Construction of Bridge 1x40M Trussed Girder Foot Bridge
Name of work : Construction of 1x40 M Trussed Girder Bridge
Chequered plate Decked Bridge over Tongry Nallha
Near Girls high School
Constituency : Watchi
Name of District : Shopian.
Authority : Chief Engineer PWD (R&B) Kashmir
1). History & Necessity:- The RCC Footbridge at Tongry
Nallha Zanipora near Girls high School was washed away due to
floods of Sept. 2014. The village got cut off from the main road causing
great inconvenience to vehicular movement and general public. There
is urgent necessity of construction of Footbridge at Zanipora near Girls
school to give connectivity to mitigate the sufferings of inhabitants.
The footbridge will benefit about 50,000 souls.
2). Proposals:-
a). Sub-structure: There is boulder strata all along and
around the Bridge site, as such open foundation
and RCC abutments are proposed with proper
protection work both on the upstream as well as
downstream sides of Bridge.