HANDING OVER INSPECTION REQUEST

Project No: P304 Project Name : MARSA AL ARAB QUAY VILLAS


Lead
KILLA ARCHITECTURAL DESIGN Client : MARSA AL ARAB DEVELOPMENT LLC
Consultant :
HOIR number 304-QVIL-HOIR-ASGC-ARC-000076 - REV.0 Inspection Date 1-Mar-23

Location : Villa # 09

Reference Drawing :
Description of area to be inspected
Handing Over Inspection for Elevation-03 at Villa 09, Type - B as per attached highlighted Drawing

Name & Signature


Name & Signature
ASGC QAQC
ASGC PE /SE
Representative
Bishoy Wahba Beshoy Boutros
Engineer's Comments
KLD - (Status - Open)
1. Refer and attend to Aconex Field for the HOI comments in "Open" status. Printed copies
alsoattached herewith.
2. To submit WIR for the following incomplete works as per ITP for review and approval.
-Final coat of paint wall and ceiling.
3. Missing all WIR completion approved by KLD in the attachment, to be provided and
attached.
Contractor to ensure that all activity has WIR completion approval from KLD prior to snagging
comments.
4. For MEP works, refer and attend to WME comments for the HOI
5. Above HOI was done subject to take action/closing related to NCR's, SOR's issued for this
room/unit.
6. Contractor to note that below HOI checklist requirements are not complied for this
room/unit. Any damages and defects arising in lieu of this shall be on Contractor full
responsibility and shall rectify and make good without any delay.
- testing and commissioning completed
- permanent power available for socket and light switch testing
7. Subject to approval of lighting installation-by-lighting specialists.

Status of Inspection :

Closed Open

Engineer's Representative Receipt Acknowledge by ASGC

Nachiket Garge
29/03/23

Name, Date & Signature Name, Date & Signature


Inspector / Representative Resident Engineer Stamp & Signature

Distribution: (As Required) QS Project Control Others


Marsa Al Arab
Thu, Mar 30, 2023

...Quay Villa > Villa-09 >


Elevation > Elevation-03
SCAN TO LOAD THIS LOCATION

Summary (24)

Open 24 Ready to inspect 0 Work Done 0 In dispute 0 Closed 0

ID Location Issue Description Assigned to Due Status

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
40 > Villa-09 > Elevation > Silicon joint not aligned.
Elevation-03

PHOTOS (1/1)

Captured by: Nachiket Garge (Killa Architectural


Design)
Date: Tue, Mar 28, 2023, 12:54:21 pm
Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
39 > Villa-09 > Elevation > Poor application of silicon. Should be
Elevation-03 consistent, uniform and smooth.

PHOTOS (2/2)

Page 1 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:53:56 pm Date: Tue, Mar 28, 2023, 12:53:56 pm
Status when added: Open Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
38 > Villa-09 > Elevation > Poor termination of paint finish against
Elevation-03 adjacent facade. To be rectified.

PHOTOS (2/2)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:52:57 pm Date: Tue, Mar 28, 2023, 12:52:57 pm
Status when added: Open Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
37 > Villa-09 > Elevation > Unacceptable piece of cladding. Should
Elevation-03 be 1 single piece as marked.

PHOTOS (1/1)

Page 2 of 16
Captured by: Nachiket Garge (Killa Architectural
Design)
Date: Tue, Mar 28, 2023, 12:51:03 pm
Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
36 > Villa-09 > Elevation > Poor terminiation of paint finish against
Elevation-03 glass facade. to be rectified.

PHOTOS (3/3)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:49:25 pm Date: Tue, Mar 28, 2023, 12:49:25 pm
Status when added: Open Status when added: Open

Page 3 of 16
Captured by: Nachiket Garge (Killa Architectural
Design)
Date: Tue, Mar 28, 2023, 12:49:25 pm
Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
35 > Villa-09 > Elevation > Light fitting on pergilas to be replaced,
Elevation-03 as they are rusted.

PHOTOS (1/1)

Captured by: Nachiket Garge (Killa Architectural


Design)
Date: Tue, Mar 28, 2023, 12:41:18 pm
Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
34 > Villa-09 > Elevation > incorrect silicon application in hairline
Elevation-03 joints.

