Professional Documents
Culture Documents
11th RA Minarul - R0
11th RA Minarul - R0
Daily Mason Supply 8.0 Hrs /Day. Nos 600.00 752.000 ₹ 451,200.00 69.00
3
Daily Labour Supply 8.0 Hrs /Day. Nos 450.00 685.125 ₹ 308,306.25 66.00
4
₹ - 16.760 ₹ 14,246.00
₹ - 57.420 ₹ 8,613.00
₹ - 75.300 ₹ 16,566.00
₹ - 47.000 ₹ 9,400.00
₹ - 27.400 ₹ 4,110.00
₹ - 3.475 ₹ 608.13
₹ - 30.000 ₹ 6,000.00
₹ - 122.650 ₹ 18,397.50
₹ - 1,185.359 ₹ 130,389.46
₹ - - ₹ -
₹ - 24.920 ₹ 21,182.00
₹ - 97.420 ₹ 14,613.00
₹ - 100.000 ₹ 22,000.00
₹ - 77.500 ₹ 15,500.00
₹ - 43.800 ₹ 6,570.00
₹ - 5.270 ₹ 922.25
₹ - 41.265 ₹ 8,253.00
₹ - 164.450 ₹ 24,667.50
₹ - 1,460.424 ₹ 160,646.61
₹ - 14.000 ₹ 3,500.00
₹ - 24.920 ₹ 21,182.00
₹ - 97.420 ₹ 14,613.00
₹ - 100.000 ₹ 22,000.00
₹ - 77.500 ₹ 15,500.00
₹ - 43.800 ₹ 6,570.00
₹ - 5.270 ₹ 922.25
₹ - 41.265 ₹ 8,253.00
₹ - 164.450 ₹ 24,667.50
₹ - 1,032.715 ₹ 113,598.62
₹ - - ₹ -
₹ - 32.000 ₹ 8,000.00
₹ - 1.100 ₹ 935.00
₹ - 7.090 ₹ 1,063.50
₹ - 66.885 ₹ 7,357.30
₹ - 34.000 ₹ 8,500.00
₹ - 1,204.980 ₹ 228,946.20
₹ - 117.585 ₹ 5,879.25
₹ - 117.585 ₹ 2,351.70
₹ - 21.500 ₹ 18,275.00
₹ - 1.290 ₹ 193.50
₹ - 41.680 ₹ 8,336.00
₹ - 25.000 ₹ 3,750.00
₹ - 721.200 ₹ 79,332.00
₹ - 45.500 ₹ 38,675.00
₹ - 65.900 ₹ 13,180.00
₹ - 25.000 ₹ 3,750.00
₹ - 41.110 ₹ 34,943.50
₹ - 40.730 ₹ 6,109.50
₹ - 62.600 ₹ 13,772.00
₹ - 17.400 ₹ 3,480.00
₹ - 16.000 ₹ 2,400.00
₹ - 14.630 ₹ 2,560.25
₹ - 7.760 ₹ 1,552.00
₹ - 153.200 ₹ 22,980.00
₹ - 679.237 ₹ 129,055.00
₹ - 112.186 ₹ 16,827.94
₹ - 13.800 ₹ 11,730.00
₹ - 43.100 ₹ 7,758.00
₹ - 47.000 ₹ 10,340.00
₹ - 185.000 ₹ 27,750.00
₹ - 410.302 ₹ 10,257.55
₹ - 79.866 ₹ 1,197.99
₹ - 21.600 ₹ 18,360.00
₹ - 6.960 ₹ 1,044.00
₹ - 0.430 ₹ 94.60
₹ - 2.650 ₹ 397.50
₹ - 20.250 ₹ 3,543.75
₹ - 2.550 ₹ 510.00
₹ - 21.950 ₹ 4,829.00
₹ - 65.850 ₹ 9,877.50
₹ - 74.400 ₹ 8,184.00
₹ - 10.330 ₹ 1,549.50
₹ - 6.000 ₹ 900.00
₹ - 8.130 ₹ 1,626.00
₹ - 7.130 ₹ 1,069.50
₹ - 186.000 ₹ 20,460.00
₹ - 25.880 ₹ 21,998.00
₹ - 22.900 ₹ 5,038.00
₹ - 90.000 ₹ 13,500.00
₹ - 316.250 ₹ 34,787.50
