You are on page 1of 40

BOQ OF EXTENSION WORK FOR FACTORY SHED-GUJARAT INFRA PIPE PVT LTD

AREA 4136.39325 SQM


PLINTH HEIGHT 0.9 RMT

SR.NO. DESCRIPTION OF ITEMS QTY. RATE UNIT AMOUNT

A UPTO PLINTH LEVEL


1 SURFACE DRESSING / SITE CLEANING
Labour charges for grubbing and clearing Road / land including clearing top soil,
including all plants, vegetations, dirts etc. complete,etc with dumping all the nonuseful
stuff materials into the plot boundary , as per instruction of site engg. for the location 4136.39 smt 0.00
[Max depth @ 150 mm assumed ]

2 EXCAVATION WORK
Earth work in excavation below existing ground level in foundations, trenches, in all class
of soil / murrrum except rock up to a depth of 1.50 mtrs. Including shoring, strutting,
dewatering, and disposing off the un useful soil outside the plot boundary complete as
directed by Engineer IN charge.
a ( upto 1.50 )
Do--- as above in depth 0 mtrs. To 1.50 mtrs. 1284.86 cmt. 0.00
b ( upto 3.00 )
Do--- as above in depth 1.50 mtrs. To 3.00 mtrs. 905.15 cmt. 0.00
c Do--- as above in depth 3.0 mtrs. To 4.50 mtrs. R/O cmt.

3 BACK FILLING WORK


Filling in foundation & in Plinth with selected(Non Expansive) earth spread in layers of
150 to 230 mm thickness to achieve required level and slope / gradient and compacted to
95% of proctor density and leveling finally as per the instruction of Engineer-In-Charge
inclusive cost of soil, transportation and all taxes and royalties .
a Available soil 1662.16 cmt 0.00
b Earth brought from outer side for Plinth filling
Murrum filling 1630.32 cmt 0.00

4 Metalling [ 63-90 mm ]
Providing and laying metal (size 63mm x 90mm) in a layer of 175mm each well
compacted with power roller without damaging foundation filling voids with quarry dust,
watering, ramming, compacting if required for edges and corners use plate compactor 827.28 cmt 0.00
etc. complete as directed by Engineer In charge.

5 PLAIN CEMENT CONCRETE [M10-1:3:6]


Providing and laying cement concrete in foundation and plinth M:10 [Site mix] and curing
complete including cost of formwork as directed by Engineer In charge.
Total Qty. for Metal concrete(PCC) 381.04 cmt 0.00

6 RCC work [ in M25 Grade ]


Providing and laying controlled reinforced Cement Concrete of M25 grade with
20mm down size graded crushed stone aggregate including scaffolding, opening, recesses,
chamfering, finishing top surfaces vibrating, machine mixing tamping, curing (excluding
centering and shuttering) etc. complete as per the specifications, drawings and instruction of
Engineer - in- charge (excluding cost of reinforcement) for all elements of concrete

a Total Qty. for RCC footings 364.74 cmt. 0.00


b Total qty. for RCC columns (Pedestal ) 156.25 cmt. 0.00
c Total Qty. for RCC groundbeams 59.64 cmt. 0.00
d Total Qty. for copping beams 6.32 cmt. 0.00

7 BRICK MASONARY WORK


Providing and constructing Conventional Brick masonry in CM 1:6 (1 Cement and 6
Coarse sand) upto plinth with conventional size bricks having minimum crushing
strength of 35 Kg / Sq. Cm. including scaffolding, racking out joints, curing, watering etc.,
complete as directed by Engineer IN charge.
a Total qty. of brick work upto P.L. (230 mm thick) (1:6) proportion 10.72 cmt. 0.00

