ 15,500.00
₹ - 43.800 ₹ 6,570.00

₹ - 5.270 ₹ 922.25
₹ - 41.265 ₹ 8,253.00
₹ - 164.450 ₹ 24,667.50
₹ - 1,032.715 ₹ 113,598.62
₹ - - ₹ -
₹ - 32.000 ₹ 8,000.00
₹ - 1.100 ₹ 935.00
₹ - 7.090 ₹ 1,063.50
₹ - 66.885 ₹ 7,357.30

₹ - 34.000 ₹ 8,500.00

₹ - 1,204.980 ₹ 228,946.20
₹ - 117.585 ₹ 5,879.25

₹ - 117.585 ₹ 2,351.70

₹ - 21.500 ₹ 18,275.00
₹ - 1.290 ₹ 193.50
₹ - 41.680 ₹ 8,336.00
₹ - 25.000 ₹ 3,750.00
₹ - 721.200 ₹ 79,332.00

₹ - 45.500 ₹ 38,675.00
₹ - 65.900 ₹ 13,180.00
₹ - 25.000 ₹ 3,750.00

₹ - 41.110 ₹ 34,943.50
₹ - 40.730 ₹ 6,109.50
₹ - 62.600 ₹ 13,772.00
₹ - 17.400 ₹ 3,480.00
₹ - 16.000 ₹ 2,400.00

₹ - 14.630 ₹ 2,560.25
₹ - 7.760 ₹ 1,552.00
₹ - 153.200 ₹ 22,980.00

₹ - 679.237 ₹ 129,055.00
₹ - 112.186 ₹ 16,827.94
₹ - 13.800 ₹ 11,730.00
₹ - 43.100 ₹ 7,758.00
₹ - 47.000 ₹ 10,340.00
₹ - 185.000 ₹ 27,750.00

₹ - 410.302 ₹ 10,257.55
₹ - 79.866 ₹ 1,197.99
₹ - 21.600 ₹ 18,360.00
₹ - 6.960 ₹ 1,044.00

₹ - 0.430 ₹ 94.60
₹ - 2.650 ₹ 397.50
₹ - 20.250 ₹ 3,543.75
₹ - 2.550 ₹ 510.00

₹ - 21.950 ₹ 4,829.00

₹ - 65.850 ₹ 9,877.50
₹ - 74.400 ₹ 8,184.00

₹ - 10.330 ₹ 1,549.50
₹ - 6.000 ₹ 900.00
₹ - 8.130 ₹ 1,626.00

₹ - 7.130 ₹ 1,069.50
₹ - 186.000 ₹ 20,460.00

₹ - 25.880 ₹ 21,998.00
₹ - 22.900 ₹ 5,038.00

₹ - 90.000 ₹ 13,500.00
₹ - 316.250 ₹ 34,787.50
₹ - 174.990 ₹ 33,248.10

₹ - 5.510 ₹ 4,683.50
₹ - 4.200 ₹ 924.00

₹ - 16.450 ₹ 2,467.50
₹ - 162.420 ₹ 17,866.20

₹ - 6.990 ₹ 5,941.50
₹ - 12.810 ₹ 2,818.20

₹ - - ₹ -
₹ - 362.520 ₹ 39,877.20
₹ - 10.880 ₹ 1,904.00

₹ - 3.940 ₹ 3,349.00
₹ - 3.000 ₹ 660.00

₹ - 11.750 ₹ 1,762.50
₹ - 189.290 ₹ 20,821.90

₹ - 12.330 ₹ 10,480.50
₹ - 13.700 ₹ 2,055.00
₹ - 554.840 ₹ 61,032.40

₹ - 221.180 ₹ 24,329.80
₹ - 1,321.000 ₹ 85,865.00

₹ 23,401.40 212.740 ₹ 23,401.40


₹ 5,117.00 6.020 ₹ 5,117.00
₹ 2,362.50 13.500 ₹ 2,362.50
₹ 4,433.00 20.150 ₹ 4,433.00
₹ 2,000.00 10.000 ₹ 2,000.00

₹ - - ₹ -

₹ - - ₹ -

₹ 41,400.00 821.000 ₹ 492,600.00

₹ 29,700.00 751.125 ₹ 338,006.25

₹ 108,413.90 ₹ 2,780,504.29
₹ -5,421.00 ₹ -139,025.52
₹ -1,084.00 ₹ -27,804.90
₹ - ₹ -
₹ - ₹ -
₹ - ₹ -
₹ - ₹ -
₹ 0.73 ₹ -
₹ 101,909.63 ₹ 2,613,673.87
Rupees & Eleven Paisa only.
RA-5 Date-06/09/2023
Sl
Description No. Length Breadth Height Unit Qty Remarks
No.
(mt.) (mt.) (mt.)
Outside Plaster of RAC Left Facia.
1 Beam With Balancing Tank 1 10.800 1.650 Sqmt 17.820
2 Side Wall 1 0.675 4.575 Sqmt 3.088
3 post 4 0.200 4.575 Sqmt 3.660
4 Planter 1 6.150 1.150 Sqmt 7.073
5 Planter 1 5.750 0.525 Sqmt 3.019
6 Planter 1 2.826 4.570 Sqmt 12.915
7 Wall 1 5.375 1.675 Sqmt 9.003
8 Stair with mumpty 1 10.400 11.275 Sqmt 117.260
9 Turning 1 0.600 11.275 Sqmt 6.765
Total Sqmt 180.600
Deduction for window
1 Stair Window 1 1.2 10.325 Sqmt 12.390
2 Window 1 2.5 2.875 Sqmt 7.188
3 Cut out 1 0.75 0.4 Sqmt 0.300
Total deduction Sqmt 19.900
Total Plaster 160.70
RAC Block Work (outside)
1 1 0.675 0.200 4.575 Cumt 0.618
2 1 4.650 0.400 9.750 Cumt 18.135
3 1 3.200 0.400 9.750 Cumt 12.480
4 2 0.500 0.200 9.750 Cumt 1.950
5 1 10.400 0.200 0.450 Cumt 0.936
Total Cumt 34.100
Deduction for Post,Band,Window
1 Window 1 1.200 0.400 10.325 Cumt 4.956
2 1 0.900 0.400 2.500 Cumt 0.900
3 Shaft 1 0.700 0.200 0.400 Cumt 0.056
4 Stair Beam 3 4.900 0.200 0.500 Cumt 1.470
5 Beside Stair Beam 3 5.200 0.400 0.900 Cumt 5.616
6 Above Roof 1 10.400 0.200 0.800 Cumt 1.664
7 1 2.650 0.200 1.100 Cumt 0.583
8 1 2.850 0.200 0.800 Cumt 0.456
9 Post 1 0.350 0.200 2.250 Cumt 0.158
2 0.400 0.200 8.550 Cumt 1.368
1 0.200 0.200 5.350 Cumt 0.214
2 0.200 0.200 10.050 Cumt 0.804

Band 6 1.950 0.200 0.080 Cumt 0.187


Band 6 2.250 0.200 0.080 Cumt 0.216
Band 6 3.000 0.200 0.080 Cumt 0.288
Band 6 3.300 0.200 0.080 Cumt 0.317
Band 6 0.475 0.200 0.080 Cumt 0.046
Post of Window 2 0.900 0.200 0.200 Cumt 0.072
Band of Window 2 2.500 0.800 0.200 Cumt 0.800
Post of Shaft 2 0.400 0.200 0.200 Cumt 0.032
Band of Shaft 2 0.700 0.200 0.200 Cumt 0.056
Total Deduction Cumt 20.300
Total Block Work Cumt 13.800
R.C.C Band 80mm thk
Band 6 1.950 Rmt 11.700
Band 6 2.250 Rmt 13.500
Band 6 3.000 Rmt 18.000
Band 6 3.300 Rmt 19.800
Band 6 0.475 Rmt 2.850
Band of Window 2 2.500 Rmt 5.000
Band of Shaft 2 0.700 Rmt 1.400
Band Beam 15 2.05 Rmt 30.750
R.C.C Band 30 2.05 Rmt 61.500
4th RA
Band Beam 3 2.05 Rmt 6.150
R.C.C Band 7 2.05 Rmt 14.350
Total Band Work Rmt 185.000
Vertical Post above 150mm thk
Post 1 2.250 Rmt 2.250
2 8.550 Rmt 17.100
1 5.350 Rmt 5.350
2 10.050 Rmt 20.100
Post of Window 2 0.900 Rmt 1.800
Post of Shaft 2 0.200 Rmt 0.400
Total Post Work Rmt 47.000

