You are on page 1of 4

PROJECT CONTACT INFORMATION

Last Name: First Name:


Phone #: Email Address:
Company Name:

PROJECT LOCATION & JURISDICTION


Project Address:
City: State: Zip Code:
Electric Utility Company:
Permitting Jurisdiction (AHJ):
Type of Stamp Needed? (Select All That Apply): _____ Structural / Civil _____ Electrical

PV EQUIPMENT
Solar Modules Inverter Type 1 Inverter Type 2
Quantity: Quantity:
Manufacturer: Manufacturer:
Model #: Model #:
Inverter Location:

PV MOUNTING METHOD
Type: Roof Mount ( _____ kW)
___ Tar & Gravel ___ TPO ___ Modify Bitumen ___ Metal ___ EPDM Rubber Membrane ___Roll Out Comp Shingle
Roof Material:
___ Other (Please Describe):
Racking Method: ___ Ballast (Flat Roof) ___ Tilt-Up (Flat Roof) ___ Flush-Mount (Pitched Roof)
Racking Mfr: Racking Model:
Anchor / Flashing Mfr: Anchor / Flashing Model:
PV Array Tilt: PV Array Azimuth:
Type: Carport / Canopy ( _____ kW)
Configuration: ______ Rows x _____ Columns
Cantilever: _____ Single _____ Double Purlins: _____"C" _____"Z" / _____ Single _____ Shared
Manufacturer: PV Module Orientation: _____ Portrait ______ Landscape
Structural Drawing Available?: _____ YES _____ NO ______ I DON'T KNOW
Racking Mfr: Racking Model:
PV Array Tilt: PV Array Azimuth:
Type: Ground Mount ( _____ kW)
Configuration: ______ Rows x _____ Columns Protection Fence Required?: _____ YES _____ NO
Manufacturer: PV Module Orientation: _____ Portrait ______ Landscape
Foundation Type: ___ Concrete Piers ___ Ground Screws (Provide Spec) ___ Other: ____________________________
Racking Mfr: Racking Model:
Grade / Slope: PV Array Azimuth / Tilt:
Soil Type: _____ Clay _____ Sand ______ Rock ______ Mulch / Vegetation

PV BALANCE OF SYSTEM
Grounding Method: _____ Lay-In Lug _____ WEEB _____ Integrated
PV Production Meter: _____ YES _____ NO
PV Production Meter Manufacturer: Model:
Additional Comments:
ELECTRICAL SERVICE EQUIPMENT
Main Service Panel PV Interconnection Location (If Different From Main Service Panel)
Manufacturer:
Bus Bar Rating:
Main Breaker Rating:
L - L Volts:
L - N Volts:
Grounding Method: _____ Rod _____ Ufer _____Other PV Interconnection Method: ______ Breaker ______Splice ______ I DON'T KNOW
Distance from PV Array (ft.):

PV SITE PLANS / PHOTOS


PROVIDE THE FOLLOWING PHOTOS
FROM ROOF/SITE
__ Roof Material __ Parapet Wall(s) __ Roof Vent(s)
__ HVAC __ Skylight(s) __ Panorama
UNDER ROOF
__ Purlins __ Rafters or Beams __ Structural Connections
ELECTRICAL / MAIN SERVICE AND SUB PANELS
__ Main & Sub Panel w/ & W/o Cover __ Main & Sub Panel Disconnects __ Branch Breakers and Labels
__ Close-up of Main & Sub Panel Labels __ Generator & Critical Load Panel __ Meter
__ PV Interconnection Point __ Electric Room & Name Plate Ratings __ System Ground
__ Electric Room Wall / Floor Space

ROOF FRAMING SKETCH


PROVIDE AS-BUILT ROOF FRAMING PLANS, OTHERWISE, PLEASE SKTECH BELOW
Please Include:
__ Rafter Size & Spacing __ Rafter Material __ Support Size & Spacing

Roof Framing Sketch


ROOF LAYOUT SKETCH
PRINT GOOGLE EARTH / AERIAL AND DESIGNATE THE FOLLOWING
Please Include:
__ PV Module & Inverter Location __ Dimension of Roof Perimeter __ PV Interconnection Location
__ Electrical Room Location __ Main Service Panel Location __ Roof Obstructions Locations

Roof Layout Sketch


AS-BUILT SINGLE LINE DIAGRAM
PROVIDE AS-BUILT SINGLE LINE DIAGRAM PLANS, OTHERWISE, PLEASE SKETCH BELOW
Please Include:
__ Bus Bar & Breakers Rating for applicable equipment __ Existing Sources (Generators, Inverters) __ Disconnects
__ L - L / L - N Voltage __ Transformers

Single Line Diagram Plans

AS-BUILT EQUIPMENT ELEVATION DIAGRAM


PROVIDE AS-BUILT EQUIPMENT ELEVATION, OTHERWISE, PLEASE SKETCH BELOW
Please Include:
__ Location of AC Disconnect ( If Applicable) __ Location of Equipment
__ Critical Dimension For Mounting Location

Elevation View