PAGE NO:1
8 REINFORCEMENT STEEL FE 500
Providing & Supplying & fixing in position High yield deformed bar Reinforcement
confirming to IS – 1139 or cold Twisted bars, TOR steel / TMT / or Equivalent
Reinforcement bars confirming to IS – 1786 for RCC construction including transporting
(i.e. loading & unloading) the steel from store/issue points to site of works including
unloading from Trucks/Trailers, cleaning, de coiling, cutting, bending to required shape
and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding
wire, placing with proper cover block, support chairs, overlap, spacers, etc. complete in all
respect as directed by Engineer IN charge in foundation and up to Plinth level.

a 8MM DIA 0.51 MT 0.00


b 10MM DIA 0.36 MT 0.00
c 12MM DIA 0.83 MT 0.00
d 16MM DIA 0.00 MT 0.00
e 20MM DIA 0.00 MT 0.00
f 25MM DIA 0.00 MT 0.00

9 SHUTTERING
Providing and erecting in position form work with plate shuttering materials of
approved quality for all type of concrete elements vertical, horizontal or inclined including
scaffolding, stagging, fasteners,locking ,Ties at respective levels necessary nails, wires,
locking pins,Guggus etc keeping in position till concrete is laid and members have 1342.63 sqm 0.00
acquired required strength, removal thereafter, applying shuttering oil etc. complete as
directed by Engineer-in-Charge.

10 RCC Tremix Flooring [M:25] --only concrete pourng work


Providing and laying conventional cement concrete M-25, 200 mm thick in alternate
panels for flooring. Panels shall be formed by MS channel 100 mm depth on all four sides
and bolted adequately to make the panel size as required. Entire concrete mass shall be
vibrated with screed vibrators and levelled etc ,including the cost of form work but 827.28 cmt 0.00
excluding cost of reinforcement, and curing by pounding the surface of concrete,
complete as directed by Engineer IN charge..

11 Outside Double coat Sand faced Plaster OR Mala Plaster


Providing and applying 20 mm th. double coat sandfaced or mala cement plaster on any
surface, consisting of 12 mm thick backing coat in CM 1:3 with water proofing compound
(1:Cement and 3:Coarse sand) & 8 mm thick finishing coat in CM 1:1 with water proofing
compound (Q 200ml /bag as dosage)(1:Cement and 1:Coarse sand) to walls, beams,
column, drain, bends, moulds, making grooves, pattas and all brick and RCC surfaces
164.74 smt. 0.00
including raking joints, scaffolding, curing finishing.The plaster surface shall have rough
finish by using sponge on all types of surfaces in line level and including all scaffolding
and curing & level at all level above plinth and upto ground floor level complete as
directed by Engineer IN charge

12 TRIMIX WORK-Final finisihing work


Extra for using "Tremix system " (vacuum dewatering system and smooth finishing and
after that smooth finish with power trowel) in flooring.etc complete incl.all cost and as per 4136.39 smt 0.00
instruction of Engg Incharge .

13 Groove cutting
Providing and constructing groove cutting of size 5mm x 50mm deep for floor , including
saw cutting of concrete floors / pavement to the required depth, filling the same with 2068.20 rmt 0.00
polysulpide, etc. complete.as per instruction of Engg in charge.

14 Foundation Bolt Fixing


Labour charges for Positioning Foundation Bolts in the pedastals maintaining all the line
& level , confirming from the responsible Engineer etc as per detailed drawing, to keep
the bolts in position as required ,etc. complete as directed by Engineer In Charge. 722.00 nos 0.00

15 GP2 Grouting
Filling the gap between RCC column, base plate and floor with GP2 Grout of M45 I S I
grout to consume shall confirm to company Equavalient of SIKA make / Fair mate / Dr.
fixit etc. as per I S Specification including the all the over head expesnes and the edges 3.24 cmt 0.00
shall be shampered etc completed as directed by Engineer Incharge.

16 Re-bar
Providing, drilling & fixing anchor bars in concrete using Hilti HY-150 chemical grout as
per as per manufacturer's specifications. [ necessary pull out test --if recommended by
consulltant have to be proved , which rate shall not be extra paid etc complete as
directed by engg. incharge .

