Widening to four lane with pave shoulder from Design Km 49.200 to Km 89.

285 of NH-731B on EPC Mode in the State of Uttar Pradesh.


Client : Executive Engineer, N.H. Div. P.W.D. Varanasi
Authority Engineer : Marc Technocrats Pvt Ltd in Association with Shreya Infra Consultants Pvt Ltd
EPC Contractor : - S.K.S. Infra Project Pvt. Ltd.
RFI Summary
S. Date of Chainage Date of Time of RFI Raised
RFI No. Department Work Description Layer Remarks
No Submissi From To Length Side Inspection Inspection by
Highway Works

Structure Works
Excavation & Layout Checking of RCC
1 25-03-24 SKS/NH731B/STR/1502 Structure 82+220 82+260 40.00 LHS 26-03-24 10:00 AM Sovan Sardar
Drain
Excavation & Layout Checking of RCC
2 25-03-24 SKS/NH731B/STR/1503 Structure 82+220 82+260 40.00 LHS 26-03-24 10:30 AM Sovan Sardar
Drain

3 25-03-24 SKS/NH731B/STR/1504 Structure 78+368 78+381 13.00 LHS Checking of Reinforcement for Drain Raft 26-03-24 11:00 AM Sovan Sardar

Checking of Suttering & Pouring


4 25-03-24 SKS/NH731B/STR/1505 Structure 78+368 78+381 13.00 LHS 26-03-24 11:30 AM Sovan Sardar
Concrete RCC-M-25 for Drain Raft

5 25-03-24 SKS/NH731B/STR/1506 Structure 78+254 78+284 30.00 LHS Checking of Reinforcement for Drain Raft 26-03-24 12:00 PM Sovan Sardar

Checking of Suttering & Pouring


6 25-03-24 SKS/NH731B/STR/1507 Structure 78+254 78+284 30.00 LHS 26-03-24 12:30 PM Sovan Sardar
Concrete RCC-M-25 for Drain Raft