PHOTOS (2/2)

Page 4 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:39:09 pm Date: Tue, Mar 28, 2023, 12:39:09 pm
Status when added: Open Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
32 > Villa-09 > Elevation > Poor and unacceptable paint finish in
Elevation-03 between pergola and aluminium
cladding. Visible cover plate with
different color shade on pergola to be
recitifed to make same color as
pergola.

PHOTOS (3/3)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:33:14 pm Date: Tue, Mar 28, 2023, 12:33:14 pm
Status when added: Open Status when added: Open

Page 5 of 16
Captured by: Nachiket Garge (Killa Architectural
Design)
Date: Tue, Mar 28, 2023, 12:33:14 pm
Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
26 > Villa-09 > Elevation > Visible stain patches on the cladding to
Elevation-03 be removed and made homogenous.
Final coat of paint to be applied.

PHOTOS (3/3)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:30:24 pm Date: Tue, Mar 28, 2023, 12:30:24 pm
Status when added: Open Status when added: Open

Page 6 of 16
Captured by: Nachiket Garge (Killa Architectural
Design)
Date: Tue, Mar 28, 2023, 12:30:22 pm
Status when added: Open

543 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
25 > Villa-09 > Elevation > Visible gaps in cladding panel joints
Elevation-03 and not in straight line. Joints should be
hairline joints. Joints terminated
abruptly.

PHOTOS (4/5)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:31:03 pm Date: Tue, Mar 28, 2023, 12:31:02 pm
Status when added: Open Status when added: Open

Page 7 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:29:24 pm Date: Tue, Mar 28, 2023, 12:29:24 pm
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
86 > Villa-09 > Elevation > Visible gaps in stick curtain wall.
Elevation-03

PHOTOS (2/2)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:08:05 pm Date: Tue, Mar 28, 2023, 12:08:05 pm
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
84 > Villa-09 > Elevation > Poor silicon application. to be rectified
Elevation-03 to be uniform, consistent and smooth.

PHOTOS (2/2)

Page 8 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:07:19 pm Date: Tue, Mar 28, 2023, 12:07:19 pm
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
83 > Villa-09 > Elevation > Damaged cladding panels to be
Elevation-03 rectified / replaced.

PHOTOS (4/4)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:06:35 pm Date: Tue, Mar 28, 2023, 12:06:35 pm
Status when added: Open Status when added: Open

Page 9 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:06:35 pm Date: Tue, Mar 28, 2023, 12:06:35 pm
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
81 > Villa-09 > Elevation > Lights installed at an angle- to be
Elevation-03 rectified to be staight and aligned with
panel.

PHOTOS (2/2)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:05:36 pm Date: Tue, Mar 28, 2023, 12:05:36 pm
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
79 > Villa-09 > Elevation > Silicon application to be imporved to be
Elevation-03 smooth and consistent

PHOTOS (1/1)

Captured by: Nachiket Garge (Killa Architectural


Design)
Date: Tue, Mar 28, 2023, 12:04:23 pm

Page 10 of 16
Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
78 > Villa-09 > Elevation > Inconsistent siliocn joint width
Elevation-03 application. To be rectified as approved
shop drawing

PHOTOS (2/2)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:03:49 pm Date: Tue, Mar 28, 2023, 12:03:49 pm
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
72 > Villa-09 > Elevation > Glass balustrade capping installation to
Elevation-03 be improved to have equal spacing on
both sides between glass and cap.
Silicon application to be improved to be
consistent.

PHOTOS (3/3)

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 12:03:00 pm Date: Tue, Mar 28, 2023, 11:42:08 am
Status when added: Open Status when added: Open

Page 11 of 16
Captured by: Nachiket Garge (Killa Architectural
Design)
Date: Tue, Mar 28, 2023, 11:42:07 am
Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
71 > Villa-09 > Elevation > Poor finishing around channel edge.
Elevation-03 Poor termination of grating. Install the
grating on vertical face, recessed
inside, to close the opening.

PHOTOS (1/1)

Captured by: Nachiket Garge (Killa Architectural


Design)
Date: Tue, Mar 28, 2023, 11:40:52 am
Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
70 > Villa-09 > Elevation > Mosaic tiles along the edge are
Elevation-03 chipped. To be replaced.

PHOTOS (2/2)

Page 12 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 11:39:00 am Date: Tue, Mar 28, 2023, 11:39:00 am
Status when added: Open Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
69 > Villa-09 > Elevation > Tile cladding to continue below the pool
Elevation-03 to cover the exposed RC wall.

