Samsung
Course Name: SCFT Procedure
Course Objective Who should attend
This module will enable participants RF / DT engineers, Riggers
to understand how to conduct SCFT
Lunch break
• Introduction to SCFT • Hands on exercises
• SCFT Requirements
Day 1
•Preparations for SCFT
•Physical Site Check
•Drive Test
Good to know
Keep your mobile phone in the silent mode during the session
Need to sign attendance sheet at the start and end of each day
Your valuable feedback will be taken at the end to enhance training experience
Introduction to SCFT
What is SCFT
Overview of SCFT Process
SCFT Workflow
Roles & Responsibilities
SCFT Requirements
Lead time
Tools
Drive Test
Types of tests
Tools required
Measurements & parameters
Health & Safety Requirements
Safety Equipment
Sr. No. Required Tools Photo Use of tools
It’s keeping your hands safe, And it’s used for gri
3 Hand Gloves
p and dexterity.
Verification of
Availability and performance of
desired services
Physical configuration of the eNodeB
for each sector
Correct installation and configuration
((( ((( of the eNodeB
SOLPAR No
Adjust Antenna
Pass
Scope Parameter
Yes
Dive Test
No Change system or
Pass
physical parameter
Yes
Analysis
Extend support to circle SCFT Team for their minor & critical issues.
Prepare the RF Database and data backup of all drive related tests
and provide to Samsung
Roles & Responsibilities – SOLPAR RF Engineer
Fill the checklist as per TSSR data
Extend support to field team for their minor & critical issues
Rigger will make corrections on site and inform Drive Test Engineer
Drive Test Engineer will configure the Smart S4 mini as per defined
test scenarios
Drive Test Engineer will save the log file. In case of handoff fail, bad
RSRP, call drop etc., inform respective teams immediately
Summary
Strictly follow all the health & safety guidelines
SCFT team consists of an RF engineer, DT engineer, Rigger and Car driver with
well-defined roles and responsibilities for all
Quiz
You find that the antenna azimuth is incorrect. You will _________
• Correct it, log and report the error and then proceed with drive test
• Proceed with the drive test and report it later
• Cancel the drive test
Maintain performance check records with history as per the attached sheet
Appendex-Smart DM
performance management.xls
Preparations for SCFT
Preparations for SCFT
eNB Parameter
TSSR Review Verification Drive Route Checklist
from LSM-R
Technical Site Survey Report (TSSR)
• Site Name, and Site Address
• Site location in terms of LAT/LON
• Obstruction detail if any
Site information
• DT Engineer will take clutter pictures starting from North- Zero Degree at every 30
Degrees
Panoramic • Helps understand the clutter with respect to antenna azimuth
pictures
TSSR (Continued)
• For each sector, take pictures of the antenna mounting
eNB Parameter
TSSR Review Verification Drive Route Checklist
from LSM-R
Process to Check eNB Parameters
SOLPAR RF manger instructs engineer t
o collect eNB parameters from LSM-R e
ngineer
VSWR values
• Tx Power is transmitted power from eNB station, measured Watts or dBm. Typical
value is 10W or 40dBm
Tx Power
eNB Parameters to Check (Cont’d)
• Connectivity
• Type of backhaul connectivity like fiber or microwave
• Backhaul ATP completed
Back Haul
eNB Parameter Checklist
ATP1A Data Check List
Site ID Site Name
Address
GPS Lat Lon
Sr.No. eNB Parameter Name Alpha Beta Gamma
1 NEID 2 2 2
2 PCID 1 2 3
3 Cell ID 10001 10002 10003
4 eNB CGI 768 769 770
5 TAC H0002 H0002 H0002
6 EARFCN 38800 38800 38800
Antenna Tilt: Electrical from LSM-
7 2 4 2
R
8 VSWR 0.5 0.5 0.5
eNB Tx Power from LSM-R (in dBm
9 37 37 37
)
MIMO Mode (TM3/TM4) from LS
10 TM3 TM3 TM3
M-R
11 MIMO Type (2x2, 4x2) from LSM-R 4x4 4x4 4x4
Preparations for SCFT
eNB Parameter
TSSR Review Verification Drive Route Checklist
from LSM-R
Drive Route Basics
All sectors to be covered during the test
Major Minor
Road Road
eNB Parameter
TSSR Review Verification Drive Route Checklist
from LSM-R
TSSR Review Checklist
TSSR Review Check List
Site
Site ID Nam
e
Address
5 Building Height 30 30 30
ACE ACE
ANT ANT
XXD XXD ACE ANT
6 Antenna Make &Model no Verification
W-17- W-17- XXDW-17-65i-VT
65i-V 65i-V
T T
Yes/N Yes/N
7 RF layout verification Yes/No
o o
Antenna location checkAntenna obstruc Yes/N Yes/N
8 Yes/No
tion check on azimuth & Tilt o o
Yes/N Yes/N
9 Panoramic pictures verification Yes/No
o o
Obstruction Yes/N Yes/N
10 Yes/No
(if yes, picture require) o o
eNB LSM-R Parameter Checklist
eNB Initial Parameter Check List
Address
1 NEID 2 2 2
2 PCID 1 2 3
H000
5 TAC H0002 H0002
2
Address
1 Antenna Azimuth
Antenna Azimuth
2
(Free available range)
3 Tower Height
4 Building Height
Antenna M-Tilt
5
(Physical measurement)
Antenna M-Tilt
6
(Free available range)
Antenna E-Tilt
7
(Electrical from LSM-R)
8 Sector Swap Check
FTP server
Connectivity
No
OK
Yes
Contact RJIL/RAN
Core team for the Proceed to the site
resolution