₹ - 174.990 ₹ 33,248.10
₹ - 5.510 ₹ 4,683.50
₹ - 4.200 ₹ 924.00
₹ - 16.450 ₹ 2,467.50
₹ - 162.420 ₹ 17,866.20
₹ - 6.990 ₹ 5,941.50
₹ - 12.810 ₹ 2,818.20
₹ - - ₹ -
₹ - 362.520 ₹ 39,877.20
₹ - 10.880 ₹ 1,904.00
₹ - 3.940 ₹ 3,349.00
₹ - 3.000 ₹ 660.00
₹ - 11.750 ₹ 1,762.50
₹ - 189.290 ₹ 20,821.90
₹ - 12.330 ₹ 10,480.50
₹ - 13.700 ₹ 2,055.00
₹ - 554.840 ₹ 61,032.40
₹ - 221.180 ₹ 24,329.80
₹ - 1,321.000 ₹ 85,865.00
₹ - - ₹ -
₹ - - ₹ -
₹ 108,413.90 ₹ 2,780,504.29
₹ -5,421.00 ₹ -139,025.52
₹ -1,084.00 ₹ -27,804.90
₹ - ₹ -
₹ - ₹ -
₹ - ₹ -
₹ - ₹ -
₹ 0.73 ₹ -
₹ 101,909.63 ₹ 2,613,673.87
Rupees & Eleven Paisa only.
RA-5 Date-06/09/2023
Sl
Description No. Length Breadth Height Unit Qty Remarks
No.
(mt.) (mt.) (mt.)
Outside Plaster of RAC Left Facia.
1 Beam With Balancing Tank 1 10.800 1.650 Sqmt 17.820
2 Side Wall 1 0.675 4.575 Sqmt 3.088
3 post 4 0.200 4.575 Sqmt 3.660
4 Planter 1 6.150 1.150 Sqmt 7.073
5 Planter 1 5.750 0.525 Sqmt 3.019
6 Planter 1 2.826 4.570 Sqmt 12.915
7 Wall 1 5.375 1.675 Sqmt 9.003
8 Stair with mumpty 1 10.400 11.275 Sqmt 117.260
9 Turning 1 0.600 11.275 Sqmt 6.765
Total Sqmt 180.600
Deduction for window
1 Stair Window 1 1.2 10.325 Sqmt 12.390
2 Window 1 2.5 2.875 Sqmt 7.188
3 Cut out 1 0.75 0.4 Sqmt 0.300
Total deduction Sqmt 19.900
Total Plaster 160.70
RAC Block Work (outside)
1 1 0.675 0.200 4.575 Cumt 0.618
2 1 4.650 0.400 9.750 Cumt 18.135
3 1 3.200 0.400 9.750 Cumt 12.480
4 2 0.500 0.200 9.750 Cumt 1.950
5 1 10.400 0.200 0.450 Cumt 0.936
Total Cumt 34.100
Deduction for Post,Band,Window
1 Window 1 1.200 0.400 10.325 Cumt 4.956
2 1 0.900 0.400 2.500 Cumt 0.900
3 Shaft 1 0.700 0.200 0.400 Cumt 0.056
4 Stair Beam 3 4.900 0.200 0.500 Cumt 1.470
5 Beside Stair Beam 3 5.200 0.400 0.900 Cumt 5.616
6 Above Roof 1 10.400 0.200 0.800 Cumt 1.664
7 1 2.650 0.200 1.100 Cumt 0.583
8 1 2.850 0.200 0.800 Cumt 0.456
9 Post 1 0.350 0.200 2.250 Cumt 0.158
2 0.400 0.200 8.550 Cumt 1.368
1 0.200 0.200 5.350 Cumt 0.214
2 0.200 0.200 10.050 Cumt 0.804
Total Amt.