Total Amt.
T- 12
T-12 3rd Fl Corridor Plaster
1 Wall 2 28.58 2.85 Sqmt 162.91
2 1.5 2.85 Sqmt 8.55
Celling 1 Sqmt 48.49 Polyline Dwg
Sqmt 219.95
Deduction
1 Passage Window 1 5.6 0.95 Sqmt 5.32
2 Door 4 1.05 2.15 Sqmt 9.03
3 FCD 2 1.2 2.15 Sqmt 5.16
4 SAFT 1 1.85 2.3 Sqmt 4.26
1 0.75 2.25 Sqmt 1.69
1 6.25 2.85 Sqmt 17.81
1 3.6 2.3 Sqmt 8.28
Sqmt 51.54
Total Sqmt 168.40
Stair-1 For 1st To 3rd Floor Plaster
1 Side Wall 2 5 2.9 Sqmt 29.00
2 Side Wall 2 3 2.9 Sqmt 17.40
3 Celling 1 15 Sqmt 15.00 Polyline Dwg
Sqmt 61.40
Deduction 0.00
1 W5 1 1.2 1.2 Sqmt 1.44
2 FCD 1 1.2 2.15 Sqmt 2.58
3 HVAC Shaft 5 0.55 0.3 Sqmt 0.83
Sqmt 4.85
Total Sqmt 56.56

Stair-2 For 1st To 3rd Floor Plaster


1 Side Wall 2 5 2.9 Sqmt 29.00
2 Side Wall 2 3 2.9 Sqmt 17.40
3 Celling 1 15 Sqmt 15.00 Polyline Dwg
Sqmt 61.40
Deduction
1 W5 1 1.2 1.2 Sqmt 1.44
2 FCD 1 1.2 2.15 Sqmt 2.58
3 Cutout 1 1.3 2.15 Sqmt 2.80
3 HVAC Shaft 5 0.55 0.3 Sqmt 0.83
Sqmt 7.64
Total Sqmt 53.76
Stair 1 & 2 , 4th to 5th Fl Plaster
1 Side Wall 2 3.5 1.55 Sqmt 10.85
2 Side Wall 2 1.5 2.9 Sqmt 8.70
3 Side Wall 2 3 1.55 Sqmt 9.30
28.85
Deduction
1 W5 2 1.2 1.2 Sqmt 2.88
2 HVAC Shaft 2 0.55 0.3 Sqmt 0.33
3.21
Total Sqmt 25.64

4H Flat Plaster
1 Wall 1 2.2 2.935 Sqmt 6.46
2 Wall 1 0.5 2.935 Sqmt 1.47
3 Celling 1 0.6 2.2 Sqmt 1.32
Total 9.24
1st Fl Planter Wall & Balcony Sill Plaster
1 Planter 2 0.7 1.3 Sqmt 1.82
Planter 2 0.25 1.3 Sqmt 0.65
Planter Middle Partition 4 0.7 0.25 Sqmt 0.7
Planter 1 0.25 1.3 Sqmt 0.325
Planter 1 0.25 1.3 Sqmt 0.325
Planter Middle Partition 2 0.25 0.25 Sqmt 0.125
Balcony Sill 2 1.2 0.2 Sqmt 0.48
Balcony Sill Top 2 1.2 0.2 Sqmt 0.48
Total 4.905
2nd Fl Planter Wall & Balcony Sill Plaster
1 Planter 3 0.7 1.3 Sqmt 2.73
Planter 3 0.25 1.3 Sqmt 0.975
Planter Middle Partition 6 0.7 0.25 Sqmt 1.05
Planter 2 0.25 1.3 Sqmt 0.65
Planter 2 0.25 1.3 Sqmt 0.65
Planter Middle Partition 4 0.25 0.25 Sqmt 0.25
Balcony Sill 3 1.2 0.2 Sqmt 0.72
Balcony Sill Top 3 1.2 0.2 Sqmt 0.72
7.745
3rd Fl Planter Wall & Balcony Sill Plaster
1 Planter 3 0.7 1.3 Sqmt 2.73
Planter 3 0.25 1.3 Sqmt 0.975
Planter Middle Partition 6 0.7 0.25 Sqmt 1.05
Planter 2 0.25 1.3 Sqmt 0.65
Planter 2 0.25 1.3 Sqmt 0.65
Planter Middle Partition 4 0.25 0.25 Sqmt 0.25
Balcony Sill 3 1.2 0.2 Sqmt 0.72
Balcony Sill Top 3 1.2 0.2 Sqmt 0.72
Total 7.745
1st Fl ,Flat - F , Utility Plaster
Wall 2 1.675 2.935 Sqmt 9.83
Wall 1 1.4 2.935 Sqmt 4.11
Celling 1 2.48 Sqmt 2.48 Polyline Dwg
16.42
Deduction For Door & Window
W3a 1 0.6 0.9 Sqmt 0.54
D18 1 0.75 2.15 Sqmt 1.61
2.15
14.27
2nd Fl ,Flat - F , Utility Plaster
Wall 2 1.675 2.935 Sqmt 9.83
Wall 1 1.4 2.935 Sqmt 4.11
Celling 1 2.48 Sqmt 2.48 Polyline Dwg
16.42
Deduction For Door & Window
W3a 1 0.6 0.9 Sqmt 0.54
D18 1 0.75 2.15 Sqmt 1.61
2.15
14.27
3rd Fl ,Flat - F , Utility Plaster
Wall 2 1.675 2.935 Sqmt 9.83
Wall 1 1.4 2.935 Sqmt 4.11
Celling 1 2.48 Sqmt 2.48 Polyline Dwg
16.42
Deduction For Door & Window
W3a 1 0.6 0.9 Sqmt 0.54
D18 1 0.75 2.15 Sqmt 1.61
2.15
14.27
T-12 Total Plaster 376.80
1st Fl Cutout B/W
Wall 1 1.8 0.2 2.45 Cumt 0.88
Deduction For Post, Band,Cut Out
Cut Out 1 0.55 0.2 0.3 Cumt 0.03
Band 2 1.8 0.2 0.08 Cumt 0.06
Band 1 0.55 0.2 0.08 Cumt 0.01
Post 2 0.2 0.2 0.3 Cumt 0.02
0.12
0.76
2nd Fl Cutout B/W
Wall 1 1.8 0.2 2.45 Cumt 0.88
Deduction For Post, Band,Cut Out
Cut Out 1 0.55 0.2 0.3 Cumt 0.03
Band 2 1.8 0.2 0.08 Cumt 0.06
Band 1 0.55 0.2 0.08 Cumt 0.01
Post 2 0.2 0.2 0.3 Cumt 0.02
0.12
Total 0.76
3rd Fl Cutout B/W
Wall 1 1.8 0.2 2.45 Cumt 0.88
Deduction For Post, Band,Cut Out
Cut Out 1 0.55 0.2 0.3 Cumt 0.03
Band 2 1.8 0.2 0.08 Cumt 0.06
Band 1 0.55 0.2 0.08 Cumt 0.01
Post 2 0.2 0.2 0.3 Cumt 0.02
0.12
Total 0.76
T-12 Total B/W 2.28
1st , 2nd , 3rd Fl Cutout B/W Post
Post 6 0.3 Rmt. 1.8
1st , 2nd , 3rd Fl Cutout B/W Band
Band 6 1.8 Rmt. 10.8
Band 3 0.55 Rmt. 1.65
Total 12.45
₹ 30,533.00
₹ 11,730.00