PHOTOS (1/1)

Captured by: Nachiket Garge (Killa Architectural


Design)
Date: Tue, Mar 28, 2023, 11:38:18 am
Status when added: Open

541 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
21 > Villa-09 > Elevation > Wall to be finished with plaaster + paint
Elevation-03 and gap between crrest wall and villa
wall to be closed.

PHOTOS (1/1)

Page 13 of 16
Captured by: Nachiket Garge (Killa Architectural
Design)
Date: Tue, Mar 28, 2023, 10:25:15 am
Status when added: Open

539 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
56 > Villa-09 > Elevation > Crooked joint line to be rectified and
Elevation-03 made straight.

PHOTOS (1/1)

Captured by: Nachiket Garge (Killa Architectural


Design)
Date: Tue, Mar 28, 2023, 9:48:49 am
Status when added: Open

539 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
54 > Villa-09 > Elevation > Retaining wall waterprrofing termination
Elevation-03 to be finished neatly without leaving any
gaps. Gap between retaining wall and
armor wall to be cleaned and finished
with proper wall finish. No exposed
blokwall should be visible.

PHOTOS (4/4)

Page 14 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 9:48:03 am Date: Tue, Mar 28, 2023, 9:48:03 am
Status when added: Open Status when added: Open

Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 9:48:02 am Date: Tue, Mar 28, 2023, 9:48:02 am
Status when added: Open Status when added: Open

539 MARSA AL ARAB > Quay Villa Defect: ASGC Construction LLC Open
50 > Villa-09 > Elevation > Unfinished wall waterproofing
Elevation-03 application - Patches observed on the
entire lenght of the wall.

PHOTOS (2/2)

Page 15 of 16
Captured by: Nachiket Garge (Killa Architectural Captured by: Nachiket Garge (Killa Architectural
Design) Design)
Date: Tue, Mar 28, 2023, 9:45:33 am Date: Tue, Mar 28, 2023, 9:45:33 am
Status when added: Open Status when added: Open

Page 16 of 16
DDA ELECTRONIC STAMP

5 4 3 2 1 KEY PLAN

3165 5 2765 5 3943

Roof
20.335 m

75 500
GENERAL NOTES
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
OTHERWISE.
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
398 1385 1385 1385 1385 1367 1416 2473 2583 1539 APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF

1200

1200
ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
APPROVED SHOP DRAWINGS.
2583 2583 3279
100

9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR


Third Floor TO UNDERTAKING ANY WORKS.

425 50
16.760 m 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2019 (BIM).
11. TRUE NORTH IS BASED ON VILLA PLOT 3 FOR TYPE C & PLOT 2 FOR TYPE B.
430

COORDINATION TRACKER
0 7/12/2021 12:48:35 PM
REV VER DESCRIPTION DATE & TIME OF PRINT

FORMAL ISSUE
3055

549 556 1716 576 405 8221 1271 1296 1296 1286 1309 472 269

1175
3172 2749 3834 550
Second Floor
13.260 m
6530

600
A 14-Feb-2021 CLIENT REVISED 100% DETAILED DESIGN SM-RK-BP
0 08-Jul-2021 CLIENT ISSUED FOR CONSTRUCTION SM-RK-BP
REV DATE ISSUED TO DESCRIPTION DRW-CHK-APP

ISSUED FOR CONSTRUCTION


PLOT #: PLOT OWNER:
3660492 Marsa Al Arab LLC
CLIENT:
1200

5000 5000 5526 5000


Marsa Al Arab
First Floor
Residence LLC
9.760 m TEL: (+971) 4 3665000
475
530

FAX: (+971) 4 3665001


P.O. Box 73137 Dubai
180

WEB: www.jumeirah.com

PROJECT MANAGEMENT:

North 25
TEL: (+971) 4 3788000
FAX: (+971) 4 3788000
P.O. Box 112288 Dubai
WEB: www.north25.ae
Mezzanine Level
7.060 m
DESIGN & BUILD CONTRACTOR:

ASGC GROUP

TEL: (+971) 4 4258000


FAX: (+971) 4 4258060
P.O. Box 13164 Dubai
WEB: www.asgcgroup.com

LEAD CONSULTANT:

