Abstract of Cost

for
Strengthening/Upgradation:- of Chitragam Kalan Bandpawa Road by
way of P/L of 75mm thick wet mix,50mm thick bituminous macadam,
25mm thick semidense with 6mm thick Seal Coat

S.
Item of work Unit Qty. Rate
No.
Providing / Laying of 75mm thick Wet
Cum 274 1500
Mix
2 Providing /Applying of tack Coat Sqm 3650 48.0
Providing / Laying of 50mm thick
3 Cum 182.50 8000
Bituminous Macadam
Providing / Laying 25mm thick
4 Sqm 3650 350
Semidense
Providing / Laying of 6mm thick seal
5 Sqm 3650 75.0
coat
Total =
Add 3% for W.C =
Total =

Asstt. Executive Engineer Executive Engineer,


PW (R&B) Sub Division Zanipora PW (R&B) Division Shopian

Superintending Engineer
Pw R&B Circle Pulwama /Shopian
HQ Pulwama
Abstract of Cost
for
radation:- of Chitragam Kalan Bandpawa Road by
m thick wet mix,50mm thick bituminous macadam,
ick semidense with 6mm thick Seal Coat

Amount
(in
lacs)
4.11

1.75

14.60

12.78

2.74

35.97
1.08
37.05

Executive Engineer,
PW (R&B) Division Shopian

Superintending Engineer
Pw R&B Circle Pulwama /Shopian
Detailed Estimate for Providing / Laying of 75mm thick Wet Mix
for
Strengthening/Upgradation:- of Chitragam Kalan Bandpawa
Road
S. Rate Amount
Item of work Qty. Unit
No.
1 Providing, laying, spreading and
compacting 100mm thick wet mix graded
stone aggregate to wet-mix macadam
specifications incl pre-mixing the material
with water at OMC in mechanical mix plant
carriage of mixed material by tipper to site,
laying in uniform with paver in base course
on well prepared surface & compacting
with vibratory roller to achieve the desired
density specifications thickness 150 mm
compacted thickness (MORT & H
specifications. clause 406..incl all leads
lifts,

1.00 1000 3.65 0.075 274


Total 274 Cum 1500 4.11
Grand Total = 4.11

Assistant Executive Engineer Executive Engineer


PW(R&B) Sub Div Zanipora PW(R&B) Division Shopain
Detailed Estimate for Providing /Applying of tack Coat
for
Strengthening/Upgradation:- of Chitragam Kalan Bandpawa Road

S. Rate Amount
Item of work Qty. Unit
No.
1 Providing,/Applying 100 x 80 grade
bituminous tack coat @ 0.75 kg/ M2 with
mechanical sprayer including removal of
dirt ,dust etc and wire brushing ,air
compressor complete job .

1.00 1000 3.65 3650

Total 3650 Cum 48.00 1.75


Grand Total = 1.75

Assistant Executive Engineer Executive Engineer


PW(R&B) Sub Div Zanipora PW(R&B) Division Shopain
Detailed Estimate for Providing / Laying of 50mm thick
Bituminous Macadam
for
Strengthening/Upgradation:- of Chitragam Kalan Bandpawa Road

S. Amount
Item of work Unit Qty. Rate
No.
1 Providing and laying 50mm thick bitumen macadam
base course with stone aggregate of quality size and
grading as per specified in CPWD specification and
straight run bitumen of V-G 10 80/100 @ 3.3% (66
kg) by weight of total mix including hot mixing of
stone aggregate and bitumen in hot mix plant,
transporting mixed material and laying with Paver
finished to required level grade, rolling with road
roller of 8 to 10 tone capacity to achieve the
required compaction and density including coat of Cum 182.50 8000 14.60
carriage of all materials involved T & P and
equipment all allied machinery labour, taxes, testing
charges for maintaining quality control during and
after execution of work complete job (excluding
cost of tack coat) 50mm thick compacted thickness
(quarry).

1x1000x3.65x0.050 =
Total = 14.60

Asstt. Executive Engineer Executive Engineer,


PW(R&B)Sub Division Zanipora PW(R&B) Division Shopian
Detailed Estimate for P/L of 25mm thick Semidense
for
Strengthening/Upgradation:- of Chitragam Kalan Bandpawa Road

S. Amount
Item of work Unit Qty. Rate
No.
1 Providing and laying of 25 mm thick
semidense bituminous concrete with V-G
10 of 80/100 grade @5.5% and@ 5% by
weight of total mix on prepared surface
with specified graded stone aggrts, hot mix
bitumin with filler and stone aggregates. In
hot mix plant transporting the mixed
meterial by tippers and laying the mixed Sqm 3650 350 12.78
meterial with sensor paver finisher fitted
with electronic sensing device to the
required level and grade and rolling
withroad rollers as per MORTH
specifications to acheive cdesired density
and compactions.

1x1000x3.65=3650
Total = 12.78

Asstt. Executive Engineer Executive Engineer,


R&B Sub Division Zanipora R&B Division Shopian
Detailed Estimate for Providing / Laying of 6mm thick seal coat
for
Strengthening/Upgradation:- of Chitragam Kalan Bandpawa Road
S. Rate Amount
Item of work Qty. Unit
No.
1 Providing, laying, spreading and
compacting of 6mm thick seal coat of
premixed fine aggrgts. With bitumin grade
VG-10 incl. rolling, finishing and cost and
carriage of all materials.involvied
specifications thickness 6mm compacted
thickness (MORT&H) specifications
(Complate Job)

1.00 1000 3.65 3650


Total 3650 Sqm 75.0 2.74
Grand Total = 2.74

Assistant Executive Engineer Executive Engineer


PW(R&B) Sub Div Zanipora PW(R&B) Division Shopain