MOS Painting
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
METHOD STATEMENT :
EXTERNAL & INTERNAL PAINTING
JOB TITLE:
Prepared by Signature
Effective Date
11/03/2024
1
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
INDEX
1.0 OBJECTIVE
11.0 APPENDIX
2
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
1.0 OBJECTIVE:
This work method statement covers outline procedure for Column Works for DESIGN AND
BUILD FOR THE PROPOSED OPTIMIZATION OF TERMINAL FACILITIES AND ITS
ASSOCIATED WORKS AT SULTAN AZLAN SHAH AIRPORT, IPOH, PERAK DARUL
RIDZUAN.
1. Construction Manager
2. Site Engineer
3. Site Supervisor
5. Surveyor
6. Operator
7. Workers
3
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
4.0 MATERIAL LIST (SDS required for any chemical need to be used)
Below is the list of materials that will be used in this scope of work:
Paint
1.
2.
3.
4.
5.
6.
1. Scaffolding
4
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
6.1.1 Manufacturer’s technical information must be provided by supplier such as label analysis,
instruction for handling, storing and applying each material proposed for use in this process.
6.5 Executions
6.5.1 Primer and Finish Coats
6.5.1.1 Paint shall not apply in rain, mist or when the relative humidity exceeds 85 percent
or damp or wet surface.
6.5.1.2 Examine Substrates, area and condition under which painting will be performed for
compliance with paint application requirements. Paints shall not apply until
unsatisfactory condition have been corrected and surface receiving paint are
thoroughly dry.
6.5.1.2 Remove hardware and hardware accessories plates, machine surface, lighting,
fixture and similar items already installed that are not to be painted. If removal is
impractical or impossible because of the size or weight of the item, surface applied
protection shall be provided before surface preparation and painting after
5
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
completing painting operation in each space of area, reinstall items removed using
worker skilled in trade involved.
6.5.1.3 cleaning the substrates of substances that could impair the bond of the various
coating. Oil and grease shall be removed before clearing.
6
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
6.5.6.1 All joinery to be painted shall be primed before delivery to the site or, in the case
of joinery prepared on site, as soon as possible after preparation. Surfaces
subsequently cut or damaged shall be re-primed.
6.5.6.2 All hidden faces of joinery, including the back of boarding, frames, skirting,
architraves, etc. and bottom edges of doors, shall be primed before fixing.
Approved clear wood preservative shall be using instead, where adjacent faces
have polished or natural finish.
6.5.8 Protection
3.5.8.1 All other works, fitting, paving etc. shall be covered up and protected as necessary
during decoration, and all splashes and paint marks shall be removed on
completion.
The airside activities that will be carried out during the operation stage and the potential
environmental impact that may occur is summarized with mitigation measures in the following
table.
7
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
3)
8
Document No : TBR-P-PM-MS-01
Revision No : 00
TERAS BUDI RESOURCES SDN BHD
Effective Date : ‘11/03/2024
2)
3)