KILLA ARCHITECTURAL
Ground Floor
4.160 m
DESIGN
OFFICE 3103, BURJ AL SALAM TOWER,
SHEIKH ZAYED ROAD, PO BOX 26642, DUBAI, UAE
TEL: +971 4 3554447
Road Level
3.500 m
design EMAIL: info@killadesign.com
WEB: www.killadesign.com

ARCHITECT:

KILLA ARCHITECTURAL
DESIGN
OFFICE 3103, BURJ AL SALAM TOWER,
SHEIKH ZAYED ROAD, PO BOX 26642, DUBAI, UAE
TEL: +971 4 3554447
design EMAIL: info@killadesign.com
WEB: www.killadesign.com
MSL
1.100 m PROJECT:

MARSA AL ARAB QUAY WALL VILLAS


SHEET NAME :
Type B - Panelisation - Elevation NW
(Sea side)
DDA SHEET NUMBER : NUMBER SEQUENCE:

A-21003.-B 21003.
SCALE @ A1: DRAWN: CHECKED: APPROVED:

Elevation - Northwest (Sea side) 1 : 50 SM RK BP


PROJECT No: DESIGNED BY: DATE OF ISSUE:
1 1537 KLD 08-JUL-2021
1 : 50
DRAWING No: REV:
1537-B-KLD-ARC-DWG-21003.-EL 0
© Copyright KILLA ARCHITECTURAL DESIGN
DDA ELECTRONIC STAMP

KEY PLAN

Code A.570
Finish Glass Fibre reinforced plastic White
RAL 90003
Thickness As per specification
Fixing Dry Fixing with steel hollow section

Roof Roof
20.335 m 20.335 m 1 2 3

500
A

1708
GENERAL NOTES
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
2. ALL DIMENSIONS TO BE VERIFIED ON SITE.

1950
3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED

100
OTHERWISE.
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.

642
6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
920 25 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
1200

1175

1175
ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
APPROVED SHOP DRAWINGS.
9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
Third Floor Third Floor Third Floor TO UNDERTAKING ANY WORKS.
16.760 m 16.760 m 16.760 m 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2019 (BIM).
375

475

477
11. TRUE NORTH IS BASED ON VILLA PLOT 3 FOR TYPE C & PLOT 2 FOR TYPE B.

COORDINATION TRACKER
0 7/12/2021 12:49:27 PM
REV VER DESCRIPTION DATE & TIME OF PRINT

1445
1950

1848
FORMAL ISSUE

50 1300 81

305100
25 917 130 1270 25 450
55
1175

1175

1175
50

Second Floor Second Floor Second Floor


13.260 m 13.260 m 13.260 m
375

500

500
50

250
1527 6 1552 1350 275 1454 A 14-Feb-2021 CLIENT REVISED 100% DETAILED DESIGN SM-RK-BP

6
6 0 08-Jul-2021 CLIENT ISSUED FOR CONSTRUCTION SM-RK-BP
REV DATE ISSUED TO DESCRIPTION DRW-CHK-APP
1850

1800
800
ISSUED FOR CONSTRUCTION

6
Code A.441a
25 1568
Finish Porcelain tile wall cladding PLOT #: PLOT OWNER:

800
3660492 Marsa Al Arab LLC
Thickness 20mm
CLIENT:
Fixing Dry fixing

1200
1175

Marsa Al Arab

800
First Floor First Floor First Floor Residence LLC

6
9.760 m 9.760 m 9.760 m
TEL: (+971) 4 3665000
475

475
FAX: (+971) 4 3665001

800
P.O. Box 73137 Dubai
331

WEB: www.jumeirah.com

6
6

PROJECT MANAGEMENT:

800

8350
North 25
1606

3025
800
TEL: (+971) 4 3788000
FAX: (+971) 4 3788000
P.O. Box 112288 Dubai
6

6
WEB: www.north25.ae
Mezzanine Level Mezzanine Level Mezzanine Level

800
7.060 m 7.060 m 7.060 m
DESIGN & BUILD CONTRACTOR:
1606

Code A.441a
ASGC GROUP
6
Code A.441a
Finish Porcelain tile wall cladding
Finish Porcelain tile wall cladding
800
Thickness 20mm

700
Thickness 20mm
Fixing Dry fixing
Fixing Dry fixing TEL: (+971) 4 4258000
6

FAX: (+971) 4 4258060


P.O. Box 13164 Dubai
800

WEB: www.asgcgroup.com
1578

1420
6

LEAD CONSULTANT:

