You are on page 1of 1

Safety Audit and Inspection open Recommendations status as on 18.04.

2023
Inspection
Date & Hazard Locatio Exact Inspection Responsible Responsible Recommendatio Verification
S.I Reference Hazard Description Recommendations Target Date
Time Observed n Location By Department Person n Status Status
Number
28.Mar.2 Rail mariswamy.kur
VJW-STL-2023- 023 Unsafe loading Sushil Nowal Panel Boards Open Condition Please provided the ubara - 15.Apr.2023 Verification
1 3-INSP-35121 12:30 Act CPL2 Bay -1026841 Logistics and Barricaded not provided. Barricaded ASAP. 1025753 00:00 Open Not Required

Point at Cement Yard


while entering from
PB Lubrication of Point and South Yard/Sutanpur
29.Mar.2 P.Way at Narayanasw Crossing and Keeping track at LC needs lubrication.
VJW-STL-2023- 023 Unsafe Cement ami - free from obstruction and to Difficulty experienced venka.reddy - 31.Mar.2023 Verification
2 3-INSP-35187 11:30 Act SY Yard 1048296 Logistics avoid waterlogging on track in operating the point. 1027027 00:00 Open Not Required

PB Lubrication of Point and


29.Mar.2 P.Way at Narayanasw Crossing and Keeping track at LC Waterlogging on Level
VJW-STL-2023- 023 Unsafe Cement ami - free from obstruction and to Crossing surface at venka.reddy - 15.May.2023 Verification
3 3-INSP-35187 11:30 Act SY Yard 1048296 Logistics avoid waterlogging on track Cement Yard LC. 1027027 00:00 Open Not Required
Drivers are sitting along the
truck movement path way at
the entrance of CTL Shed 1. Due
25.Mar.2 CTL , Shed Rakesh to continuous vehicle They should be khalandarbasha
VJW-STL-2023- 023 Unsafe Number - Behera - movement shall come under provided with a safe .mujavar - 28.Apr.2023 Verified & Not
4 3-INSP-35081 16:25 Condition Others 01 1092044 Logistics truck. sitting place. 1030477 00:00 Open Satisfied

You might also like