₹ 27,750.00

₹ 10,340.00

₹ 80,353.00
129.49
22.01
190.41
34.88
4.15
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M) UOM
(M)
RA-6
1.0 200 MM Thk. Block Work
1.1 Tower- RAC
2nd Floor Level Lift Lobby & Staircase
a. CC-37A to CC37B 1 3.000 0.200 2.700 Cum
b. CC-37B to CC38 1 2.000 0.200 2.550 Cum
c. CC-37B to CC50 1 5.000 0.200 3.100 Cum
d. CC-49 to CC50 1 3.000 0.200 2.700 Cum
e. Deductions for FCD1 -1 1.200 0.200 2.100 Cum
f. Deductions for Beam -1 5.000 0.200 0.500 Cum

g. Deductions for Band Beam -4 3.000 0.200 0.100 Cum

h. Deductions for Band Beam -2 2.000 0.200 0.100 Cum


i. Deductions for Mullian -1 0.200 0.200 3.100 Cum
j. Deductions for Band Beam -2 3.200 0.200 0.100 Cum
k. Deductions for Band Beam -1 1.200 0.200 0.150 Cum
3rd Floor Level Lift Lobby & Staircase
a. CC-37A to CC37B 1 3.000 0.200 2.760 Cum
b. CC-37B to CC38 1 2.000 0.200 3.400 Cum
c. CC-37B to CC50 1 5.000 0.200 3.750 Cum
d. CC-49 to CC50 1 3.000 0.200 4.580 Cum
e. Deductions for FCD1 -1 1.200 0.200 2.100 Cum
f. Deductions for Beam -1 5.000 0.200 0.700 Cum

g. Deductions for Band Beam -4 3.000 0.200 0.100 Cum

h. Deductions for Band Beam -2 2.000 0.200 0.100 Cum


i. Deductions for Mullian -1 0.200 0.200 3.750 Cum
j. Deductions for Band Beam -2 3.200 0.200 0.100 Cum
k. Deductions for Band Beam -1 1.200 0.200 0.150 Cum
4th Floor Level Lift Lobby & Staircase
a. CC-37A to CC37B 1 3.000 0.200 2.550 Cum
b. CC-37B to CC38 1 2.000 0.200 2.350 Cum
c. CC-37B to CC50 1 5.000 0.200 2.650 Cum
d. Deductions for FCD1 -1 1.200 0.200 2.100 Cum

g. Deductions for Band Beam -4 3.000 0.200 0.100 Cum

h. Deductions for Band Beam -2 2.000 0.200 0.100 Cum


i. Deductions for Door Opening -1 1.200 0.200 2.100 Cum
j. Lift well right Side Shaft 1 3.550 0.200 2.450 Cum
k. Deductions for Mullian -2 0.200 0.200 2.650 Cum
l. Deductions for Mullian -2 0.200 0.200 2.450 Cum
m. Deductions for Mullian -1 0.200 0.200 2.450 Cum
n. Deductions for Mullian -1 0.300 0.200 2.450 Cum
o. Deductions for threshold -1 3.550 0.200 0.300 Cum
p. Lift Lobby Right Side Wall 1 3.300 0.200 2.300 Cum
Above Terrace Level
a. CC-37A to CC37B 1 3.300 0.200 0.370 Cum
b. CC-37B to CC38 1 3.700 0.200 0.370 Cum
c. CC38 Offset Covering 1 0.500 0.200 2.950 Cum
d. 1SW3 to LW1 1 2.285 0.200 0.370 Cum
e. Lift well right Side Shaft 1 2.950 0.200 1.765 Cum
f. Deductions for Mullian -1 0.500 0.200 0.370 Cum
Total Qty. of 200 MM thk. Block Work Cum

2.0 Block Work Less than 200 MM thk.


2.1 Tower- T12
2 & 3rd Floor Level
nd

2 1.025 1.300 Sqm


a. 3BHK-G Flat Utility Parapet Wall
2 0.400 2.925 Sqm
b. Deductions for Coping -2 1.425 0.080 Sqm
c. Deductions for Mullian -2 0.125 1.625 Sqm
2 1.025 1.300 Sqm
d. 3BHK-E Flat Utility Parapet Wall
2 0.400 2.925 Sqm
e. Deductions for Coping -2 1.425 0.080 Sqm
f. Deductions for Mullian -2 0.125 1.625 Sqm

g. 3BHK-E & G Flat Utility Parapet Wall -4 0.400 0.300 Sqm

1st Floor Level


1 1.025 1.300 Sqm
h. 3BHK-E Flat Utility Parapet Wall
1 0.400 2.925 Sqm
i. Deductions for Coping -1 1.425 0.080 Sqm
j Deductions for Mullian -1 0.125 1.625 Sqm

k. 3BHK-E & G Flat Utility Parapet Wall -1 0.400 0.300 Sqm

Total Qty. of Block Work for T12 Sqm


2.2 Tower- RAC
a. Lift Well Left Side Shaft 1 2.650 2.550 Sqm
b. Deductions for Band -1 2.650 0.100 Sqm
c. Deductions for Mullian -1 0.200 2.550 Sqm
d. Lift Well Left Side Shaft 1 2.650 0.370 Sqm
Total Qty. of Block Work for RAC Sqm
Total Qty. of Block Work less than 200 MM

3.0 200 MM Thk. Red Brick Work


3.1 Tower- RAC
Above Terrace Level
a. LW1 1 2.000 0.200 1.200 Cum
b. Deductions for opening -1 0.450 0.200 0.610 Cum
Total Qty. of 125 MM thk. Block Work Cum

4.0 100 MM Thk. Threshold


4.1 Tower- T12

3BHK-E & G Flat Utility Parapet Wall 5 1.200 Rmt

Total Qty. of Threshold at T12 Rmt


4.2 Tower- RAC
Lift well left Side Shaft 1 2.65 Rmt
Total Qty. of Threshold at RAC Rmt
Total Qty. of 100 Thk. Threshold

5.0 200 MM Thk. Threshold


5.1 Tower- RAC
Shaft Near CC-50 3 3.300 Rmt
Shaft right side of LW1 3 3.450 Rmt
Total Qty. of Threshold at RAC Rmt

6.0 Mullian Less than 150 mm Thk.


6.1 Tower- RAC
Above Terrace Level
a. Mullian at 4th Floor Lvl. 1 2.550 Rmt
6.2 Tower- T12
1st,2nd & 3rd Fl. Lvl.
b. 3BHK-G & E 5 1.625 Rmt
Total Qty. of Mullian Less than 150 MM Rmt

7.0 Mullian Greater than 150 mm Thk.


7.1 Tower- RAC
a. Mullian at 2nd Fl. Lvl. 1 3.100 Rmt
b. Mullian at 3rd Fl. Lvl. 1 3.750 Rmt
c. Mullian at 4th Fl. Lvl. 1 15.100 Rmt

Total Qty. of Mullian Grater than 150 MM Rmt

8.0 80 MM thk. Band /Cping Beam


8.1 Tower- RAC
a. Band at 2nd Fl. Lvl. 1 23.600 Rmt
b. Band at 3rd Fl. Lvl. 1 23.600 Rmt
c. Band at 4th Fl. Lvl. 1 18.650 Rmt
Total Qty. of Band/Coping Beam of RAC Rmt
8.2 Tower- T12
a. Coping beam at 2nd,3rd Fl. Lvl. 1 5.700 Rmt
b. Band at 1st Fl. Lvl. 1 1.425 Rmt
Total Qty. of Band/Coping Beam of T12 Rmt
Total Qty. of Band/Coping Beam

9.0 Inside plaster


9.1 Tower -T12
3 Floor Level
rd

a. Parking Side
SW-15 to SW-19 1 17.080 3.675 Sqm
SW-24 TO SW-28 1 17.080 3.675 Sqm
Grid D to E 4 3.200 3.675 Sqm
Deductions for opening -4 2.000 0.800 Sqm
Deductions for Ramp -1 5.000 0.600 Sqm
Deductions for D11A -1 1.050 2.100 Sqm
2nd & 3rd Floor Level
4 1.025 1.300 Sqm
b. 3BHK-G Flat Utility Parapet Wall
4 0.400 2.925 Sqm
4 1.025 1.300 Sqm
c. 3BHK-E Flat Utility Parapet Wall
4 0.400 2.925 Sqm
1st Floor Level
2 1.025 1.300 Sqm
d. 3BHK-E Flat Utility Parapet Wall
2 0.400 2.925 Sqm
Total Qty. of Inside Plaster of T12 Sqm
9.2 Tower- RAC
Ground Floor Level
Column Inside: CC-13 to CC-18 6 2.500 4.400 Sqm
Prefunction Area left & Right Side
2 1.400 3.000 Sqm
Shaft Inside
Total Qty. of Inside Plaster of RAC Sqm
Total Qty. of Inside Plaster
ET
Total
Quantity Remarks
Quantity

1.620
1.020
3.100
1.620
-0.500
-0.500
CC-37A to CC37B,
-0.240
CC-49 to CC50
-0.080 CC-37B to CC-38
-0.120
-0.130
-0.040

1.660
1.360
3.750
2.750
-0.500
-0.700
CC-37A to CC37B,
-0.240
CC-49 to CC50
-0.080 CC-37B to CC-38
-0.150
-0.130
-0.040

1.530
0.940
2.650
-0.500
CC-37A to CC37B,
-0.240
CC-49 to CC50
-0.080 CC-37B to CC-38
-0.500
1.740
-0.210
-0.200
-0.100
-0.150
-0.210
1.520

0.240
0.270
0.300
0.170
1.040
-0.040
21.600

2.670
2.340
-0.230
-0.410
2.670
2.340
-0.230
-0.410

-0.480

1.330
1.170
-0.110
-0.200

-0.120

10.330 10.330

6.760 4th to 5th Fl.