150 50 3085
KILLA ARCHITECTURAL
778

Ground Floor Ground Floor Ground Floor


DESIGN
20
440 6

6
4.160 m 4.160 m 4.160 m
2165 50 OFFICE 3103, BURJ AL SALAM TOWER,

20 584
1600
SHEIKH ZAYED ROAD, PO BOX 26642, DUBAI, UAE
TEL: +971 4 3554447
Road Level Road Level Road Level
3.500 m 3.500 m 3.500 m design EMAIL: info@killadesign.com
WEB: www.killadesign.com

ARCHITECT:

KILLA ARCHITECTURAL
DESIGN
OFFICE 3103, BURJ AL SALAM TOWER,
SHEIKH ZAYED ROAD, PO BOX 26642, DUBAI, UAE
TEL: +971 4 3554447
design EMAIL: info@killadesign.com
WEB: www.killadesign.com

PROJECT:

Part Elevation - 1 Part Elevation - 2 Part Elevation - 3 MARSA AL ARAB QUAY WALL VILLAS
SHEET NAME :
1 2 3 Type B - Panelisation - Miscellaneous
1 : 50 1 : 50 1 : 50
Elevation
DDA SHEET NUMBER : NUMBER SEQUENCE:

A-21006.-B 21006.
SCALE @ A1: DRAWN: CHECKED: APPROVED:
1 : 50 Author Checker Approver
PROJECT No: DESIGNED BY: DATE OF ISSUE:
1537 KLD 08-JUL-2021
DRAWING No: REV:
1537-B-KLD-ARC-DWG-21006.-EL 0
© Copyright KILLA ARCHITECTURAL DESIGN
DDA ELECTRONIC STAMP

KEY PLAN

1 1 1 1
30001. 30005. 30004. 30003.

1
5 4 3 2 30007. 1

33000

3400 3500 7820 6280 11700 300

GENERAL NOTES
Code A.570

PLOTLINE
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
Finish Glass Fibre reinforced plastic White 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
RAL 90003 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
Thickness As per specification 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
PLOTLINE

OTHERWISE.
Fixing Dry Fixing with steel hollow section
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
8860 +21.731 m PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
Code A.042d Code A.042f SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
Finish Powder coating to exterior aluminium Finish Anodized finish on aluminium profile - 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
549 PRLD Metalic Bronze APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF

975
150mm high Upstand Wall ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
Thickness +20.385 m Thickness 380 x 100 x 6mm
above MEP Room ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
Fixing Fixing Aluminium Rectangular section
Roof 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND

500
20.335 m APPROVED SHOP DRAWINGS.
Code A.570 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
Finish Glass Fibre reinforced plastic White TO UNDERTAKING ANY WORKS.
Code A.003a 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2019 (BIM).
RAL 90003

4995
Finish Exterior paint coat finish - Signal White 11. TRUE NORTH IS BASED ON VILLA PLOT 3 FOR TYPE C & PLOT 2 FOR TYPE B.
Thickness As per specification - RAL 9003
Fixing Dry Fixing with steel hollow section
Thickness Insulation with 15mm paint finish COORDINATION TRACKER
3575

3575
Terrace Deck Fixing Dry fixing

3175
A.300 A.300 A.300 A.300 A.300 A.300 +17.960 m 0 7/12/2021 12:47:24 PM
Code A.042d Code A.370 REV VER DESCRIPTION DATE & TIME OF PRINT
Finish Powder coating to exterior aluminium - Finish Clear Low Iron glass
Dark Grey FORMAL ISSUE

1200
Thickness 4mm Aluminium A.370 Thickness 10mmHS_1.52SGP_10mmHS
Fixing Dry Fixing +16.808 m
Fixing
Third Floor
16.760 m
475

475
425
Code A.441c
Code A.042f Finish
Code A.042d Porcelain Tile Cladding
Finish Anodize exterior finish to aluminium -
GT 545 Matt Finish Powder coating to exterior aluminium
Thickness 20mm
549 PRLD
Thickness 380 x 100 x 6mm Fixing Dry fixing

