Item of work Unit Qty. Rate (in
No.
lacs)
240.45
1 Trench excavation in berms Cum 0.00 0.00
+30%
Superintending Engineer
R&B Circle Pulwama /Shopian
Detailed Estimate for Excavation in Berms
for
Upgradation of Shadab Karewa Manloo road i/c Launching of baily bridges
over Nallah Rambiara Dachnu Heerpora & Construction of road either side
of baily bridge
S. Amount
Item of work Unit Qty. Rate
No.
1 Earth work in excavation by manual eans in
trenches for foundation drains pipes cables
etc (not exceeding 1.5 mtr in width) and for
shafts wells cesspits and the like not
exceeding 10 Sqm on plan depth up to 1.5 Cum 2000.00 240.45
625170.00
mtrs including disposal of excavated earth +30%
up to 1 mtr from cutting edge ,disposal earth
to be levelled and neatly dressed in all kinds
of soil
2x4x1000x1x0.30 = 2400 Cum
Total = 6.25
S. Amount
Item of work Unit Qty. Rate
No.
1 Supply, stacking, laying, watering & rolling
with PRR of 8-10 ton capacity, GSB in layers
not exceeding 22cm in thickness and
maximum size of stone aggr, not exceeding
110mm including carriages complete. Cum 2400.00 750.00 1800000.0
2x4x1000x1x0.30 = 2400 Cum
Total = 1800000.0
Total = 34.88
S. Amount
Item of work Unit Qty. Rate
No.
1 P/L wet mix with specified stone aggr.
incl. laying with paver finisher with PRR
incl carriages of materials involved with all
leads and lifts complete Cum 2250.0 2500.00 56.25
4x1000x3.75= 15000.00x0.15= 2250 Cum
Total = 56.25
S. Amount
Item of work Unit Qty. Rate
No.
1 Providing & laying of 50 mm thick
compacted Bituminous Macadam in
accordance with IRC/ CPWD/ MOST
specification adopting aggregate adopting
agg. Grading-1st with binder content not
less than 3% (60 Kgs/ Cum) by weight of
total mix incl mixing of agg. with bitumen
and laying with Paver finished to the
required level, grade & rolling with 8-10
ton capacity road roller to achieve the
required compaction & density incl. all Cum 750.00 9500.00 71.25
costs , carriages of materials involver,
tools, plant , equipment & all allied
machinery, labour, taxes/ octroi, fees,
testing charges for maintaining quality
control.
Total = 71.25
S. Amount
Item of work Unit Qty. Rate
No.
1 Providing & laying of 25mm thick
semidense Bituminous concrete with
bitumen of 60/70 grade @5.5% & filler
(lime) @5% by weight of total mix. on
prepared surface with specified graded
stone aggregate, hot mixing of bitumen
with filler and stone agg. In hot mix plant ,
transporting the mixed material by tippers
to paver and laying the mixed material Sqm 15000 475.00 71.25
with Sensor paver finisher fitted with
electronic sensing device to the required
level and grade and rolling with road
rollers as per MORTH specifications to
achieve the desired density and
compaction.
1x4000x3.75 =
Total = 71.25
1x100x1.20x0.70 = 240.45 +
Cum 84.00 26257
30%
2 P/L of stone soling hand packed under
foundations, including all carriages
involved complete job.
1x100x1.00x0.15 = 15.00
Cum 900.00 11475
D/d 15% voids Net 12.75
3 P/L in position cement concrete (1:4:8)
mix
1x100x1.00x0.10 = 3112.8
Cum 10.00 40466
+30%
4 P/L cement concrete wall (1:3:6) mix
1x100x1.00+0.40x1.85 = 3707.40
Cum 129.50 624141
2 . +30%
5 Form work of ordinary timber planks
2x100x1.85 179.25
Sqm 370.00 86219
+30%
7 Carriage of different materials from source
to site of work.
a) Stone aggregate from Arigam for an avg
lead of 25 Kms 273.03
Cum 124.15 44066
+30%
Qty vide item no 3,4 = 124.15 Cum
b) Sand from Kakapora lead avg. 35 Km qty
Cum 62.77 331.65 27038
vide item no 3,4 = 62.77Cum
S. Amount
Item of work Unit Qty. Rate
No.