-0.270
-0.510
0.980 5th to Parapet Top
6.960 6.960
Sqm 17.290
0.480
-0.050
0.430

6.000

6.000 6.000

2.650
2.650 2.650
Rmt 8.650

9.900 2nd,3rd & 4th Fl.


10.350 2nd,3rd & 4th Fl.
20.250

2.550

8.130
10.680

3.100
3.750
15.100

21.950

23.600
23.600
18.650
65.850 65.850

5.700
1.430
7.130 7.130
Rmt 72.980

62.770
62.770
47.040
-6.400
-3.000
-2.210

5.330
4.680
5.330
4.680

2.670
2.340
186.000 186.000

66.000

8.400

74.400 74.400
Sqm 260.400
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M) UOM
(M)
RA-7
1.0 200 MM Thk. Block Work
1.1 Tower- RAC
3rd Floor Level
a. LW1 to CC-45 1 31.175 0.200 2.500 Cum
b. CC-41 to CC-15 1 15.000 0.200 1.575 Cum
c. CC-43 to CC-17 1 15.000 0.200 1.575 Cum
d CC-45 to CC-19 1 15.000 0.200 2.575 Cum
e. Deductions for Band Beam -6 15.000 0.200 0.080 Cum
f. Deductions for Columns -7 1.300 0.200 2.500 Cum
g. Deductions for Mullian -8 0.200 0.200 1.575 Cum
h. Deductions for Mullian -4 0.200 0.200 2.575 Cum
Total Qty. of 200 MM thk. Block Work Cum
1.2 Tower- T12
Lift Lobby Left Side wall (4th to 10th
a. 7 1.800 0.200 2.450 Cum
Fl.)
b. Deductions for Mullian -14 0.300 0.200 0.200 Cum
c. Deductions for Band Beam -7 1.800 0.200 0.080 Cum
d. Deductions for Band Beam -7 0.550 0.200 0.080 Cum
e. Deductions for Opening -7 0.550 0.200 0.300 Cum
Total Qty. of 200 MM thk. Block Work Cum
Total Qty. of 200 MM Thk. Block

2.0 Mullian Greater than 150 mm Thk.


2.1 Tower- RAC
Mullian at 3rd Fl. Lvl. 1 22.900 Rmt

Total Qty. of Mullian Grater than 150 MM Rmt

2.2 Tower- T12


Mullian at 4th Fl. To 10th Fl. Lvl. 1 4.200 Rmt

Total Qty. of Mullian Grater than 150 MM Rmt

3.0 80 MM thk. Band /Coping Beam


3.1 Tower- RAC
a. Band at 3rd Fl. Lvl. 1 90.000 Rmt
Total Qty. of Band/Coping Beam of RAC Rmt
3.2 Tower- T12
a. Band at 4th Fl. To 10th Fl. Lvl. 1 16.450 Rmt
Total Qty. of Band/Coping Beam of T12 Rmt
Total Qty. of Band/Coping Beam
4.0 Inside plaster
4.1 Tower -T12
a. Lift Lobby Left Side wall 7 1.800 2.450 Sqm
b. Deductions for Opening -7 0.550 0.300 Sqm
3rd Floor Level
Parking Side
12SW-30 & Adjacent Wall 1 8.535 3.675 Sqm
12SW31 & 32 both face 2 10.000 3.675 Sqm
12SW-33 & Adjacent wall 1 8.535 3.675 Sqm
Deductions for Opening -
Opening in 12SW-30 & 33 -2 2.075 0.850 Sqm
Total Qty. of Inside Plaster of T12 Sqm
4.2 Tower- RAC
1st Fl. to 5th Fl. Level
a. Staircase Inside Wall
Right & Left Side Wall 2 5.200 12.375 Sqm
Front & Back Side Wall 2 3.000 12.375 Sqm
Hanger Post (SP-1) 1 1.000 2.675 Sqm
BX-1 (Top & Sides) 1 1.000 1.250 Sqm
Deductions for Opening-
FCD -4 1.200 2.100 Sqm
FG19 1st Fl. -1 1.200 2.100 Sqm
FG19 2nd Fl. -1 1.200 2.550 Sqm
FG19 3rd Fl. -1 1.200 2.600 Sqm
FG19 4th Fl. -1 1.200 2.650 Sqm
Add for Jamb & Soffit-
FG19 1st Fl. 1 6.600 0.200 Sqm
FG19 2nd Fl. 1 7.500 0.200 Sqm
FG19 3rd Fl. 1 7.600 0.200 Sqm
FG19 4th Fl. 1 7.700 0.200 Sqm
b. Waist Slab & Landing Soffit-
1st Fl. to 2nd Fl. Level
Up Flight 1 5.330 1.500 Sqm
Down Flight 1 5.282 1.500 Sqm
Landing Beam Bottom 1 3.000 0.100 Sqm
2nd Fl. to 3rd Fl. Level
Up Flight 1 5.321 1.500 Sqm
Down Flight 1 5.321 1.500 Sqm
Steps in Half Landing 1 0.247 1.500 Sqm
Landing Beam Bottom 1 3.000 0.100 Sqm
3rd Fl. to 4th Fl. Level
Up Flight 1 5.336 1.500 Sqm
Down Flight 1 5.336 1.500 Sqm
Steps in Half & Full Landing 2 0.249 1.500 Sqm
Landing Beam Bottom 1 3.000 0.100 Sqm
4th Fl. to 5th Fl. Level
Ceiling 1 5.200 3.000 Sqm
c. 4th Floor Lift Lobby-
Lift Lobby 1 16.050 2.675 Sqm
Electric Shaft Inside 1 3.300 2.800 Sqm
ELV Shaft Inside 1 1.800 2.800 Sqm
FHC Shaft Inside 1 4.600 2.675 Sqm
RBY-5 (RBX-13 to CC38) both Side 1 4.300 0.375 Sqm
ARBX-3 Side (CC50 to 1SW-3) 1 5.450 0.375 Sqm
ARBY-5 Side (LW1 to 1SW-3) 1 1.600 0.375 Sqm
Deductions for Opening- Sqm
FCD1 -0.5 1.200 2.100 Sqm
SA2 -1 1.200 1.800 Sqm
SA6 -1 0.600 1.800 Sqm
SA7 -1 0.800 1.800 Sqm
Lift Door -1 2.000 2.100 Sqm
Opening for Swimming pool entry -1 1.600 2.300 Sqm
Total Qty. of Inside Plaster of RAC Sqm
Total Qty. of Inside Plaster

5.0 Outside plaster


5.1 Tower- RAC
Grid P-E to P-H (CC30 to CC49) upto
1 11.000 3.800 Sqm
(+) 16.850 M
Wall Inside Surface from CC37A to
CC30:Elv. from (+)12.80 M to 1 5.525 4.050 Sqm
(+)16.85 M
Wall Top From CC37A to CC30 from
1 5.400 0.200 Sqm
(+) 12.80 M to (+) 16.85 M
ARBY -1 beam top & bottom 2 4.800 0.200 Sqm
CC30 Right Side from (+) 12.425 M to
1 0.125 4.425 Sqm
(+) 16.850 M

Peripherial Wall of Staircase & Lift Sqm

Staircase & Lift Well Outside wall 1 3.600 3.450 Sqm


upto (+) 16.850 M
1 11.050 4.050 Sqm
Jamb of Passage Opening infront of
1 7.100 0.200 Sqm
Electric Shaft
(+) 15.950 Lvl. Slab Parapet Wall
1 13.750 0.900 Sqm
inside Surface
(+) 15.950 Lvl. Slab Parapet Wall top
1 13.950 0.200 Sqm
Surface
Lift Well & Shaft Front Side & Right
Side from (+) 15.950 M to (+) 18.750 1 5.450 2.800 Sqm
M