1850
Fixing Aluminium rectangular section Thickness 4mm Aluminium
DF-231
3500

02-014B Fixing Dry fixing


2900

FD- XX
A.300 A.300 A.300 A.300 A.300 A.300 A.300 A.300 A.300 A.300 A.300

3075
Code A.003a +14.435 m
Finish Exterior paint coat finish - Signal White
- RAL 9003
Code A.042d

1200
Thickness Insulation with 15mm paint finish A.370
Finish
18185 Total Building Height

Fixing Dry fixing Powder coating to exterior aluminium -


Dark Grey
450150

Second Floor
13.260 m Thickness 4mm Aluminium

460
Fixing Dry Fixing
Code A.570 0 08-Jul-2021 CLIENT ISSUED FOR CONSTRUCTION SM-RK-BP
Spiral Staircase
Finish Glass Fibre reinforced plastic REV DATE ISSUED TO DESCRIPTION DRW-CHK-APP
Infinity Edge of Pool Upstand for Staircase
Pool Deck Level Metal railing
1825

Thickness As per specification


ISSUED FOR CONSTRUCTION

1790
+11.590 m
Fixing Dry Fixing with steel hollow section
3500

A.311 A.300 A.300 A.300 A.300 A.300 A.300 A.300 A.300


DF-221 +10.960 m DF-231
01-012A 01-011A PLOT #: PLOT OWNER:

1200
FD- XX FD- XX
Code A.370
3660492 Marsa Al Arab LLC
19235

Finish Clear Low Iron glass +10.360 m


CLIENT:
1200

1200

1200
A.370 A.370 A.370 A.370 A.370
Thickness 10mmHS_1.52SGP_10mmHS

630
First Floor
9.760 m
Fixing Mosaic Tile Finish
Marsa Al Arab
475

475
Pool

Code A.042c Mosaic Tile Finish


Residence LLC
TEL: (+971) 4 3665000
Finish Powder Coating on Exterior aluminium
- Signal white - RAL 9003
FAX: (+971) 4 3665001
2700

P.O. Box 73137 Dubai

2225
Thickness 2 mm WEB: www.jumeirah.com
Fixing Dry fixing
PROJECT MANAGEMENT:
A.013 - Paint on exposed concrete
Mezzanine Level
7.060 m Piling by Structure Piling by Structure Piling by Structure North 25
TEL: (+971) 4 3788000
FAX: (+971) 4 3788000
2900

P.O. Box 112288 Dubai


2 WEB: www.north25.ae

63003
DESIGN & BUILD CONTRACTOR:

Ground Floor
4.160 m
ASGC GROUP
660

Road Level
3.500 m
TEL: (+971) 4 4258000
FAX: (+971) 4 4258060
P.O. Box 13164 Dubai
WEB: www.asgcgroup.com
2400

2400

LEAD CONSULTANT:

MSL
KILLA ARCHITECTURAL
1.100 m
DESIGN
OFFICE 3103, BURJ AL SALAM TOWER,
SHEIKH ZAYED ROAD, PO BOX 26642, DUBAI, UAE
TEL: +971 4 3554447
design EMAIL: info@killadesign.com
WEB: www.killadesign.com

ARCHITECT:

KILLA ARCHITECTURAL
1 1 1 1 DESIGN
30001. 30005. 30004. 30003.
30007. OFFICE 3103, BURJ AL SALAM TOWER,
SHEIKH ZAYED ROAD, PO BOX 26642, DUBAI, UAE
Elevation - Northwest (Sea side) TEL: +971 4 3554447
FACADE TILE SIZES USED:
design EMAIL: info@killadesign.com
3 Entrance Feature Wall - 800 X 1600 x 20
WEB: www.killadesign.com
1 : 75
Villa Walls - 300 x 600 x 6 PROJECT:
600 x 600 x 6
600 x 1200 x 6
MARSA AL ARAB QUAY WALL VILLAS
Boundary Wall - 300 x 600 x 6
600 x 600 x 6 SHEET NAME :
600 x 1200 x 6
Type B - Elevation - Northwest (Sea
NOTES
side)
DDA SHEET NUMBER : NUMBER SEQUENCE:

