Gerencia de Ingeniería de Intervenciones a Pozos de Explotación

Diseño a la medida (High Energy)


Vs TNP y TNPI

Noviembre - 2019
GIIPET – Well design reality
GIIPET – Well design – Drilling, Completion and P&A Loads – Rig selection
GIIPET – Well design

Lean Well Design based on High Energy concept

Time days
GIIPET – Well design

Lean Well Design based on High Energy concept

Time

Depth
GIIPET – Well design

Lean Well Design based on High Energy concept

Time

Invisible Lost Time (ILT) related to


routine rig drilling operations is the

Difference from standard


difference between actual operational

Formation problems
duration and a best practice target. It is
invisible because it does not appear on any
High Energy conventional morning reports.

Rig failure….
Concept

Waiting for…

Regulations
The measurement of Invisible Lost Time
Depth
starts by analyzing each individual key

Weather
performance indicator (KPI) that can be
produced by a particular crew (drilling
crew, casing crew, etc.), by a machine-
automated operation, or a combination of
both.

A diagram of the process times


•FFP (HE) time- The necessary time needed
for constructing a well (BHA
handling, tripping, running casing, BOP
work, drilling connections, etc.)

•NPT– The deviation from plan (problem


time) due to unexpected/unplanned events
like hole problems, tool failures, rig repair
etc
GIIPET – Well design

Lean Well Design based on High Energy concept

• Team Work
• Planning
• Quality Services
• Real Time Follow up OP
• Knowledge
• Experience
• High Quality Engineering
• Logistics
• Protocols
• Leader Ship
• Budget
• Fast solving problems
• Quick taking actions
GIIPET – Well design

Thank You