01 April 2024
DOCUMENT STAGE STATUS
SUBMISSION APPROVAL
DISCIPLINE QTY Not Yet Return From Submitted /
IFI IFR IFA AFC APPROVED PROGRESS PROGRESS
Submitted ELN/Revise Review
MKAPR (POMPA) 116 83 1 25 6 1 7 0 26 28,45% 0,00%
Control System (PCV) 25 9 0 4 8 4 2 0 14 64,00% 0,00%
Triguna Mandala (PLC) 49 32 0 15 2 0 12 0 5 34,69% 0,00%
Siemens (Switchgear) 33 11 0 22 0 0 7 0 15 66,67% 0,00%
TOTAL 223 135 1 66 16 5 0 16,15% 0,00%
LATEST STATUS
No. DOCUMENT NUMBER DOCUMENT TITLE
Review
Date Rev Status Days Position
Status
Review
Date Rev Status Days Position
Status
Review
Date Rev Status Days Position
Status
Review
Date Rev Status Days Position
Status
SIEMENS (SWITCHGEAR) |
PROJECT MANAGEMENT |
GENEREAL DOCUMENT |
PMRK-SIE-EPC1-55-GEN-LST-001 Spare Parts for Commissioning 23-Mar-24 A IFR 9 KEP
PMRK-SIE-EPC1-55-GEN-LST-002 Spare Parts for 2 Years Operation 23-Mar-24 A IFR 9 KEP
PMRK-SIE-EPC1-55-GEN-LST-003 Special Tools List 1-Apr-24 A IFR 0 KEP
PMRK-SIE-EPC1-55-GEN-LST-005 Sub Vendor List 1-Apr-24 A IFR 0 KEP
PMRK-SIE-EPC1-55-GEN-LST-006 Packing List 1-Apr-24 A IFR 0 KEP
PMRK-SIE-EPC1-55-GEN-ONM-001 Catalogue 15-Mar-24 A IFR 17 KEP
PMRK-SIE-EPC1-55-GEN-ONM-002 Installation Operation 15-Mar-24 A IFR 17 KEP
PMRK-SIE-EPC1-55-GEN-ONM-003 Catalogue of Main Component 15-Mar-24 A IFR 17 KEP
QUALITY CONTROL |
PROCEDURE |
PMRK-SIE-EPC1-55-PROC-PAIN-001 Painting Procedure 15-Mar-24 A IFR 17 KEP
PMRK-SIE-EPC1-55-PROC-PACK-001 Packing and Preservation 15-Mar-24 A IFR 17 KEP
PMRK-SIE-EPC1-55-PROC-ITP-001 ITP 15-Mar-24 A IFR 17 KEP
PMRK-SIE-EPC1-55-PROC-FAT-001 FAT Procedure 23-Mar-24 A IFR 9 KEP
PMRK-SIE-EPC1-55-PROC-SAT-001 SAT Procedure 23-Mar-24 A IFR 9 KEP
REPORT |
ENGINEERING |
PMRK-SIE-EPC1-55-ENG-DWG-001 Basic Drawing (GA - SLD) 15-Mar-24 A IFR 17 KEP
PMRK-SIE-EPC1-55-ENG-CAL-002 CT / PT Calculation 1-Apr-24 A IFR 0 KEP