• All room areas shown in the drawings are measured to center line of the
partition walls.
A-20003.-B 20003.
• Wall thicknesses shown in wall tags do not include interior finishes and plaster.
• For all shafts, builders work and sleeves openings refer to MEP and Structural SCALE @ A1: DRAWN: CHECKED: APPROVED:
drawings. 1 : 75 SM RK BP
• For drainage & sand trap details, refer MEP and Structural drawings.
• Facade glazing zone is 200mm for all floors. PROJECT No: DESIGNED BY: DATE OF ISSUE:
• Cutting plane is set at 1200mm from FFL level.
NOTES • For Facade Details, refer Facade Consultant package. 1537 KLD 08-JUL-2021
• For all Acoustic rating information, refer Acoustic Consultant package.
• Appendix D - fixture and finishes schedule take precedance over illustrative • For Landscape finishes & details, refer Landscape package. DRAWING No: REV:
specs. • For Lighting details, refer LightingConsultant package. 1537-B-KLD-ARC-DWG-20003.-EL 0
© Copyright KILLA ARCHITECTURAL DESIGN
01/03/2023, 14:31 Aconex

Carmen Haz Final (WF-133314) 304 QVIL-ASGC-ARC-WIR-003316-… 23/05/2022


KILLA DESIGN WORKFLOW TRANSMITTAL KLD-WTRAN-079423

Sudhershan Bukya Fwd: Final (WF-133314) 304 QVIL-ASGC-ARC-WIR-003… 23/05/2022


ASGC CONSTRUCTION LLC TRANSMITTAL ASGC MAA-TRANSMIT-040722

Marsa Al Arab
14 Al Seef Street
Dubai
United Arab Emirates

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal KLD-WTRAN-079423 KLD-WTRAN-079423

Final (WF-133314) 304 QVIL-ASGC-ARC-WIR-003316-R0_Inspection Request For


Installation Of GRP Panel In Villa 9, Elev 03 from 2nd Floor To Roof ( Villa Type - B)
as per highlighted drawing .

From Ms Carmen Haz - Killa Design

To (6) Mr Sudhershan Bukya - ASGC Construction LLC (+5 more...)

Cc (14) Mr Onsy Tous - ASGC Construction LLC (+13 more...)

Sent Monday, 23 May 2022 2:08:20 PM GST (GMT +04:00)

Status N/A

DOCUMENT ATTACHMENTS (1)

(0 selected)

Revision
File Document No Revision Title Status
Date

Inspection Request For Installation Of GRP Panel In


304 QVIL-ASGC- B - Approved
0 21/05/2022 Villa 9, Elev 03 from 2nd Floor To Roof ( Villa Type -
ARC-WIR-003316 As Noted
B) as per highlighted drawing .

ATTRIBUTES

Attribute 1 07 Façade

Attribute 2 42 QVIL Project Wide

Attribute 3 Construction

https://mea.aconex.com/hub/index.html 1/3
01/03/2023, 14:31 Aconex

MESSAGE

Workflow Review History

The attached documents have completed the "304 QVIL-ASGC-ARC-WIR-003316-R0_Inspection Request For Installation Of GRP Panel In
Villa 9, Elev 03 from 2nd Floor To Roof ( Villa Type - B) as per highlighted drawing ." workflow with the following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

304 QVIL-ASGC-ARC- Killa Review C Haz B - Approved As Noted 1. Work inspection is only
WIR-003316 for the Installation Of GRP
Panel In Villa 9, Elev 03
from 2nd Floor To Roof (
Villa Type - B) As Per
Attached Highlighted
Drawings. 2. Works done
found acceptable for its
location of application and
installation as per the
attached latest and
approved shop drawings.
3. The Installations are
found Aligned within
tolerance. 4. All bottom
inner cores of GRP must
be free from any debris
and waste materials. 5.
Works done is subject to
completion work inspection
approval- end termination
sealant application, joint
sealant application and
buffing/polishing works. 6.
No damages are observed
during the inspection.
Make sure that whatever
has been installed are to
be well keep clean and
protected. 7. Ensure
proper coordination with
the floor level of the
balcony floor finished level
and ceiling level for its
proper interface
termination details as per
IFC drawings for
Architectural-Interior
Design Drawings. 8.

https://mea.aconex.com/hub/index.html 2/3
01/03/2023, 14:31 Aconex

Ensure proper coordination


to all other interrelated
design for facade finishing
details requirements-
External Ligthings, Glass
Balustrade, Facade Glass
Framing System( Mullion &
Transom) , Balcony Floor
Finished Level & Ceiling
Finished Level.

https://mea.aconex.com/hub/index.html 3/3