Lift Well & Shaft Back Side & Left Side


1 6.250 1.900 Sqm
from (+) 16.850 M to (+) 18.750 M

(+) 17.850 Lvl. Slab Parapet Wall


1 10.100 0.900 Sqm
inside Surface
(+) 17.850 Lvl. Slab Parapet Wall top
1 10.900 0.200 Sqm
Surface
Deductions for Opening- Sqm
Passage Opening infront of Electric
-1 1.800 2.650 Sqm
Shaft
Opening in Lift Wall -0.5 0.6 0.45 Sqm
Total Qty. of Outside Plaster of RAC Sqm
ET
Total
Quantity Remarks
Quantity

15.590
4.730
4.730
7.730
-1.440
-4.550
-0.500 Item - b & c
-0.410 Item - d
25.880 25.880

6.170

-0.170
-0.200
-0.060
-0.230
5.510 5.510
Cum 31.390

22.900

22.900

4.200

4.200

90.000
90.000 90.000

16.450
16.450 16.450
Rmt 106.450
30.870 4th Fl. To 10th Fl.
-1.160

31.370
73.500
31.370

-3.530
162.420 162.420

128.700
74.250
2.680
1.250

-10.080
-2.520
-3.060
-3.120
-3.180

1.320
1.500
1.520
1.540

8.000
7.920
0.300

7.980
7.980
0.370
0.300

8.000
8.000
0.750
0.300

15.600

42.930
9.240
5.040
12.310
1.610
2.040
0.600
0.000
-1.260
-2.160
-1.080
-1.440
-4.200
-3.680
316.250 316.250
Sqm 478.670

41.800

22.380

1.080

1.920

0.550

0.000

12.420

44.750

1.420

12.380

2.790
15.260

11.880

9.090

2.180

0.000

-4.770

-0.140
174.990 174.990
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M) UOM
(M)
RA-8
1.0 200 MM Thk. Block Work
1.1 Tower- T12
Lift Lobby Left Side wall (10th Fl. To 15th
a. 5 1.800 0.200 2.450 Cum
Fl.)
b. Deductions for Mullian -10 0.300 0.200 0.200 Cum
c. Deductions for Band Beam -5 1.800 0.200 0.080 Cum
d. Deductions for Band Beam -5 0.550 0.200 0.080 Cum
e. Deductions for Opening -5 0.550 0.200 0.300 Cum
Total Qty. of 200 MM thk. Block Work Cum
1.2 Tower- RAC
1 4.600 0.200 1.575 Cum
a. Male Changing Room Front Side Wall
1 0.950 0.200 1.975 Cum
1 3.575 0.200 1.975 Cum
b. Female Changing Room Front side wall 1 1.300 0.200 1.575 Cum
1 1.475 0.200 2.075 Cum
1 2.500 0.200 2.300 Cum
1 0.300 0.200 1.975 Cum
c. Female Changing Room Right side wall
1 2.300 0.200 3.475 Cum
1 0.300 0.200 2.825 Cum
d. Deductions for Column -1 0.400 0.200 2.075 Cum
Deductions for Stiffener Post at Female
e. -1 0.200 0.200 1.975 Cum
changing room front side wall
Deductions for Stiffener Post at Male
f. -1 0.200 0.200 1.575 Cum
changing room front side wall
Total Qty. of 200 MM thk. Block Work Cum
Total Qty. of 200 MM Thk. Block

2.0 Mullian Greater than 150 mm Thk.


2.1 Tower- RAC
Mullian at 3rd Fl. To 4th Fl. Lvl. 1 3.550 Rmt
Mullian at 3rd Fl. To 4th Fl. Lvl. 1 4.625 Rmt
Post at Yoga Area 2nd to 4th Fl. Lvl. 1 4.625 Rmt

Total Qty. of Mullian Grater than 150 MM Rmt

2.2 Tower- T12


Mullian at 10th Fl. To 15th Fl. Lvl. 1 3.000 Rmt

Total Qty. of Mullian Grater than 150 MM Rmt

3.0 80 MM thk. Band /Coping Beam


3.1 Tower- RAC
a. Band at 3rd Fl. Lvl. 1 0.000 Rmt
Total Qty. of Band/Coping Beam of RAC Rmt
3.2 Tower- T12
a. Band at 10th Fl. To 15th Fl. Lvl. 1 11.750 Rmt
Total Qty. of Band/Coping Beam of T12 Rmt
Total Qty. of Band/Coping Beam

4.0 Inside plaster


4.1 Tower -T12
3 Floor Level
rd

Parking Area-
1 2.175 3.575 Sqm
12SW-30 & Adjacent Wall
1 7.160 3.675 Sqm
1 2.400 3.675 Sqm
12SW31 both face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
12SW-15 to 1st Ramp Landing 1 7.840 3.675 Sqm
1st Ramp Landing Portion 1 1.500 3.125 Sqm
Ramp Portion 1 2.000 3.025 Sqm
2nd Ramp Landing Portion 1 1.500 2.925 Sqm
2nd Ramp Landing Portion to SW-19 1 2.640 3.675 Sqm
1 2.400 3.675 Sqm
12SW-32 Both Face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
1 7.160 3.675 Sqm
12SW-33 & Adjacent wall
1 2.175 3.575 Sqm
1 2.175 3.575 Sqm
12SW-34 & Adjacent Wall
1 7.160 3.675 Sqm
1 2.400 3.675 Sqm
12SW35 both face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
12SW-24 to 12SW-28 1 15.480 3.675 Sqm
1 2.400 3.675 Sqm
12SW-36 Both Face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
1 7.160 3.675 Sqm
12SW-37 & Adjacent wall
1 2.175 3.575 Sqm
4BX-30 Both Side (12SW-30 to 12SW-31) 2 5.340 0.475 Sqm
1 4.200 0.475 Sqm
4BX-30 Both Side (12SW-31 to 12SW-32)
1 4.200 0.425 Sqm
4BX-30 Both Side (12SW-32 to 12SW-33) 2 5.340 0.475 Sqm
4BX-31 Both Side (12SW-34 to 12SW-35) 2 5.340 0.475 Sqm
1 4.200 0.475 Sqm
4BX-31 Both Side (12SW-35 to 12SW-36)
1 4.200 0.425 Sqm
4BX-31 Both Side (12SW-36 to 12SW-37) 2 5.340 0.475 Sqm

1 4.200 0.700 Sqm


4BX-32 (12SW-31 TO 12SW32)
1 4.200 0.650 Sqm
1 4.200 1.100 Sqm
4BX-33 (12SW35 TO 12SW36)
1 4.200 1.050 Sqm
4BY-5,9 4 3.000 0.475 Sqm
4BY-7 2 4.200 0.475 Sqm
4BY-16,6A,23 6 3.000 0.475 Sqm
4BY-19 2 4.200 0.475 Sqm
4BX-34 Side (12SW-30 to 12SW-31) 1 5.675 1.150 Sqm
4BX-34 Side (12SW-31 to 12SW-32) 1 4.000 0.400 Sqm
4BX-34 Side (12SW-32 to 12SW-33) 1 5.675 1.150 Sqm
4BX-34 Side (12SW-34 to 12SW-35) 1 5.675 1.150 Sqm
4BX-34 Side (12SW-35 to 12SW-36) 1 4.000 0.400 Sqm
4BX-34 Side (12SW-36 to 12SW-37) 1 5.675 1.150 Sqm
Deductions for Opening:-
Opening in 12SW-30,33,34 & 37 -2 2.075 0.900 Sqm
D21 -0.5 1.050 2.150 Sqm
Total Qty. of Inside Plaster of T12 Sqm
Previously Claimed Qty. (6th & 7th RA) Sqm
This Bill Quantity Sqm
4.2 Tower- RAC
2nd Fl. to 4th Fl. Level
a. Multipurpose Hall-
Wall from CC17 to CC43 2 15.000 4.625 Sqm
3BY12 Top & Bottom 2 0.400 15.000 Sqm
Wall from CC15 to CC41 1 15.000 4.625 Sqm
3BY11 Top & Bottom 1 0.400 15.000 Sqm
Wall from CC41 to CC42 1 3.475 6.150 Sqm
Wall from CC42 to CC43 1 3.475 6.150 Sqm
3BX6 Top & Bottom (CC41 to CC42) 1 3.475 1.000 Sqm
3BX6 Top & Bottom (CC42 to CC43) 1 3.475 1.000 Sqm
RBX10 Top & Bottom (CC41 to CC42) 1 3.475 0.800 Sqm
RBX10 Top & Bottom (CC42 to CC43) 1 3.475 0.800 Sqm
CC15 Inside Face 1 1.500 4.625 Sqm
CC15 Right Side 2 0.400 4.625 Sqm
CC16 Inside Face 1 1.700 4.625 Sqm
CC16 Right & Left Side 2 0.800 4.625 Sqm
CC17 Inside Face 1 1.300 4.625 Sqm
CC17 Left Side 2 0.400 4.625 Sqm

