PILE LOAD SCHEDULE

PILE DIA
PILE NO. NO. OF PILES (mm) PILE LOAD (SERVICE) kN.
COMPRESSION
P1 20 600 1600
P2 8 600 1600

APPROXIMATE PILE LOAD CAPACITIES AND PILE TOE LENGTHS


a.

ARE DERIVED FROM GEOTECHNICAL REPORT AND AMMENDMENTS


PROPOSED BY AJK ENGINEERS. FINAL PILE LENGTHS AND TOE
LEVEL TO BE ESTIMATED BY PILING CONTRACTOR USING EXISTING
DATA, INDEX PILE LOAD TEST AND FURTHER SOIL INVESTIGATIONS
AS REQUIRED.

b. PILE CUT OFF LEVEL TO BE CROSS CHECKED WITH PILE CAP TOP
LEVELS AND THICKNESS GIVEN IN THE DRAWINGS SCHEDULE

NOTES:
1. ALL PILES SHALL BE DESIGNED AS FIXED HEAD.

2. THE MAXIMUM ALLOWABLE LATERAL DISPLACEMENT UNDER IS


5mm UNDER WORKING LOADS.
PILE LOAD SCHEDULE
INDICATIVE PILE
E LOAD (SERVICE) kN. PILE CUT OFF LEVEL a (m)
TOE LEVEL b (m)
HORIZONTAL
80 REFER TO PILE ELEV. AT 23m DEPTH
100 REFER TO PILE ELEV. AT 23m DEPTH