T- 12
T-12 3rd Fl Corridor Plaster
1 Wall 2 28.58 2.85 Sqmt 162.91
2 1.5 2.85 Sqmt 8.55
Celling 1 Sqmt 48.49 Polyline Dwg
Sqmt 219.95
Deduction
1 Passage Window 1 5.6 0.95 Sqmt 5.32
2 Door 4 1.05 2.15 Sqmt 9.03
3 FCD 2 1.2 2.15 Sqmt 5.16
4 SAFT 1 1.85 2.3 Sqmt 4.26
1 0.75 2.25 Sqmt 1.69
1 6.25 2.85 Sqmt 17.81
1 3.6 2.3 Sqmt 8.28
Sqmt 51.54
Total Sqmt 168.40
Stair-1 For 1st To 3rd Floor Plaster
1 Side Wall 2 5 2.9 Sqmt 29.00
2 Side Wall 2 3 2.9 Sqmt 17.40
3 Celling 1 15 Sqmt 15.00 Polyline Dwg
Sqmt 61.40
Deduction 0.00
1 W5 1 1.2 1.2 Sqmt 1.44
2 FCD 1 1.2 2.15 Sqmt 2.58
3 HVAC Shaft 5 0.55 0.3 Sqmt 0.83
Sqmt 4.85
Total Sqmt 56.56
4H Flat Plaster
1 Wall 1 2.2 2.935 Sqmt 6.46
2 Wall 1 0.5 2.935 Sqmt 1.47
3 Celling 1 0.6 2.2 Sqmt 1.32
Total 9.24
1st Fl Planter Wall & Balcony Sill Plaster
1 Planter 2 0.7 1.3 Sqmt 1.82
Planter 2 0.25 1.3 Sqmt 0.65
Planter Middle Partition 4 0.7 0.25 Sqmt 0.7
Planter 1 0.25 1.3 Sqmt 0.325
Planter 1 0.25 1.3 Sqmt 0.325
Planter Middle Partition 2 0.25 0.25 Sqmt 0.125
Balcony Sill 2 1.2 0.2 Sqmt 0.48
Balcony Sill Top 2 1.2 0.2 Sqmt 0.48
Total 4.905
2nd Fl Planter Wall & Balcony Sill Plaster
1 Planter 3 0.7 1.3 Sqmt 2.73
Planter 3 0.25 1.3 Sqmt 0.975
Planter Middle Partition 6 0.7 0.25 Sqmt 1.05
Planter 2 0.25 1.3 Sqmt 0.65
Planter 2 0.25 1.3 Sqmt 0.65
Planter Middle Partition 4 0.25 0.25 Sqmt 0.25
Balcony Sill 3 1.2 0.2 Sqmt 0.72
Balcony Sill Top 3 1.2 0.2 Sqmt 0.72
7.745
3rd Fl Planter Wall & Balcony Sill Plaster
1 Planter 3 0.7 1.3 Sqmt 2.73
Planter 3 0.25 1.3 Sqmt 0.975
Planter Middle Partition 6 0.7 0.25 Sqmt 1.05
Planter 2 0.25 1.3 Sqmt 0.65
Planter 2 0.25 1.3 Sqmt 0.65
Planter Middle Partition 4 0.25 0.25 Sqmt 0.25
Balcony Sill 3 1.2 0.2 Sqmt 0.72
Balcony Sill Top 3 1.2 0.2 Sqmt 0.72
Total 7.745
1st Fl ,Flat - F , Utility Plaster
Wall 2 1.675 2.935 Sqmt 9.83
Wall 1 1.4 2.935 Sqmt 4.11
Celling 1 2.48 Sqmt 2.48 Polyline Dwg
16.42
Deduction For Door & Window
W3a 1 0.6 0.9 Sqmt 0.54
D18 1 0.75 2.15 Sqmt 1.61
2.15
14.27
2nd Fl ,Flat - F , Utility Plaster
Wall 2 1.675 2.935 Sqmt 9.83
Wall 1 1.4 2.935 Sqmt 4.11
Celling 1 2.48 Sqmt 2.48 Polyline Dwg
16.42
Deduction For Door & Window
W3a 1 0.6 0.9 Sqmt 0.54
D18 1 0.75 2.15 Sqmt 1.61
2.15
14.27
3rd Fl ,Flat - F , Utility Plaster
Wall 2 1.675 2.935 Sqmt 9.83
Wall 1 1.4 2.935 Sqmt 4.11
Celling 1 2.48 Sqmt 2.48 Polyline Dwg
16.42
Deduction For Door & Window
W3a 1 0.6 0.9 Sqmt 0.54