CC41 Inside Face 1 1.500 2.550 Sqm

CC41 Right Side 1 0.600 2.550 Sqm


CC42 Inside Face 1 1.700 2.550 Sqm

CC42 Right & Left Side 1 1.200 2.550 Sqm

CC43 Inside Face 1 1.500 2.550 Sqm

CC43 Left Side 1 0.600 2.550 Sqm

CC41 Inside Face 1 1.500 2.500 Sqm


CC41 Right Side 1 0.400 2.500 Sqm
CC42 Inside Face 1 1.700 2.500 Sqm
CC42 Right & Left Side 1 0.800 2.500 Sqm
CC43 Inside Face 1 1.500 2.500 Sqm
CC43 Left Side 1 0.400 2.500 Sqm
Deductions for Opening-
Opening in Wall from CC41 to CC42 -1 3.475 2.550 Sqm
Opening in Wall from CC42 to CC43 -1 3.475 2.550 Sqm
HVAC Cutout -1 1.200 0.500 Sqm
Total Qty. of Inside Plaster of RAC Sqm
Total Qty. of Inside Plaster

5.0 Threshold (200X250) MM


5.1 Tower -RAC
2nd Floor Yoga Area-
Right Side 1 3.850 Rmt
Front Side 1 10.625 Rmt
Deductions for Post (200x200) MM -1 0.200 Rmt
Deductions for Door Opening -2 1.700 Rmt
Total Qty. of Band/Coping Beam of RAC Rmt
Total
Quantity Remarks
Quantity

4.410

-0.120
-0.140
-0.040
-0.170
3.940 3.940

1.450
0.380
1.410
0.410
0.610
1.150
0.120
1.600
0.170
-0.170

-0.080

-0.060

6.990 6.990
Cum 10.930

3.550
4.630
4.630

12.810

3.000

3.000
0.000
0.000 0.000

11.750
11.750 11.750
Rmt 11.750

7.780
26.310
8.820
3.630
24.260
28.810
4.690
6.050
4.390
9.700
8.820
3.630
24.260
26.310
7.780
7.780
26.310
8.820
3.630
24.260
56.890
8.820
3.630
24.260
26.310
7.780
5.070
2.000
1.790
5.070
5.070
2.000
1.790
5.070

2.940
2.730
4.620
4.410
5.700
3.990
8.550
3.990
6.530
1.600
6.530
6.530
1.600
6.530

-3.740
-1.130
482.970
293.680
189.290 189.290

138.750 BOB =(+) 10.775 M 10.775


12.000
69.380 BOB =(+) 10.775 M
6.000
21.370 BOB =(+) 12.300 M 12.3
21.370 BOB =(+) 12.300 M
3.480
3.480
2.780
2.780
6.940
3.700
7.860
7.400
6.010
3.700
Upto 3rd Fl. Beam
6.940
Bottom
Upto 3rd Fl. Beam
3.700
Bottom
Upto 3rd Fl. Beam
6.940
Bottom
Upto 3rd Fl. Beam
3.700
Bottom
Upto 3rd Fl. Beam
6.940
Bottom
Upto 3rd Fl. Beam
3.700
Bottom
6.940 BOB = (+) 12.300 M
3.700 BOB = (+) 12.300 M
6.940 BOB = (+) 12.300 M
3.700 BOB = (+) 12.300 M
6.940 BOB = (+) 12.300 M
3.700 BOB = (+) 12.300 M

-8.860 BOB =(+) 8.700 M 8.7


-8.860 BOB =(+) 8.700 M
-0.600
362.520 362.520
Sqm 551.810

3.850
10.630
-0.200
-3.400
10.880 10.880
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M)
(M)
RA-9
1.0 Inside plaster
1.1 Tower- RAC
2nd Fl. to 3rd Fl. Level
a. Gym Area-
Wall from CC15 to CC41 2 15.800 3.050
CC14 2 2.500 3.050
CC13 2 2.500 3.050
CC12 2 2.500 3.050
Wall from CC30 to Female Changing Room
1 12.650 3.050
Corner Column
Female Changing room Right Side Wall 1 5.700 3.050

Wall from Female Changing room to CC41 1 7.975 3.050

Planter Wall 1 16.705 0.900


Post for FG near CC11 1 0.300 3.050
Parapet Wall from CC30 to FG Post 1 5.850 0.950
CC30 adjacent Wall above Parapet 1 0.675 2.100
FG Post near CC13 1 0.800 3.050
CC23 1 2.300 3.050

Ledge Wall from FG Post near CC11 to CC13 1 10.875 0.700

Add for Jamb 1 5.800 0.200


3BY11 Top & Bottom 1 15.800 0.400
Deductions for Opening-
D4 -1 1.500 2.150
Toilet Door -1 1.500 2.450
b. Multipurpose Hall Corridor Portion & Lounge-
Wall from LW1 to CC43 1 21.025 2.850
Wall adjacent to CC43 1 6.300 2.850
Wall near CC40 1 6.200 2.850
Lounge left Side wall 1 4.500 2.850
Deductions for Opening-
D4 -1 1.500 2.150
Opening beside CC42 -2 3.475 2.550
FCD1 -1 1.200 2.150
c. Lift Lobby-
Left Side Wall adjacent to Stair & FHC 1 5.700 2.925
FHC Inside 1 4.600 3.050
Front Side Wall 1 2.000 2.925
CC38 1 1.500 2.925
ELV & Electric Shaft Back Side Wall 1 1.950 3.050
3BX5 Both Side & Bottom 1 4.300 0.950
3BX8 Both Side & Bottom 1 0.895 1.050
Deductions for Opening-
FCD1 -2 1.200 2.150
SA7 -2 0.800 1.800
Total Qty. for 2nd Floor
3rd Fl. to 4th Fl. Level
2 12.800 2.300
Wall from CC15 to Swimming Pool Wall End
2 2.300 3.475
CC14 2 2.500 1.575
CC13 2 2.500 1.575
CC12 2 2.500 1.575
CC23 1 2.300 1.575
Wall from CC30 to Female Changing Room
1 12.650 1.575
Corner Column
Female Changing room Right Side Wall 1 5.700 1.575

Wall from Female Changing room to CC41 1 7.975 3.475

RBX10 Top & Bottom 1 6.675 0.400


Post for FG near CC11 1 0.300 1.575
FG Post near CC13 1 0.800 1.575
Total Qty. for 3rd Floor
Total Qty. of Inside Plaster

2.0 100 MM THK. BLOCK WORK


2.1 Tower -RAC
2nd Floor Yoga Area-
Right Side 1 16.705 0.550
Shaft adjacent to CC31 1 1.325 3.400
Total Qty. of Block Work

3.0 200 MM THK. BLOCK WORK


3.1 Tower -RAC
Male & Female Changing Room-
Shaft adjacent to CC31 1 1.675 3.400
Male Changing Room right Side Wall 1 4.175 0.350
Female Changing Room Left Side Wall 1 1.825 1.100
Female Changing Room Handwash front
1 2.875 1.100
wall
Total Qty. of Block Work
T SHEET
Total
UOM Quantity Remarks
Quantity

