SIX LANING OF PIMPALGAON-NASHIK-GONDE SECTION OF NH-3 FROM KM 380.000 TO 440.

000 IN THE STATE OF MAHARASHTRA ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) BASIS CONTRACT

AUTHOURITY ENGINEER :- TPF Getinsa-Euro Studios S.L. in JV with TPF Engineering Ptv. Ltd. CONTRACTOR :- DINESHCHANDRA R. AGRAWAL INFRACON PVT. LTD
SUMMARY OF REQUEST FOR INSPECTION OF WORK Date: 24-Apr-20
A) STRUCTURE WORK RFI SUMMARY
SL Date of Date of Request Chainage Length
RFI No. Description of Work Side Engineer Status Remarks
No Submission Request Time From To (m)

251 23-Apr-20 24-Apr-20 03.00pm LP2-Pedestal Reinforcement, Shutter Checking and Concrete (Ozar) LHS Mr. Tiwari
443 23-Apr-20 24-Apr-20 04.00pm LVUP-Excavation and PCC (Pimpalgaon) 387+100 Mr. Gupta
1083 23-Apr-20 24-Apr-20 11.00Am Span (P59-P60)2nd Stage Stressing(MEC) Mr. Avinash Bhavar
1084 23-Apr-20 24-Apr-20 11.00Am Span P48-P49-P50-3rd Stage Grouting(, MEC) Mr. Avinash Bhavar
1085 23-Apr-20 24-Apr-20 11.00Am Span P16-P15-P14-Unit Grouting(, MEC) Mr. Avinash Bhavar
1086 23-Apr-20 24-Apr-20 11.00Am Span P37-P38 Median ACB R/f, Shutter Checking and Concrete (MEC) Mr. Pramod Aher

B) Survey
1415 23-Apr-20 24-Apr-20 03.00pm LP2-Pedestal Level & Coordinate Checking (Ozar) LHS Mr.Deepak Ptel
1416 23-Apr-20 24-Apr-20 04.00pm LVUP-Founding Level Checking (Pimpalgaon) 387+100 LHS Mr.Deepak Ptel
1417 22-Apr-20 23-Apr-20 12.00pm Kokangaon RE Wall-Founding Level & Coordinate Checking 391+945 391+990 45 RHS Mr.Deepak Ptel
1418 23-Apr-20 24-Apr-20 04.00pm Adgaon S.Road-WMM Top Layer Level and FDD Checking 408+880 409+340 460 LHS Mr.Deepak Ptel
1419 23-Apr-20 24-Apr-20 10.30am Adgaon S.Road-WMM Top Layer Level and FDD Checking 409+150 409+340 190 RHS
C) Highway
365 22-Apr-20 23-Apr-20 12.00pm Kokangaon RE Wall-Leveling Pad Excavation and PCC 391+945 391+990 45 RHS Mr. Arun Verma
50 23-Apr-20 24-Apr-20 04.00pm Adgaon S.Road-WMM Top Layer Laying and FDD Checking 408+880 409+340 460 LHS Mr. Suresh Patel
51 23-Apr-20 24-Apr-20 10.30am Adgaon S.Road-WMM Top Layer Laying and FDD Checking 409+150 409+340 190 RHS Mr. Suresh Patel

552 23-Apr-20 24-Apr-20 09.00Am Pimpalgaon RE Wall-Retaining Wall 1st Lift R/f, Shutter Checking and Concrete (Dhule Side) Mr. Gupta

553 23-Apr-20 24-Apr-20 10.00Am Pimpalgaon RE Wall-29th Layer FDD Checking 386+691 386+641 50 LHS
554 23-Apr-20 24-Apr-20 10.00Am Pimpalgaon RE Wall-24th Layer FDD Checking 386+641 386+580 61 LHS
555 23-Apr-20 24-Apr-20 10.00Am Pimpalgaon RE Wall-22nd Layer FDD Checking 386+580 386+460 120 LHS
556 23-Apr-20 24-Apr-20 10.00Am Pimpalgaon RE Wall-29th Layer FDD Checking 386+691 386+580 111 RHS
557 23-Apr-20 24-Apr-20 10.00Am Pimpalgaon RE Wall-20th Layer FDD Checking 386+580 386+510 70 RHS
558 23-Apr-20 24-Apr-20 10.00Am Pimpalgaon RE Wall-13th Layer FDD Checking 386+510 386+442 68 RHS

D) Electrical

D) Other

Contractor Client
Representative Representative