S. No. Description of Items Unit


Quantity Rate Amount (Rs.)
1 EARTHWORK
1.1 EXCAVATION
a Earth work in excavation upto all depths as per drawing in all
kinds of soil in foundations trenches, plinth beam,rafts, column
,pits, and pile caps, basements, STP, Under ground Water tank
etc. by Mechanical/manual means and dumping of earth within
the site premises as per the instruction of Engineer in charge.
The rate quoted are for final excavation, dressing sides of
already excavated pit in taper to make the angle of repose,
ramming of bottom, disposing earth to the designated areas CUM 894.00 130.00 116,220.00
identified by the local authorities, providing & laying of shoring &
planking if required, including all lead & lift and including final
manual dressing (The existing level shall be taken jointly by the
Engineer in charge for the measurement). The excavation shall
be paid from the said recorded levels only. Only PCC area shall
be measured for the payment. Nothing shall be paid on account
of any working space etc.

1.3 BACK FILLING


a Backfilling with available at site premises and periphery stacked
earth in layers of 200mm and compacted to achive the desired
density and making in levels as per drawing at the site including CUM 290.00 60.00 17,400.00
all the excavation, lifting, transportation and laying etc.

2 PLAIN CEMENT CONCRETE 0.00


2.1 Providing and laying machine mixed Plain Cement Concrete in
any thickness below pile cap in volumetric proportions of 1:4:8
(1 Cement : 4 Coarse sand : 8 coarse aggregates 20mm
CUM 20.50 3,850.00 78,925.00
nominal size) for leveling course including necessary side
shuttering, ramming, consolidating, leveling and curing etc.
complete. Cement will be provided free of cost.
ALTERNATIVE OF ITEM (2.1) 0.00
REINFORCED CEMENT CONCRETE 0.00
ALTERNATIVE OF ITEM (2.3 a & 2.3 b) 0.00
2.5 .b Receiving and laying cast-in-situ of M-25 in any thickness and
any size of pile cap, plinth beams columns, slab including
compaction , leveling and curing including breaking concrete of
CUM 150.00 1,050.00 157,500.00
columns and merging exposed steel into pile caps etc.
complete. (Cover 50 mm) RMC with cement will be provided
free of cost.

Page 1 of 2
S. No. Description of Items Unit
Quantity Rate Amount (Rs.)
3 SHUTTERING 0.00
3.1 Centering and shuttering (as per IS:4990) by providing & using
approved shuttering for pile cap ,plinth beam,column of
boundary wall for concrete work (plain and rein-forced) in
locations called for including making , strutting, propping,
bracing with steel props, bolting, wedging, casing, striking,
Sqm 913.00 400.00 365,200.00
removal etc. complete Allow for forming grooves, drips throats,
chamfers, cut-outs, openings, recesses etc. where called for
and for coating with approved mineral shuttering oil ( REEBOL
of FOSROC / equivalent ) to prevent adhesion etc. all complte.

4 REINFORCEMENT STEEL 0.00


4.1 Receiving, Storing, Stacking and placing of MS/ HYSD bar
Reinforcement for R.C.C in situ including straightening, cutting,
bending, placing in position, binding, providing and tying with 20
G annealed wire all complete as per drawings, specifications
and as directed by the Engineer-in-Charge.(Rate shall include
cost of binding wire, cover blocks, etc. BUT Reinforcement Steel
will be supplied free of cost by owner at one place only at g MT 11.50 8,500.00 97,750.00
Floor) The rate to include for making of proper base for tor steel
stacking (with brick layer) , unloading with crane if required and
shifting of stacks of tor steel to facilitate the site progress works.
The rate also to include as directed stacking of Tor steel scrap,
Steel stack binders and regular collection of steel scrap from
site to scrap stacking designated area on site.

6 Brick Work 0.00


Providing & Constructing 230mm thick/thickness as per
drawings brick works from First class bricks with metalic sound
as approved by Engineer in charge of size 230mm x 115mm x
75mm( tolerance in size as per the IS Codes) brick masonry in
cement mortar 1:6 (1 cement : 6 coarse sand) , scaffolding
6.1 Cum 228.00 5,500.00 1,254,000.00
complete including curing as per the instruction/duration
specified by the Project Manager. Above Plinth Level as per the
good for construction drawing at all height and level in all shape
and size including steps for staircase.

7.0 FINISHING WORK 0.00


7.1 PLASTER 12mm (Internal)
Providing and laying 12mm thick cement plaster 1:5 (1 cement :
5 fine sand 50% Sand 50% Coarse Sand plus Stuco bond fiber
tissue (Quantity as per manufacturer specification) on brick /
RCC surfaces including providing 24 gauge 18mm size
galvanized chicken wire mesh of approved width fixed at Sqm 1681.00 220.00 369,820.00
junctions of concrete and brick work as well over chases of
electrical conduits (with necessary laps and 'u' shape galvanized
wire/nails) or on other similar location (over chase of conduits)
or as instructed for all leads & lift complete to the entire
satisfaction of Project manager.
8 STEEL WORK 0.00
Providing, fabricating & fixing of steel work welded in hollow
sections at all levels, flat, , MS pipe, MS sheet MS rod etc.
including cutting, hoisting, fixing in position including the
supplying and fixing of required fasteners of approved brand and
0.00
also providing & and applying a priming coat of approved steel
primer (zinc chromate/red oxide) etc. as required all complete as
per specification and drawing or as directed by Engineer in
charge
8.1 In railings, hand rail, grills, gates and similar works. MT 13.30 85,000.00 1,130,095.40
TOTAL 3,586,910.40