PAGE NO:2
a 8mm dia #NAME? NOS #NAME?
b 16mm dia 110.00 NOS 0.00

TOTAL AMOUNT FOR CIVIL WORK #NAME?

PAGE NO:3
LINTEL BEAM
Sr.
Particular
no. L B H

1 LB1 (SIZE IN METER) 6.175 0.230 0.230



Number of beams 16.000

Extra top bars

→ STIRRUPS

→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS
2 LB2 (SIZE IN METER) 7.112 0.230 0.150

Number of beams 12.000

Extra top bars

→ STIRRUPS

→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS
BAR BENDING SCHEDULE - LINTEL

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.250 6.125 0.250 12 2 16

0.250 6.125 0.250 12 3 16

0.250 3.062
0 2 16

0.180
0.075 8 42 16
0.180 0.075 0.180

0.180

0.150 0.530 10 15 16
0.100
0.530
8 4 16
2.113

0.250 7.062 0.250 12 2 12

0.250 7.062 0.250 12 2 12

0.250 3.531
0 2 12

0.180
0.075 8 48 12
0.100 0.075 0.100

0.180

0.150 0.530 10 15 12
0.100
0.530
8 4 12
2.113
NG SCHEDULE - LINTEL

Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

6.625 212.000 - -

6.625 318.000 - -

3.312 106.000 - -

0.150 0.870 584.640 230.933 -

0.150 1.310 314.400 - 193.985

2.113 135.232 53.417 -


7.562 181.488 - -

7.562 181.488 - -

3.781 90.744 - -

0.150 0.710 408.960 161.539 -

0.150 1.310 235.800 - 145.489

2.113 101.424 40.062 -

TOTAL 485.951 339.473


GRAND TOTAL 162
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)

188.680 - - -

283.020 - - -

- - - -

- - - -

- - - -

- - - -
161.524 - - -

161.524 - - -

- - - -

- - - -

- - - -

- - - -

794.749 0.000 0.000 0.000


1620.173
LINTEL BEAM
Sr.
Particular
no. L B H

1 SB1 (SIZE IN METER) 212.584 0.230 0.100



Number of beams 0.000

Extra top bars

→ STIRRUPS

→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS
2 SB2 (SIZE IN METER) 6.360 0.230 0.150