D18 1 0.75 2.15 Sqmt 1.61
2.15
14.27
T-12 Total Plaster 376.80
1st Fl Cutout B/W
Wall 1 1.8 0.2 2.45 Cumt 0.88
Deduction For Post, Band,Cut Out
Cut Out 1 0.55 0.2 0.3 Cumt 0.03
Band 2 1.8 0.2 0.08 Cumt 0.06
Band 1 0.55 0.2 0.08 Cumt 0.01
Post 2 0.2 0.2 0.3 Cumt 0.02
0.12
0.76
2nd Fl Cutout B/W
Wall 1 1.8 0.2 2.45 Cumt 0.88
Deduction For Post, Band,Cut Out
Cut Out 1 0.55 0.2 0.3 Cumt 0.03
Band 2 1.8 0.2 0.08 Cumt 0.06
Band 1 0.55 0.2 0.08 Cumt 0.01
Post 2 0.2 0.2 0.3 Cumt 0.02
0.12
Total 0.76
3rd Fl Cutout B/W
Wall 1 1.8 0.2 2.45 Cumt 0.88
Deduction For Post, Band,Cut Out
Cut Out 1 0.55 0.2 0.3 Cumt 0.03
Band 2 1.8 0.2 0.08 Cumt 0.06
Band 1 0.55 0.2 0.08 Cumt 0.01
Post 2 0.2 0.2 0.3 Cumt 0.02
0.12
Total 0.76
T-12 Total B/W 2.28
1st , 2nd , 3rd Fl Cutout B/W Post
Post 6 0.3 Rmt. 1.8
1st , 2nd , 3rd Fl Cutout B/W Band
Band 6 1.8 Rmt. 10.8
Band 3 0.55 Rmt. 1.65
Total 12.45
₹ 30,533.00
₹ 11,730.00
₹ 27,750.00
₹ 10,340.00
₹ 80,353.00
129.49
22.01
190.41
34.88
4.15
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M) UOM
(M)
RA-6
1.0 200 MM Thk. Block Work
1.1 Tower- RAC
2nd Floor Level Lift Lobby & Staircase
a. CC-37A to CC37B 1 3.000 0.200 2.700 Cum
b. CC-37B to CC38 1 2.000 0.200 2.550 Cum
c. CC-37B to CC50 1 5.000 0.200 3.100 Cum
d. CC-49 to CC50 1 3.000 0.200 2.700 Cum
e. Deductions for FCD1 -1 1.200 0.200 2.100 Cum
f. Deductions for Beam -1 5.000 0.200 0.500 Cum
a. Parking Side
SW-15 to SW-19 1 17.080 3.675 Sqm
SW-24 TO SW-28 1 17.080 3.675 Sqm
Grid D to E 4 3.200 3.675 Sqm
Deductions for opening -4 2.000 0.800 Sqm
Deductions for Ramp -1 5.000 0.600 Sqm
Deductions for D11A -1 1.050 2.100 Sqm
2nd & 3rd Floor Level
4 1.025 1.300 Sqm
b. 3BHK-G Flat Utility Parapet Wall
4 0.400 2.925 Sqm
4 1.025 1.300 Sqm
c. 3BHK-E Flat Utility Parapet Wall
4 0.400 2.925 Sqm
1st Floor Level
2 1.025 1.300 Sqm
d. 3BHK-E Flat Utility Parapet Wall
2 0.400 2.925 Sqm
Total Qty. of Inside Plaster of T12 Sqm
9.2 Tower- RAC
Ground Floor Level
Column Inside: CC-13 to CC-18 6 2.500 4.400 Sqm
Prefunction Area left & Right Side
2 1.400 3.000 Sqm
Shaft Inside
Total Qty. of Inside Plaster of RAC Sqm
Total Qty. of Inside Plaster
ET
Total
Quantity Remarks
Quantity
1.620
1.020
3.100
1.620
-0.500
-0.500
CC-37A to CC37B,
-0.240
CC-49 to CC50
-0.080 CC-37B to CC-38
-0.120
-0.130
-0.040
1.660
1.360
3.750
2.750
-0.500
-0.700
CC-37A to CC37B,
-0.240
CC-49 to CC50
-0.080 CC-37B to CC-38
-0.150
-0.130
-0.040