Total = 859663
Cost for 1 Rm = 8597
S. Amount
Item of work Unit Qty. Rate
No.
1 Earthwork in excavation for structures as
per drawing and technical specifications
Clause 305.1 including setting out,
construction of shoring and bracing,
removal of stumps and other deleterious
material and disposal upto a lead of 50 m,
dressing of sides and bottom and
backfilling in trenches with excavated
suitable material.
1x100x1.25x0.10 =
4 Providing/laying of cement concrete 3707.40+
Cum 35.00 168687
(1:3:6) mix 30%
2x100x0.40+0.30x0.50 =
2
5 Providing concrete for plain/reinforced
concrete in open foundations complete as 370.20+3
per drawings and technical [ P.C.C. grade Sqm 45.00
0%
21657
M 20, Nominal mix (1:2:4)]
S. Amount
Item of work Unit Qty. Rate
No.
1x100x0.45 =
6 Form work of ordinary timber planks
2x2x100x0.50 = 179.25 +
Sqm 200.00 46605
30%
7 Carriage of different materials from source
to site of work.
a) Stone aggregate from Arigam for an avg
lead of 25 Kms 273.03
Cum 44.00 15617
+30%
Qty vide item no 3,4,5 = 44.00 Cum
b) Sand from Kakapora lead avg. 35 Km qty
Cum 23.98 331.65 10330
vide item no 3,4,5,7 = 23.98 Cum
Total = 359658
Cost for 1 Rm = 3596.58
S. Amount
Item of work Unit Qty. Rate
No.
1 Earthwork in excavation in hard and soft
soil for construction of Kacha drain
including normal lead and lift.
8889x0.6x0.06 = 240.45 +
Cum 3000.00 937755
30%
Total 937755
RM 100.00 3500.00
Total =
of baily bridges
road either side
Amount
350000
350000
Engineer,
on Shopian
EMPLOYEMENT GENERATION
S.NO Particulars Qunantum
Estimated Cost
146.78
1
52.84
3 Labour Component (40% of S/No 2)
Expenditure on
(A.) Skilled Labours (10%) 13.21
4 (B)Unskilled Labours (90%) 118.89
Man Days (8 hours)
(A) Skilled @Rs 550/Day 2402
5 (B) unskilled@Rs 450/Day 26420
###
Annexure B
Rural Road Projects:- Physical Details RIDF
Circle: - R&B Circle Budgam/Srinagar
Existing Pavements Proposed Item Increase
Length of Class of Cost of Roadway Thickness
S/No Name of Road District Carriageway Roadway Carriage Pavement Roadway Carriage Pavement
Road Road Project Width Width Width Width Thickness Width Width Thickness Cost Per
Km
1 2 4 5 6 7 8 9 11
1 Upgradation of
Dangerpora
Moolu, Noolie
Chetergam Road
Including Kengam
Dobipora and Village
Mashjid Shrif Shopian Err:509 146.78 5 to 5.50 3.75 100 5.5m 3.75m 250 5.5 3.75 250 Err:509
Road
Link Road
Annexure C
Rural Road Projects:- Details of P.C.U
Circle: - R&B Circle Pulwama/Shopian
S/No Types Of vehicles Numbers Per Conversion Factor
Day P.C.U’s
1 Cycles 20 0.5 10
Animal Draw Carts/ Hand Drawn
2 Carts 30 4 120
3 Motor Cycles 20 0.5 10
4 Light Motors/ Cars 11 1 11
5 Tractors 10 4.5 45
Upgradation of Dangerpora
Moolu, Noolie Chetergam Road
Including Kengam Dobipora and