Professional Documents
Culture Documents
Reply To : HV/CNS/SOR/HSE/002
Location : Tower 3
Site Observation
It has been observed wire rope of the gondola fixing without lashing at Tower 03
Prepared By (CNS)
Name Designation Signature Date
Confirmed By (CNS)
Name Designation Signature Date
Approved By (CNS)
Name Designation Signature Date
Received By (HV)
Name Designation Signature Date
Consultant's Comment
* Notice of No Objection
* Notice of No Objection Subject to Comments (Refer Comments Below)
* Notice of Rejection - Resubmission Required (Refer Comments Below)
All wire ropes of gondola fixed with the lashing