1.530
0.940
2.650
-0.500
CC-37A to CC37B,
-0.240
CC-49 to CC50
-0.080 CC-37B to CC-38
-0.500
1.740
-0.210
-0.200
-0.100
-0.150
-0.210
1.520
0.240
0.270
0.300
0.170
1.040
-0.040
21.600
2.670
2.340
-0.230
-0.410
2.670
2.340
-0.230
-0.410
-0.480
1.330
1.170
-0.110
-0.200
-0.120
10.330 10.330
6.000
6.000 6.000
2.650
2.650 2.650
Rmt 8.650
2.550
8.130
10.680
3.100
3.750
15.100
21.950
23.600
23.600
18.650
65.850 65.850
5.700
1.430
7.130 7.130
Rmt 72.980
62.770
62.770
47.040
-6.400
-3.000
-2.210
5.330
4.680
5.330
4.680
2.670
2.340
186.000 186.000
66.000
8.400
74.400 74.400
Sqm 260.400
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M) UOM
(M)
RA-7
1.0 200 MM Thk. Block Work
1.1 Tower- RAC
3rd Floor Level
a. LW1 to CC-45 1 31.175 0.200 2.500 Cum
b. CC-41 to CC-15 1 15.000 0.200 1.575 Cum
c. CC-43 to CC-17 1 15.000 0.200 1.575 Cum
d CC-45 to CC-19 1 15.000 0.200 2.575 Cum
e. Deductions for Band Beam -6 15.000 0.200 0.080 Cum
f. Deductions for Columns -7 1.300 0.200 2.500 Cum
g. Deductions for Mullian -8 0.200 0.200 1.575 Cum
h. Deductions for Mullian -4 0.200 0.200 2.575 Cum
Total Qty. of 200 MM thk. Block Work Cum
1.2 Tower- T12
Lift Lobby Left Side wall (4th to 10th
a. 7 1.800 0.200 2.450 Cum
Fl.)
b. Deductions for Mullian -14 0.300 0.200 0.200 Cum
c. Deductions for Band Beam -7 1.800 0.200 0.080 Cum
d. Deductions for Band Beam -7 0.550 0.200 0.080 Cum
e. Deductions for Opening -7 0.550 0.200 0.300 Cum
Total Qty. of 200 MM thk. Block Work Cum
Total Qty. of 200 MM Thk. Block
15.590
4.730
4.730
7.730
-1.440
-4.550
-0.500 Item - b & c
-0.410 Item - d
25.880 25.880
6.170
-0.170
-0.200
-0.060
-0.230
5.510 5.510
Cum 31.390
22.900
22.900
4.200
4.200
90.000
90.000 90.000
16.450
16.450 16.450
Rmt 106.450
30.870 4th Fl. To 10th Fl.
-1.160
31.370
73.500
31.370
-3.530
162.420 162.420
128.700
74.250
2.680
1.250
-10.080
-2.520
-3.060
-3.120
-3.180
1.320
1.500
1.520
1.540
8.000
7.920
0.300
7.980
7.980
0.370
0.300
8.000
8.000
0.750
0.300
15.600
42.930
9.240
5.040
12.310
1.610
2.040
0.600
0.000
-1.260
-2.160
-1.080
-1.440
-4.200
-3.680
316.250 316.250
Sqm 478.670
41.800
22.380
1.080
1.920
0.550
0.000
12.420
44.750
1.420
12.380
2.790
15.260
11.880
9.090
2.180
0.000
-4.770
-0.140
174.990 174.990
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M) UOM
(M)
RA-8
1.0 200 MM Thk. Block Work
1.1 Tower- T12
Lift Lobby Left Side wall (10th Fl. To 15th
a. 5 1.800 0.200 2.450 Cum
Fl.)