SOLPAR RF engineer to has confirm
Check FTP server FTP server connectivity upon reaching
Yes to the site
Resolved connectivity on site
Yes
No
OK
Yes
Start testing
Backhaul Connectivity Check
Backhaul
Connectivity
No
OK
Yes
Contact concern
RJIL for the Proceed to the site
resolution
SOLPAR RF engineer to has confirm
Check for Backhaul the backhaul stability with LSM-R
Yes
stability with LSM-R engineer upon reaching to the site
Resolved
After reaching site
Yes
No
OK
Yes
Start testing
Summary
Perform regular testing of drive-test UE’s
Preparations for SCFT consist of TSSR review, eNB parameter verification from
LSM-R, availability of drive route and checklists. Before proceeding to the site
make sure you have these
TSSR gives details about eNB physical parameters such as antenna height,
azimuth, tilt, pictures of obstruction, site drawings and map views
• TSSR
• LSM-R
• Either
• 4
•6
• 8
Physical Checks at Site
Measuring Site Co-ordinates
Check the battery of GPS (72 channel GPS)
Point GPS towards clear, open skies for accuracy
GPS Setting time >5 min & GPS number of satellites > 4
Low Battery voltages and rare Geomagnetic storms may result in erroneous
GPS readings
GPS should not be used for Ground Elevation readings as the inaccuracy can
be well over 30m
Stand in the center of the site location (GBM, RTT,RTP)
Once the satellites are acquired, note co-ordinates for N & W in degree - de
cimal format.
Update this information into check list for pre-post comparison and for data
base tracking
Checking Antenna Azimuth
Stand in front of the Antenna
When taking compass readings, keep at least 8m distance from any magnetic, metal, or current carrying structures
such as towers, vehicles, or cables for correct readings
Open compass and wait a moment till the compass needle is stationary
Check the antenna azimuth with reference to North & measure the value in degrees
Mention the values in the check list for pre-post comparison and for database tracking
Check Azimuth – marking on map
Check the service direction of the antenna
Mark the main serving direction of the antenna on the map
Tower Height Measurement – Laser Meter
• FTP Download
Stationary Test • FTP Upload
• Ping Test
(for each sector)
• VoLTE call
All three sectors of the eNB under the test should be active and without any
artificial loading (e.g. OCNS) in all tests
In case of call drop, handover failure, etc. stop the call and find out the
probable cause before proceeding further
Possible problems that may arise during drive test: UE disconnection, GPS
problems, FTP server issues
SCFT Drive Test Tools Required
2 Samsung S4 mini phones with XCAL application
2 mobile phone holders
Battery charger
Extra batteries
USB hub
Inverter
Vehicle
Field Issues
If the drive test fails, check the system parameters & check the
alarms from LSM-R
Check the FTP server: Capture detailed information like ping, call
test and call the server engineer
Repeat the field test if alarms clear from LSM-R and DM kit is
working fine
Ping Test
Start an FTP download with a file of size 50MB with a single FTP thread
Verify that the file has been downloaded successfully, record the throughput
and stop the logging
UL Throughput
Ensure that the UE is successfully attached to the LTE network
Start an FTP upload with file of size 25MB with a single FTP thread
Verify that the file has been uploaded successfully, record the
throughput and stop the logging
Cell Coverage & Handover Verification
Ensure that the UE is successfully attached to the LTE network
Do the drive test around the site, clock-wise and anti-clock-wise to check both way Intra-
handover
If no proper route is available for checking Intra-handover, do a walk test around the site
Drive test for each sector is mandatory to check the coverage of cells and Inter handover
with neighbor cells
If there is any issue related to access (e.g. construction, road closed) please provide proper
justification with snapshot (Date and time should be mentioned on Photo)
Sector Swap Verification
After Physical site parameter verificati
on, conduct drive test in clock wise an
d anti-clock wise direction to identify
any sector swap
If found, take corrective action before
going for coverage drive test
If service-direction of PCID has
changed, Data Throughput
degradation and Handover Fail can be
observed
SCFT Parameter Requirements
Legend
Summary
eNB physical check involves checking azimuth (note free range), tilt, antenna
height, tower height
Drive around the site clockwise & anti-clockwise for moving tests
• 4 Mbps
• 20 Mbps
• 40 Mbps
• PCI
• RSRP
• VSWR
• FTP
• VoLTE
• Either
XCAL on S4 Mini
Steps for DM Tool (XCAL)
Power on
Ensure mobile is not in flight mode. If it is, switch flight mode off
Ensure XCAL GPS is in sync with mobile GPS and locked (steady, not blinking)
Go to Settings Unpair
Step 3 – Bluetooth Pairing of S4 minis
Make all the phones Visible to
each other over Bluetooth