You are on page 1of 3

METHOD STATEMENT FOR INSTALLATION OF ALUMINIUM

STRIP CEILING WITH ACOUSTIC MINERAL WOOL INSULATION


WRAPPED WITH BLACK FABRIC.

Here are the general steps for installation of aluminium strip ceiling:

1. Measure and plan the installation: Before you begin the installation,
measure the dimensions of the ceiling and plan the layout of the
aluminium strips. Determine the direction of the linear pattern and ensure
that the strips are evenly spaced and aligned.

2. Install the suspension system: The aluminium strip ceiling is usually


installed on a suspension system that consists of metal tracks or furring
channels that are suspended from the ceiling with wires. Install the tracks
or furring channels according to the manufacturer's instructions, ensuring
that they are level and plumb.

1
3. Cut the aluminium strips: Measure and cut the aluminium strips to fit the
length of the ceiling. Use a metal cutting saw or shears to cut the strips to
size.

4. Attach the aluminium strips: Attach the aluminium strips to the


suspension system using clips or screws. Ensure that the clips or screws
are evenly spaced and aligned with the tracks or furring channels.

5. Finish the installation: Once all the aluminium strips are attached, finish
the installation by installing the perimeter trim and any additional
accessories, such as acoustic mineral wool insulation with black fabric.

6. It's important to follow the manufacturer's instructions carefully when


installing an aluminium strip ceiling, as the specific installation process
may vary depending on the system being used.

2
3

You might also like