b. Deductions for Mullian -10 0.300 0.200 0.200 Cum
c. Deductions for Band Beam -5 1.800 0.200 0.080 Cum
d. Deductions for Band Beam -5 0.550 0.200 0.080 Cum
e. Deductions for Opening -5 0.550 0.200 0.300 Cum
Total Qty. of 200 MM thk. Block Work Cum
1.2 Tower- RAC
1 4.600 0.200 1.575 Cum
a. Male Changing Room Front Side Wall
1 0.950 0.200 1.975 Cum
1 3.575 0.200 1.975 Cum
b. Female Changing Room Front side wall 1 1.300 0.200 1.575 Cum
1 1.475 0.200 2.075 Cum
1 2.500 0.200 2.300 Cum
1 0.300 0.200 1.975 Cum
c. Female Changing Room Right side wall
1 2.300 0.200 3.475 Cum
1 0.300 0.200 2.825 Cum
d. Deductions for Column -1 0.400 0.200 2.075 Cum
Deductions for Stiffener Post at Female
e. -1 0.200 0.200 1.975 Cum
changing room front side wall
Deductions for Stiffener Post at Male
f. -1 0.200 0.200 1.575 Cum
changing room front side wall
Total Qty. of 200 MM thk. Block Work Cum
Total Qty. of 200 MM Thk. Block
Parking Area-
1 2.175 3.575 Sqm
12SW-30 & Adjacent Wall
1 7.160 3.675 Sqm
1 2.400 3.675 Sqm
12SW31 both face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
12SW-15 to 1st Ramp Landing 1 7.840 3.675 Sqm
1st Ramp Landing Portion 1 1.500 3.125 Sqm
Ramp Portion 1 2.000 3.025 Sqm
2nd Ramp Landing Portion 1 1.500 2.925 Sqm
2nd Ramp Landing Portion to SW-19 1 2.640 3.675 Sqm
1 2.400 3.675 Sqm
12SW-32 Both Face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
1 7.160 3.675 Sqm
12SW-33 & Adjacent wall
1 2.175 3.575 Sqm
1 2.175 3.575 Sqm
12SW-34 & Adjacent Wall
1 7.160 3.675 Sqm
1 2.400 3.675 Sqm
12SW35 both face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
12SW-24 to 12SW-28 1 15.480 3.675 Sqm
1 2.400 3.675 Sqm
12SW-36 Both Face 1 1.000 3.625 Sqm
1 6.600 3.675 Sqm
1 7.160 3.675 Sqm
12SW-37 & Adjacent wall
1 2.175 3.575 Sqm
4BX-30 Both Side (12SW-30 to 12SW-31) 2 5.340 0.475 Sqm
1 4.200 0.475 Sqm
4BX-30 Both Side (12SW-31 to 12SW-32)
1 4.200 0.425 Sqm
4BX-30 Both Side (12SW-32 to 12SW-33) 2 5.340 0.475 Sqm
4BX-31 Both Side (12SW-34 to 12SW-35) 2 5.340 0.475 Sqm
1 4.200 0.475 Sqm
4BX-31 Both Side (12SW-35 to 12SW-36)
1 4.200 0.425 Sqm
4BX-31 Both Side (12SW-36 to 12SW-37) 2 5.340 0.475 Sqm
4.410
-0.120
-0.140
-0.040
-0.170
3.940 3.940
1.450
0.380
1.410
0.410
0.610
1.150
0.120
1.600
0.170
-0.170
-0.080
-0.060
6.990 6.990
Cum 10.930
3.550
4.630
4.630
12.810
3.000
3.000
0.000
0.000 0.000
11.750
11.750 11.750
Rmt 11.750
7.780
26.310
8.820
3.630
24.260
28.810
4.690
6.050
4.390
9.700
8.820
3.630
24.260
26.310
7.780
7.780
26.310
8.820
3.630
24.260
56.890
8.820
3.630
24.260
26.310
7.780
5.070
2.000
1.790
5.070
5.070
2.000
1.790
5.070
2.940
2.730
4.620
4.410
5.700
3.990
8.550
3.990
6.530
1.600
6.530
6.530
1.600
6.530
-3.740
-1.130
482.970
293.680
189.290 189.290
3.850
10.630
-0.200
-3.400
10.880 10.880
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M)
(M)
RA-9
1.0 Inside plaster
1.1 Tower- RAC
2nd Fl. to 3rd Fl. Level
a. Gym Area-
Wall from CC15 to CC41 2 15.800 3.050
CC14 2 2.500 3.050
CC13 2 2.500 3.050
CC12 2 2.500 3.050
Wall from CC30 to Female Changing Room
1 12.650 3.050
Corner Column
Female Changing room Right Side Wall 1 5.700 3.050
M2 96.380
M2 15.250
M2 15.250
M2 15.250
M2 38.582
M2 17.385
M2 24.324
M2 15.035
M2 0.915
M2 5.557
M2 1.417
M2 2.440
M2 7.015
M2 7.613
M2 1.160
