Final Snag Lists Observation Report Date of Visit
Final Snag Lists Observation Report Date of Visit
04th March,2024
DATE OF
05th March,2024
VISIT
07th March,2024
Mr.Ramoorthy (JSFOA)
INSPECTED Mr.NandaKumar (Berger Paints)
PERSONS Mr.Kirubagaran (V3 Enterprises)
SCOPE
S.NO BLOCK 2 SNAG POINTS V3 / BERGER JSFOA SIGN
1 West side 1C, 2C OTS RestRoom Wall ( WALL SHIELD) YES -
2 WEST SIDE 2E Balcony Paint PeelOff Touchup YES -
3 South Side 1E RestRoom Seepage Found - YES
4 South Side 2D, 3D Balcony Paint PeelOFF Touchup YES -
5 South Side 2D RestRoom Seepage Found - YES
6 South Side 1D OTS Pipeline & Ceiling Paint Touchup YES -
7 South Side1c RestRoom Seepage Found - YES
8 South Side 1C OTS Wall (WALL shield & paint Touchup) YES -
9 South Side 1C Balcony Bottom Paint Touchup YES -
10 South Side 2B OTS Wall ( WALL SHIELD ) YES -
11 East Side 2B,1B OTS Wall ( WALL SHIELD & Paint Touchup) YES
12 East Side 3B RestRoom Seepage Found - YES
13 North Side 2H Balcony Paint PeelOFF Touchup YES -
14 North Side 1G OTS Wall ( WALL SHIELD & Paint Touchup) YES -
15 COMMON RESTROOM PAINTING YES -
16 INTERIOR 3D OTS Wall ( WALL SHIELD & Paint Touchup) YES -
17 INTERIOR 4H OTS Wall ( WALL SHIELD & Paint Touchup) YES -
18 INTERIOR 1D OTS Wall ( WALL SHIELD & Paint Touchup) YES -
19 INTERIOR Kitchen Side 1C to 3c OTS Wall ( WALL SHIELD & Paint Touchup YES -
20 4D & 4G Corridor wall ( WALL SHIELD & Paint Touchup) YES -
21 3E,3D,3C Corridor wall ( WALL SHIELD & Paint Touchup) YES -