Number of beams 0.000

Extra top bars

→ STIRRUPS

→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS

3 SB3 (SIZE IN METER) 22.350 0.230 0.230



Number of beams 0.000
Extra top bars

→ STIRRUPS

→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS

3 SB4 (SIZE IN METER) 31.000 0.230 0.230



Number of beams 0.000

Extra top bars


→ STIRRUPS

→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS

4 IB3 (SIZE IN METER) 0.000 0.230 0.300



Number of beams 0.000

Extra top bars

→ STIRRUPS
→ CHAJJA

CHIPPIYA

DISTRIBUTION BARS
BAR BENDING SCHEDULE - LINTEL

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.250 212.534 0.250 10 2 0

0.250 212.534 0.250 0 2 0

0.250 106.267
0 2 0

0.180
0.075 8 1418 0
0.050 0.075 0.050

0.180

0.150 0.530 0 1418 0


0.100
0.530
0 2 0
22.350

0.250 6.310 0.250 10 2 0

0.250 6.310 0.250 0 2 0

0.250 3.155
0 2 0

0.180
0.075 8 43 0
0.100 0.075 0.100

0.180

0.150 0.530 10 61 0
0.100
0.530
8 4 0
8.900

0.250 22.300 0.250 12 2 0


0.250 22.300 0.250 12 2 0

0.250 11.150
0 2 0

0.180
0.075 8 150 0
0.180 0.075 0.180

0.180

0.150 0.530 10 150 0


0.100
0.530
8 4 0
22.350

0.250 30.950 0.250 12 2 0

0.250 30.950 0.250 12 2 0

0.250 15.475
0 2 0

0.180
0.075 8 208 0
0.180 0.075 0.180

0.180

0.150 0.530 10 208 0


0.100
0.530
8 4 0
31.000

0.250 -0.050 0.250 16 5 0

0.250 -0.050 0.250 16 3 0

0.250 -0.025
12 0 0

0.180
0.075 8 1 0
0.250 0.075 0.250

0.180

0.150 0.450 0 1 0
0.100
0.450
0 2 0
0.000
NG SCHEDULE - LINTEL

Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

213.034 0.000 - -

213.034 0.000 - -

106.517 0.000 - -

0.150 0.610 0.000 - -

0.150 1.310 0.000 - -

22.350 0.000 - -
6.810 0.000 - -

6.810 0.000 - -

3.405 0.000 - -

0.150 0.710 0.000 - -

0.150 1.310 0.000 - -

8.900 0.000 - -

22.800 0.000 - -
22.800 0.000 - -

11.400 0.000 - -

0.150 0.870 0.000 - -

0.150 1.310 0.000 - -

22.350 0.000 - -

31.450 0.000 - -

31.450 0.000 - -
15.725 0.000 - -

0.150 0.870 0.000 - -

0.150 1.310 0.000 - -

31.000 0.000 - -

0.450 0.000 - -

0.450 0.000 - -

0.225 0.000 - -

0.150 1.010 0.000 - -


0.150 1.150 0.000 - -

0.000 0.000 - -

TOTAL 0.000 0.000


GRAND TOTAL 0.
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -
- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -
- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -
- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -
- - - -

- - - -

0.000 0.000 0.000 0.000


0.000
SLAB BEAM
Sr.
Particular
no. L B H

1 B1 (SIZE IN METER) 0.000 0.230 0.575



Number of beams 0.000

Extra top bars

→ STIRRUPS
BAR BENDING SCHEDULE - SLAB BEAM

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.250 -0.050 0.250 16 6 0

0.250 -0.050 0.250 16 4 0

0.250 -0.025
0 2 0

0.180
0.075 10 1 0
0.525 0.075 0.525

0.180
G SCHEDULE - SLAB BEAM

Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

0.450 0.000 - -

0.450 0.000 - -

0.225 0.000 - -

0.150 1.560 0.000 - -

TOTAL 0.000 0.000


GRAND TOTAL 0.
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)

- - - -

- - - -

- - - -

- - - -

0.000 0.000 0.000 0.000


0.000
SLAB
Sr.
Particular
no. T

1 S1 Thickness 0.115
→ Number of Slab 0.000
Straight bars Length 8.200 m

Bentup bars Length 0.000 m

Extra top bars 0.000 m

Distribuition 1 5.500 m

Distribuition 2 0.000 m
BAR BENDING SCHEDULE - SLAB

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.075 8.200 0.075 12 38 0

0.032 0.000 0.032 0 38 0

0.000 0 38 0

5.500 10 28 0

0.000 12 5 0
ING SCHEDULE - SLAB

Weig
Total wt
Number of Length in Total length
8mm Total wt 10mm
bend mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

8.350 0.000 - -

2 0.063 0.000 - -

0.000 0.000 - -

5.500 0.000 - -

0.000 0.000 - -

TOTAL 0.000 0.000


GRAND TOTAL 0.
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)

- - - -

- - - -

- - - -

- - - -

- - - -

0.000 0.000 0.000 0.000


0.000
REINFORCEMENT STEEL CONSUMPTION STATEMENT
REINFORCEMENT STEEL Total Qty
Sr. No. Item Description
8mm 10mm 12mm 16mm 20mm 25mm
1 FF LINTEL 485.951 339.473 794.749 ----- ----- ----- 1620.173

Total in kg :- 485.951 339.473 794.749 ----- ----- ----- 1,620.173


WASTAGE 5% 24.298 16.974 39.737 ----- ----- ----- 81.009

Total in MT :- 0.510 0.356 0.834 ----- ----- ----- 1.701