M2 6.320
M2 -3.225
M2 -3.675
M2 59.921
M2 17.955
M2 17.670
M2 12.825
M2 -3.225
M2 -17.722
M2 -2.580
M2 16.672
M2 14.030
M2 5.850
M2 4.387
M2 5.947
M2 4.085
M2 0.940
M2 -5.160
M2 -2.880
Sqm 391.710 391.710
M2 58.880
M2 15.985
M2 7.875
M2 7.875
M2 7.875
M2 3.623
M2 19.924
M2 8.978
M2 27.713
M2 2.670
M2 0.473
M2 1.260
Sqm 163.130 163.130
ide Plaster Sqm 554.840
Sqm 9.190
Sqm 4.510
Sqm 13.700 13.700
M3 5.700
M3 1.460
M3 2.010
M3 3.160
M2 20.663
M2 17.250
M2 7.250
M2 5.438
M2 7.312
M2 4.085
M2 0.855
M2 -5.160
M2 -2.880
Sqm 54.810 54.810
M2 9.180
M2 105.995
M2 55.080
M2 -0.600
M2 -0.473
M2 -2.813
Sqm 166.370 166.370
ide Plaster Sqm 221.180
M2 23.700
M2 86.500
M2 4.500
M2 237.650
M2 282.950
M2 9.900
M2 443.190
M2 232.800
Sqm 1321.000
MEASUREMENT SHEET
Width
SL. No. Description of Work No. Length (M) Height (M)
(M)
RA-11
1.0 Inside plaster
1.1 Tower- RAC
2nd Fl. to 3rd Fl. Level
a. Lift Lobby -
Male & Female changing room entry 1 5.150 3.050
Deductions for Opening-
Entrance Door -1 1.500 2.450
D9 -2 0.900 2.150
b. Lift Lobby -
Electric Shaft Inside Wall 1 3.300 3.150
ELV Shaft Inside Wall 1 1.800 3.150
ELV & Electric Shaft Back Side Wall -1 1.950 3.050
Driveway Entry from Lift Lobby 1 4.740 3.025
Deductions for Opening-
FCD1a -1 1.200 2.150
SA2 -1 1.200 1.800
SA6 -1 0.600 1.800
Total Qty. for Driveway
3rd Fl. to 4th Fl. Level
a.Swiming Pool Service Room -
1 35.750 2.900
Room Inside Area
1 16.550 3.475
C17 Column single face 1 0.400 1.575
C18 Column Both face 2 0.400 1.575
C19 Column Single face 1 0.400 1.575
RBY-14 Bottom 1 15.000 0.200
RBX-10 Top & Bottom 2 6.950 0.400
Deductions for Opening-
SA9 -1 1.500 1.875
FG18 -2 3.475 1.575
Add for Jambs-
FG18 2 6.625 0.200
Total Qty. for Lift Lobby
b. Lift Lobby -
Electric Shaft Inside Wall 1 3.300 3.600
ELV Shaft Inside Wall 1 1.800 3.600
ELV & Electric Shaft Back Side Wall -1 1.950 3.750
Driveway Entry from Lift Lobby 1 5.750 3.400
Deductions for Opening-
FCD1a -1 1.200 2.150
SA2 -1 1.200 1.800
SA6 -1 0.600 1.800
Total Qty. for Driveway
Total Qty. of Inside Plaster
M2 15.707
M2 -3.675
M2 -3.870
M2 10.395
M2 5.670
M2 -5.947
M2 14.339
M2 -2.580
M2 -2.160
M2 -1.080
Sqm 26.800 26.800
M2 103.675
M2 57.511
M2 0.630
M2 1.260
M2 0.630
M2 3.000
M2 5.560
M2 -2.813
M2 -10.946
M2 2.650
Sqm 161.160 161.160
M2 11.880
M2 6.480
M2 -7.312
M2 19.550
M2 -2.580
M2 -2.160
M2 -1.080
Sqm 24.780 24.780
ide Plaster Sqm 212.740
Cum 0.583
Cum 1.026
Cum 0.981
Cum 0.265
Cum 1.325
Cum 0.424
Cum -0.216
Cum -0.432
Cum -0.288
Cum -0.516
Cum -0.072
Cum -0.144
Cum -0.144
Cum -0.086
Cum -0.027
Cum -0.045
Cum -0.033
Cum -0.045
Cum -0.198
Cum -0.066
Cum -0.141
Cum 2.150 2.150
Cum 0.737
Cum 1.885
Cum 1.240
Cum 0.335
Cum 1.675
Cum 0.536
Cum -0.216
Cum -0.432
Cum -0.288
Cum -0.516
Cum -0.072
Cum -0.144
Cum -0.144
Cum -0.172
Cum -0.027
Cum -0.045
Cum -0.033
Cum -0.045
Cum -0.198
Cum -0.066
Cum -0.141
Cum 3.870 3.870
Thk. Block Work Cum 6.020
Rmt 3.300
Rmt 1.100
Rmt 2.350
Rmt 3.300
Rmt 1.100
Rmt 2.350
Rmt 13.500
Rmt 1.800
Rmt 3.600
Rmt 3.600
Rmt 2.150
Rmt 1.800
Rmt 3.600
Rmt 3.600
Rmt 4.300
Rmt 20.150
Rmt 0.900
Rmt 1.500
Rmt 1.100
Rmt 1.500
Rmt 0.900
Rmt 1.500
Rmt 1.100
Rmt 1.500
Rmt 10.000
MINARUL SK
Details of JMR for Skilled & Unskilled Labour Usshar , Batanagar
Mason & Labour Work
JMR No.
