Weekly Diary - 13,15,16,20
Weekly Diary - 13,15,16,20
Description: -
We formed the group of 4 students. Due to lockdown it took us nearly two weeks to finalize
the group. We the selected a guide to guide us during our project.
Appendix D
Week No. 012
Week No.
170/08/2020 to 2164/08/2020
Appendix D
MEETING NO- 2
SELECTION OF TOPIC
03
Week No.
25/08/2020 to 31/08/2020
Description: -
In meeting number 2 we searched for different projects that we could select for our project.
The different projects were such as automatic hand sanitizer stand, onion seed thresher,
pneumatic sheet cutting machine, etc. After doing how to perform the project we understood
that we were not well versed with all the concept that were required to perform the project.
So we decided to select the topic which would be fully related to our course and we would be
able to apply our knowledge or practice what we learned through performing the project. So
we decided to select “Design And Fabrication Of Pneumatic Vice” as our topic.
Appendix D
Appendix D
MEETING NO- 3
SEARCHING THE MODEL
Description: -
The initial stage of our project was to find out Pneumatic cylinder that was required for our
project. So we searched for the cylinder in various scrap shops. We found the cylinder but it
was not in the condition of maintenance so we decided to search more shop to get an cylinder
as required for our project.
Finally, we found cylinder required for project. After the primary inspection we understood
that the cylinder had starting problem due to its fuel injector. The rest of the engine was in
good condition. We decided to select that cylinder for our project.
Appendix D
Appendix D
09
Week No.
05/10/2020 to 11/10/2020
Appendix D
MEETING NO- 4
GATHERING OF PRIMARY DATA
Description: -
We then started collecting data about the project such as specification of Pneumatic vice and
its components , its working, construction, its application, its advantage and disadvantage.
We then gathered al data and placed it together.
Appendix D
Activities Planned Gathering of Primary Data.
Appendix D
MEETING NO- 5
DESCRIPTION OF PNUEMATIC COMPONENTS
Description: -
We then gathered at one place and decided to get description. We studied about the
compressor, direction control valve. We then slowly put the information in correct for
direction control valve and important compressor information so we can easily have it.
Appendix D
Appendix D
15
Week No.
01/12/2020 to 07/12/2020
Appendix D
MEETING NO- 6
ASSEMBLY OF Pneumatic Vice
Description: -
We again gathered for the assembly of Pneumatic Vice. Firstly put batch vice on top of steel
plate as per our required size. Mounted cylinder successfully and cylinder rod with the help
of fabrication work and then provided clamp and put hard metal plates to clamping object in
a vice.
08/12/2020 to 14/12/2020
Activities Planned
Maintenance and Assembly of
Pneumatic Vice.
Activities Executed
We went to different automobile
workshops and learned how to
maintain the Pneumatic Vice.
Reason for delay if any
-
Appendix D
Appendix D
17
WAceteivkitNieos.Planned
15/12/2020 to 21/12/2020
Appendix D
20
Week No.
05/01/2021 to 11/01/2021
Appendix D
MEETING NO- 7
Description: - Due to technical problem we were not able to complete the maintenance
of project that is Pneumatic Vice. The double acting cylinder was not moving we can
say that compressor had to play to a role in it. Due to this we watched some youtube
videos to fix the problem. After everyone gone through the process we solved the issue
of the working part of the cylinder.
Appendix D
22
Week No.
118/04/2021 to 2174/04/2021
Appendix D
Week no 23
18/04/2021 to 24/04/2021
Appendix D
MEETING NO- 8
REPORT WRITING
Activity Started on- 25/04/2021
Activity Ended on- 15/05/2021
Description: -
We again gathered for report writing. then we put together the data we researched on, then we
arranged the data according to the format of Maharashtra state board of technical education
website. Then we edited the data after that we prepared a soft copy of the report. we went
through the whole report and we were satisfied of our work and mailed it to the project guide.
they also went through the report and give their suggestion on project report data and asked
us the make few changes, we worked on the report and made improvements in the report as
they asked and mailed it to the guide again. They liked the work we did after that we mailed
it to the project coordinator. They also give their suggestion on the project report format and
they asked us to correct something, we worked on it to and mailed the final report to the
coordinator again and they finalized the Report.
24
Week No.
25/04/2021 to 01/05/2021
Appendix D