1. Ensure proper PTW before starting any work. 1. Electrical shock and human injury due to 1. All checks to be done positively.
a) Make sure that electrical connection isolate. moving parts. 2. Ensure that module isolated from switchgear
b) Ensure that EPB pressed. and lockbox key is issued with the permit.
2 Opening of the HP dosing pump components 1. Injury to the hands of the worker. 1. Choose right size of spanner/tools
2. Falling of Spanner /tools 2. Proper Illumination.
3 Replacement of damaged components / 1. Spillage of oil onto the floor 1. Choose right size of spanner/tools
Replacement of lube oil 2. Use Proper size tools 2. Proper Illumination.
Keep a tray to accumulate spilled oil.
4 Checking of coupling & spider condition. 1. Injury to the hands of the worker 1. Use of Safety helmet & shoes & gloves.
Replace if any damaged part is found.
5 Assembling the dismantled components. 1. Slipping of spanner & tools and causing 1. Choose right size of spanner/tools
injury to the worker. 2.
6 Return PTW 1. Human injury and machine damage due 1. Ensure Area is cleaned and removed all tools
to left out items. from site.
2. Spilled lube oil to be cleaned thoroughly.
Any other Precaution to be taken:
Additional Hazard (if any) :
Required Training : • Required PPE : Safety Helmet, Safety Shoes, Nose Mask, Safety goggles, Safety gloves