SL. No.
1 1-Feb-24 73 8:00 AM 5:00 PM 8.00 3.0 2.0 24.00 16.00 T-12_20th Fl. Sleve finishing &
plaster work.
2 2-Feb-24 74 8:00 AM 5:00 PM 8.00 3.0 2.0 24.00 16.00 T-12_20th Fl. Sleve finishing and
window beat finishing work.
3 3-Feb-24 75 8:00 AM 5:00 PM 8.00 2.0 2.0 16.00 16.00 T-12_20th Fl. Ceiling plastering
and 21st Fl. Window beat making.
6 6-Feb-24 78 8:00 AM 7:00 PM 10.00 2.0 1.0 20.00 10.00 T12: 12th & 4th Fl. Rectification
work.
T-12: 13th, 14th Fl. Sleve Fixing
7 7-Feb-24 79 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 work & 21st Fl. Balcony finishing
work.
8 8-Feb-24 80 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 T-12: 20th Fl. Balcony plaster
finishing work.
T-12_21st Fl. Window beat Fixing
9 9-Feb-24 81 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 work & 22nd Fl. Hole finishing
work.
10 10-Feb-24 82 8:00 AM 5:00 PM 8.00 2.0 1.0 16.00 8.00 T-12: 19th Fl. & 22nd Fl. Plaster
repairing work.
T12- 5th Fl. Toilet shaft block work
11 11-Feb-24 83 6:00 AM 2:00 PM 8.00 2.0 2.0 16.00 16.00 service pressarization shaft block
fixing, PVC neck fixing & plastering
work.
17 17-Feb-24 89 7:00 AM 6:00 PM 10.00 1.0 2.0 10.00 20.00 T12- 10th Fl. To 12th Fl. Block
plaster work.
18 18-Feb-24 90 6:00 AM 2:00 PM 8.00 2.0 2.0 16.00 16.00 T12- 11th Fl. Block Plaster work.
19 19-Feb-24 91 7:00 AM 6:00 PM 10.00 1.0 1.0 10.00 10.00 T12- 12th Fl. Block Plaster work.
20 20-Feb-24 92 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 T12-22nd Fl. Window beat
finishing & repair work.
21 21-Feb-24 93 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 T12-21st Fl. Window beat
finishing & plaster work.
22 22-Feb-24 94 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 T12-22nd Fl. Sleve finishing and
balcony Fixing work.
T12: 23rd Fl. Window beat
23 23-Feb-24 95 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 finishing work & 22nd Fl.
Rectification work.
T12-23rd Fl. Window beat
24 24-Feb-24 96 7:00 AM 6:00 PM 10.00 2.0 2.0 20.00 20.00 finishing work & RAC_ Fiber mesh
2nd and 3rd Fl. Lift side area fiber
mesh fixing.
29 29-Feb-24 99 8:00 AM 5:00 PM 8.00 1.0 1.0 8.00 8.00 T12-6th & 7th Fl. Toilet shaft brick
work.
Total Hour of Work: 552.00 530.00
Total no. of Labour (8hrs/day): 69.00 66.00