TASKS Sr Description Location Responsibility Status No. Rates of materials Mgr. Commercial List of materials shared 1 Block 6 on 18-03-2023 Preparation of abstract of SGC QS Task assigned through materials from existing BOQ. BLOCK Mr. Zaheer Mgr. 2 Construction SGC on 6A & 6B 18-03-2023 Preparation of Revised BOQ SGC QS Task assigned through Including Rate Analysis BLOCK Mr. Zaheer Mgr. 3 6A & 6B Construction SGC on 18-03-2023 Working on contractors Mgr. Construction Abstract of materials & application for price escalation rate analysis required from SGC QS. BLOCK Rate analysis (Item wise) 4 6A & 6B required from both contractors. All parties working for the same. Preparation of SGC QS. QS has forwarded BOQ/Engineering Estimate Inc. Mgr. Construction SCC Estimate of Structure 4 BLOCK 3A Rate Analysis works only for review on 18-03-2023 Preparation of Central Road SGC QS. X-section of road & Road BOQ/Engineering Estimate of (Tata Bazar to Mgr. Construction SCC plan drawing forwarded 5 road works Depo Road) to QS on 20-03-2023 1: Central Road (Main) Masjid & 2: Masjid & Block 7 Road Block 7 Road Material procurement & Hiring Abad Ul Haq Bajwa sb BOQ already forwarded of Contractor for External Mgr. Commercial to Mgr. Commercial External 6 water supply on, Central Road, Mgr. Construction Water Supply Block 4, Block 5 & 7, Masjid U.G Tank Material procurement & Hiring Abad Ul Haq Bajwa sb BOQ already forwarded of Contractor for External Mgr. Commercial to Mgr. Commercial External 7 Sewerage on, Central Road, Mgr. Construction Sewerage Block 4, Block 5 & 7, Masjid
Design of External Electrical Abad Ul Haq Bajwa sb Pending
works (Drawings, Plans, External Mgr. Construction 8 x-sections, specifications) Electrical ***Drawings in autocad works format Structure design of pump Abad Ul Haq Bajwa sb Pending room with RCC Slab for Mehmood Ul Hassan placement of 2x Transformers In front of Sr. Mgr. Arch 9 Masjid Mgr. Construction Fakhar sb Str. Engineer