M2 96.380
M2 15.250
M2 15.250
M2 15.250

M2 38.582

M2 17.385

M2 24.324

M2 15.035
M2 0.915
M2 5.557
M2 1.417
M2 2.440
M2 7.015

M2 7.613

M2 1.160
M2 6.320

M2 -3.225
M2 -3.675

M2 59.921
M2 17.955
M2 17.670
M2 12.825

M2 -3.225
M2 -17.722
M2 -2.580

M2 16.672
M2 14.030
M2 5.850
M2 4.387
M2 5.947
M2 4.085
M2 0.940

M2 -5.160
M2 -2.880
Sqm 391.710 391.710

M2 58.880
M2 15.985
M2 7.875
M2 7.875
M2 7.875
M2 3.623

M2 19.924

M2 8.978

M2 27.713

M2 2.670
M2 0.473
M2 1.260
Sqm 163.130 163.130
ide Plaster Sqm 554.840

Sqm 9.190
Sqm 4.510
Sqm 13.700 13.700

M3 5.700
M3 1.460
M3 2.010

M3 3.160

Cum 12.330 12.330


MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M)
(M)
RA-10
1.0 Inside plaster
1.1 Tower- RAC
3rd Fl. to 4th Fl. Level
a. Lift Lobby -
Left Side Wall adjacent to Stair & FHC 1 5.700 3.625
FHC Inside 1 4.600 3.750
Front Side Wall 1 2.000 3.625
CC38 1 1.500 3.625
ELV & Electric Shaft Back Side Wall 1 1.950 3.750
RBX5 Both Side & Bottom 1 4.300 0.950
RBX12 Both Side & Bottom 1 0.900 0.950
Deductions for Opening-
FCD1 -2 1.200 2.150
SA7 -2 0.800 1.800
Total Qty. for Lift Lobby
b. Driveway -
Lift Shaft Back Side 1 2.700 3.400
Wall from LW1 to CC45 1 31.175 3.400
Wall from CC45 to CC19 1 16.200 3.400
Deductions for Opening-
HVAC cutout beside CC42 -1 1.200 0.500
HVAC cutout beside CC19 -1 1.050 0.450
SA9 -1 1.500 1.875
Total Qty. for Driveway
Total Qty. of Inside Plaster
2.0 Lead & Lifting of Materials at RAC Area
a. Block Work less than 200 mm Thk. -
1st Fl. to 2nd Fl. Level 1 23.700
3rd Fl. to 4th Fl. Level 1 86.500
Over Mumty Roof Slab 1 4.500
b. Block Work 200 mm Thk. -
1st Fl. to 2nd Fl. Level 1 237.650
3rd Fl. to 4th Fl. Level 1 282.950
Over Mumty Roof Slab 1 9.900
c. 12 mm Thk. Internal Plaster -
1st Fl. to 2nd Fl. Level 1 443.190
3rd Fl. to 4th Fl. Level 1 232.800
Total Working Area
T SHEET
Total
UOM Quantity Remarks
Quantity

M2 20.663
M2 17.250
M2 7.250
M2 5.438
M2 7.312
M2 4.085
M2 0.855

M2 -5.160
M2 -2.880
Sqm 54.810 54.810

M2 9.180
M2 105.995
M2 55.080

M2 -0.600
M2 -0.473
M2 -2.813
Sqm 166.370 166.370
ide Plaster Sqm 221.180

M2 23.700
M2 86.500
M2 4.500

M2 237.650
M2 282.950
M2 9.900

M2 443.190
M2 232.800
Sqm 1321.000
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M)
(M)
RA-11
1.0 Inside plaster
1.1 Tower- RAC
2nd Fl. to 3rd Fl. Level
a. Lift Lobby -
Male & Female changing room entry 1 5.150 3.050
Deductions for Opening-
Entrance Door -1 1.500 2.450
D9 -2 0.900 2.150
b. Lift Lobby -
Electric Shaft Inside Wall 1 3.300 3.150
ELV Shaft Inside Wall 1 1.800 3.150
ELV & Electric Shaft Back Side Wall -1 1.950 3.050
Driveway Entry from Lift Lobby 1 4.740 3.025
Deductions for Opening-
FCD1a -1 1.200 2.150
SA2 -1 1.200 1.800
SA6 -1 0.600 1.800
Total Qty. for Driveway
3rd Fl. to 4th Fl. Level
a.Swiming Pool Service Room -
1 35.750 2.900
Room Inside Area
1 16.550 3.475
C17 Column single face 1 0.400 1.575
C18 Column Both face 2 0.400 1.575
C19 Column Single face 1 0.400 1.575
RBY-14 Bottom 1 15.000 0.200
RBX-10 Top & Bottom 2 6.950 0.400
Deductions for Opening-
SA9 -1 1.500 1.875
FG18 -2 3.475 1.575
Add for Jambs-
FG18 2 6.625 0.200
Total Qty. for Lift Lobby
b. Lift Lobby -
Electric Shaft Inside Wall 1 3.300 3.600
ELV Shaft Inside Wall 1 1.800 3.600
ELV & Electric Shaft Back Side Wall -1 1.950 3.750
Driveway Entry from Lift Lobby 1 5.750 3.400
Deductions for Opening-
FCD1a -1 1.200 2.150
SA2 -1 1.200 1.800
SA6 -1 0.600 1.800
Total Qty. for Driveway
Total Qty. of Inside Plaster

2.0 200 MM THK. BLOCK WORK


2.1 Tower -RAC
2nd Fl. Lift Lobby -
1 1.100 0.200 2.650
ELV Shaft
1 1.800 0.200 2.850
1 1.850 0.200 2.650
Electrical Shaft
1 0.500 0.200 2.650
1 2.500 0.200 2.650
FHC Shaft
1 0.800 0.200 2.650
Deductions for Door Opening -
SA6 -1 0.600 0.200 1.800
SA2 -1 1.200 0.200 1.800
SA7 -1 0.800 0.200 1.800
FCD1 -1 1.200 0.200 2.150
Deductions for Stiffener Column -
SA6 -1 0.200 0.200 1.800
SA2 -2 0.200 0.200 1.800
SA7 -2 0.200 0.200 1.800
FCD1 -1 0.200 0.200 2.150
Deductions for Lintel Beam -
Above SA6 -1 0.900 0.200 0.150
Above SA2 -1 1.500 0.200 0.150
Above SA7 -1 1.100 0.200 0.150
Above FCD1 -1 1.500 0.200 0.150
Deductions for Threshold -
FHC Shaft -1 3.300 0.200 0.300
ELV Shaft -1 1.100 0.200 0.300
Electrical Shaft -1 2.350 0.200 0.300
Total Qty. of Block Work
3rd Fl. Lift Lobby -
ELV Shaft 1 1.100 0.200 3.350
1 2.900 0.200 3.250
Electrical Shaft 1 1.850 0.200 3.350
1 0.500 0.200 3.350
1 2.500 0.200 3.350
FHC Shaft
1 0.800 0.200 3.350
Deductions for Door Opening -
SA6 -1 0.600 0.200 1.800
SA2 -1 1.200 0.200 1.800
SA7 -1 0.800 0.200 1.800
FCD1 -1 1.200 0.200 2.150
Deductions for Stiffener Column -
SA6 -1 0.200 0.200 1.800
SA2 -2 0.200 0.200 1.800
SA7 -2 0.200 0.200 1.800
FCD1 -2 0.200 0.200 2.150
Deductions for Lintel Beam -
Above SA6 -1 0.900 0.200 0.150
Above SA2 -1 1.500 0.200 0.150
Above SA7 -1 1.100 0.200 0.150
Above FCD1 -1 1.500 0.200 0.150
Deductions for Threshold -
FHC Shaft -1 3.300 0.200 0.300
ELV Shaft -1 1.100 0.200 0.300
Electrical Shaft -1 2.350 0.200 0.300
Total Qty. of Block Work
Total Qty. of 200 MM Thk. Block Work

3.0 THRESHOLD (200X250) MM


3.1 Tower -RAC
2nd Fl. Lift Lobby -
FHC Shaft 1 3.300
ELV Shaft 1 1.100
Electrical Shaft 1 2.350
3rd Fl. Lift Lobby -
FHC Shaft 1 3.300
ELV Shaft 1 1.100
Electrical Shaft 1 2.350
Total Qty. of Threshold

4.0 MULLIAN GREATER THAN 150 MM THK.


4.1 Tower -RAC
2nd Fl. Lift Lobby -
SA6 1 1.800
SA2 2 1.800
SA7 2 1.800
FCD1 1 2.150
3rd Fl. Lift Lobby -
SA6 1 1.800
SA2 2 1.800
SA7 2 1.800
FCD1 2 2.150
Total Qty. of Mullian
5.0 LINTEL 125 MM TO 150 MM THK.
5.1 Tower -RAC
2nd Fl. Lift Lobby -
Above SA6 1 0.900
Above SA2 1 1.500
Above SA7 1 1.100
Above FCD1 1 1.500
3rd Fl. Lift Lobby -
Above SA6 1 0.900
Above SA2 1 1.500
Above SA7 1 1.100
Above FCD1 1 1.500
Total Qty. of Lintel
T SHEET
Total
UOM Quantity Remarks
Quantity

M2 15.707

M2 -3.675
M2 -3.870

M2 10.395
M2 5.670
M2 -5.947
M2 14.339

M2 -2.580
M2 -2.160
M2 -1.080
Sqm 26.800 26.800

M2 103.675
M2 57.511
M2 0.630
M2 1.260
M2 0.630
M2 3.000
M2 5.560

M2 -2.813
M2 -10.946

M2 2.650
Sqm 161.160 161.160

M2 11.880
M2 6.480
M2 -7.312
M2 19.550
M2 -2.580
M2 -2.160
M2 -1.080
Sqm 24.780 24.780
ide Plaster Sqm 212.740

Cum 0.583
Cum 1.026
Cum 0.981
Cum 0.265
Cum 1.325
Cum 0.424

Cum -0.216
Cum -0.432
Cum -0.288
Cum -0.516

Cum -0.072
Cum -0.144
Cum -0.144
Cum -0.086

Cum -0.027
Cum -0.045
Cum -0.033
Cum -0.045

Cum -0.198
Cum -0.066
Cum -0.141
Cum 2.150 2.150

Cum 0.737
Cum 1.885
Cum 1.240
Cum 0.335
Cum 1.675
Cum 0.536

Cum -0.216
Cum -0.432
Cum -0.288
Cum -0.516

Cum -0.072
Cum -0.144
Cum -0.144
Cum -0.172

Cum -0.027
Cum -0.045
Cum -0.033
Cum -0.045

Cum -0.198
Cum -0.066
Cum -0.141
Cum 3.870 3.870
Thk. Block Work Cum 6.020

Rmt 3.300
Rmt 1.100
Rmt 2.350

Rmt 3.300
Rmt 1.100
Rmt 2.350
Rmt 13.500

Rmt 1.800
Rmt 3.600
Rmt 3.600
Rmt 2.150

Rmt 1.800
Rmt 3.600
Rmt 3.600
Rmt 4.300
Rmt 20.150
Rmt 0.900
Rmt 1.500
Rmt 1.100
Rmt 1.500

Rmt 0.900
Rmt 1.500
Rmt 1.100
Rmt 1.500
Rmt 10.000
MINARUL SK
Details of JMR for Skilled & Unskilled Labour Usshar , Batanagar
Mason & Labour Work

JMR No.
SL. No.

Date Start Duration Remarks


End Time Nos. of Nos. of Total Time for Total Time for
Time of Work
(Hrs.) Mason Labour Mason (Hrs.) Labour (Hrs.)
(Hrs.) (Hrs)

1 1-Feb-24 73 8:00 AM 5:00 PM 8.00 3.0 2.0 24.00 16.00 T-12_20th Fl. Sleve finishing &
plaster work.

2 2-Feb-24 74 8:00 AM 5:00 PM 8.00 3.0 2.0 24.00 16.00 T-12_20th Fl. Sleve finishing and
window beat finishing work.

3 3-Feb-24 75 8:00 AM 5:00 PM 8.00 2.0 2.0 16.00 16.00 T-12_20th Fl. Ceiling plastering
and 21st Fl. Window beat making.

T-12_19th Fl. Hole finishing and


4 4-Feb-24 76 8:00 AM 5:00 PM 8.00 2.0 2.0 16.00 16.00 21st Fl. Window beat finishing
work.
T-12_19th Fl. Sleve finishing and
5 5-Feb-24 77 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 21st Fl. Window beat finishing
work.

6 6-Feb-24 78 8:00 AM 7:00 PM 10.00 2.0 1.0 20.00 10.00 T12: 12th & 4th Fl. Rectification
work.
T-12: 13th, 14th Fl. Sleve Fixing
7 7-Feb-24 79 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 work & 21st Fl. Balcony finishing
work.

8 8-Feb-24 80 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 T-12: 20th Fl. Balcony plaster
finishing work.
T-12_21st Fl. Window beat Fixing
9 9-Feb-24 81 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 work & 22nd Fl. Hole finishing
work.

10 10-Feb-24 82 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 T-12: 19th Fl. & 22nd Fl. Plaster
repairing work.
T12- 5th Fl. Toilet shaft block work
11 11-Feb-24 83 6:00 AM 2:00 PM 8.00 2.0 2.0 16.00 16.00 service pressarization shaft block
fixing, PVC neck fixing & plastering
work.

T12- 5th Fl. Toilet shaft block work


12 12-Feb-24 84 8:00 AM 5:00 PM 8.00 2.0 3.0 16.00 24.00 service pressarization shaft block
fixing, PVC neck fixing & plastering
work.

T12: 6th Fl. Toilet Shaft Block


13 13-Feb-24 85 8:00 AM 5:00 PM 8.00 2.0 3.0 16.00 24.00 Work and Service pressurization
shaft block fixing work and PVC
mesh fixing for plaster work.

T12-6th & &th Fl. Toilet Shaft


Block work and service
14 14-Feb-24 86 8:00 AM 5:00 PM 8.00 2.0 3.0 16.00 24.00 pressurization shaft block work,
PVC mesh fixing for plaster &
Band casting.

T-12: 5th fl. Toilet steel binding &


15 15-Feb-24 87 7:00 AM 6:00 PM 10.00 4.0 4.0 40.00 40.00 casting and service pressurization
steel binding & casting.

T12-6th & &th Fl. Toilet Shaft


16 16-Feb-24 88 7:00 AM 6:00 PM 10.00 3.0 3.0 30.00 30.00 Block work and service
pressurization shaft block work
steel binding & casting.

17 17-Feb-24 89 7:00 AM 6:00 PM 10.00 1.0 2.0 10.00 20.00 T12- 10th Fl. To 12th Fl. Block
plaster work.

18 18-Feb-24 90 6:00 AM 2:00 PM 8.00 2.0 2.0 16.00 16.00 T12- 11th Fl. Block Plaster work.

19 19-Feb-24 91 7:00 AM 6:00 PM 10.00 1.0 1.0 10.00 10.00 T12- 12th Fl. Block Plaster work.

20 20-Feb-24 92 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 T12-22nd Fl. Window beat
finishing & repair work.

21 21-Feb-24 93 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 T12-21st Fl. Window beat
finishing & plaster work.

22 22-Feb-24 94 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 T12-22nd Fl. Sleve finishing and
balcony Fixing work.
T12: 23rd Fl. Window beat
23 23-Feb-24 95 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 finishing work & 22nd Fl.
Rectification work.
T12-23rd Fl. Window beat
24 24-Feb-24 96 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 finishing work & RAC_ Fiber mesh
2nd and 3rd Fl. Lift side area fiber
mesh fixing.

T12-23rd Fl. Window beat


25 25-Feb-24 97 6:00 AM 2:00 PM 8.00 3.0 3.0 24.00 24.00 finishing work & RAC_ Fiber mesh
2nd and 3rd Fl. Lift side area fiber
mesh fixing.

T12_7th Fl. Toilet shaft brick work


& pressurization shaft brick work;
26 26-Feb-24 98 7:00 AM 6:00 PM 10.00 3.0 4.0 30.00 40.00 23rd fl. Balcony & window beat
finishing. RAC_Repairing &
rectification job on 2nd & 3rd Fl.

T12_6th & 7th Fl. Toilet shaft brick


27 27-Feb-24 99 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 work. RAC_2nd Fl. Toilet area
fiber mesh fixing.
T12_5th, 6th & 7th Fl. Toilet shaft
28 28-Feb-24 100 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 brick work. RAC_ 2nd Fl. Toilet
area fiber mesh fixing & lift area
door frame repairing.

29 29-Feb-24 99 8:00 AM 5:00 PM 8.00 1.0 1.0 8.00 8.00 T12-6th & 7th Fl. Toilet shaft brick
work.
Total Hour of Work: 552.00 530.00
Total no. of Labour (8hrs/day): 69.00 66.00