AMRUTVAHINI POLYTECHNIC SANGAMNER

DIST- AHMEDNAGAR PIN- 422608


DEPARTMENT OF MECHANICAL ENGIEERING
ACADEMIC YEAR 2020-21
A
Capstone Project Report Diary
on
Design and Fabrication of Pneumatic Vice
of
SUBJECT: Capstone Project Planning
Course Code: 22058
in
FIFTH SEMESTER
Successfully Submitted To
Project Guide: - Prof. Gaikwad S.G
Submitted by: -
13 Bhand Nishant Kailas.
15 Dhere Viabhav Dilip.
16 Bhalearo Satyashil Rajaram.
20 Adik Jaydeep Balasaheb.
MEETING NUMBER- 1
SELECTION OF GROUP MEMBERS

Activity Started on- 10/8/2020


Activity Ended on- 24/8/2020

Description: -
We formed the group of 4 students. Due to lockdown it took us nearly two weeks to finalize
the group. We the selected a guide to guide us during our project.

SR. ROLL GROUP MEMBER NAMES SIGNATURE


NO. NO.

01. 13 Bhand Nishant Kailas

02. 15 Dhere Vaibhav Dilip

03. 16 Bhalearo Satyashil Rajaram.

04. 20 Adik Jaydeep Balasaheb

Project Guide: - . Mr. Gaikwad S.G


Project Co-ordinator: - Mr. Maldhure S.S.

Mr. Gaikwad S.G Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)

Appendix D
Week No. 012
Week No.
170/08/2020 to 2164/08/2020

Activities Planned Group Formation.

Activities Executed We selected the group members and


form the group.
Name of group members: -
13-Bhand Nishant Kialas
15-Dhere Viabhav Dilip.
16-Bhalearo Satyashil Rajaram.
20-Adik Jaydeep Balasaheb
Reason for delay if any
-

Corrective measure adopted


-

Remark and Signature of the guide


Prof. Gaikwad S.G
Activities Planned Group Formation.

Activities Executed We selected the Guide.


Name of Guide-
Prof. Gaikwad S.G.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G.

Appendix D

MEETING NO- 2
SELECTION OF TOPIC
03
Week No.
25/08/2020 to 31/08/2020

Activities Planned Selection of Topic.

Activity Started on- 25/8/2020


Activity Ended on- 13/9/2020

Description: -
In meeting number 2 we searched for different projects that we could select for our project.
The different projects were such as automatic hand sanitizer stand, onion seed thresher,
pneumatic sheet cutting machine, etc. After doing how to perform the project we understood
that we were not well versed with all the concept that were required to perform the project.
So we decided to select the topic which would be fully related to our course and we would be
able to apply our knowledge or practice what we learned through performing the project. So
we decided to select “Design And Fabrication Of Pneumatic Vice” as our topic.

Mr. Gaikwad S.G. Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
Week No
04

Activities Executed Searched different topics. After


selected one by the team members

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the Gaikwad S.G.


guide

Appendix D
Appendix D
MEETING NO- 3
SEARCHING THE MODEL

Activity Started on- 14/9/2020


Activity Ended on- 11/10/2020

Description: -
The initial stage of our project was to find out Pneumatic cylinder that was required for our
project. So we searched for the cylinder in various scrap shops. We found the cylinder but it
was not in the condition of maintenance so we decided to search more shop to get an cylinder
as required for our project.
Finally, we found cylinder required for project. After the primary inspection we understood
that the cylinder had starting problem due to its fuel injector. The rest of the engine was in
good condition. We decided to select that cylinder for our project.

Mr. Gaikwad S.G. Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
Appendix D
076
Week No.
1214/09/2020 to 207/09/2020

Activities Planned Searching of the Model.

Activities Executed Firstly, we divided our group into two


parts. Then we started the searching
model (Design and Fabrication of
Pneumatic Vice).

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof.Gaikwad S.G.


Week No
08

Activities Planned Searching of the Model.

Activities Executed We found the engine. Then we did a


preliminary inspection of that engine.
After a preliminary inspection we
realized that the engine we found was
Reason for delay if any n- ot in maintenance condition so we
decided to find Cylinder.

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D

Appendix D
09
Week No.
05/10/2020 to 11/10/2020

Activities Planned Searching of the Model.

Activities Executed We found cylinder required for our


project.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G.

Appendix D
MEETING NO- 4
GATHERING OF PRIMARY DATA

Activity Started on- 12/10/2020


Activity Ended on- 26/10/2020

Description: -
We then started collecting data about the project such as specification of Pneumatic vice and
its components , its working, construction, its application, its advantage and disadvantage.
We then gathered al data and placed it together.

Mr.Gaikwad S .G Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
110
Week No.
192/10/2020 to 2186/10/2020

Activities Planned Gathering of Primary Data.

Activities Executed We independently searched for basic


information about the Pneumatic vice
and its main components.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D
Activities Planned Gathering of Primary Data.

Activities Executed We gathered.


We then collected all the information
we found.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G.

Appendix D
MEETING NO- 5
DESCRIPTION OF PNUEMATIC COMPONENTS

Activity Started on- 27/10/2020


Activity Ended on- 7/12/2020

Description: -
We then gathered at one place and decided to get description. We studied about the
compressor, direction control valve. We then slowly put the information in correct for
direction control valve and important compressor information so we can easily have it.

Mr. Gaikwad S.G Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
Appendix D
132
Week No.
0237/101/2020 to 029/11/2020

Activities Planned Description of other remaining


components.

Activities Executed We gathered again and got information


about double acting cylinder,
pneumatic pipe

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G.


Week No 14
10/11/2020 to 15/11/2020

Activities Planned Description of last components.

Activities Executed - We again gathered and found


information about batch vise and flow
control valve

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D

Appendix D
15
Week No.
01/12/2020 to 07/12/2020

Activities Planned Advantages and disadvantages of


Pneumatic Vice.

Activities Executed We studied advantages and


disadvantages of pneumatic vice

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G.

Appendix D
MEETING NO- 6
ASSEMBLY OF Pneumatic Vice

Activity Started on- 8/12/2020


Activity Ended on- 11/01/2021

Description: -
We again gathered for the assembly of Pneumatic Vice. Firstly put batch vice on top of steel
plate as per our required size. Mounted cylinder successfully and cylinder rod with the help
of fabrication work and then provided clamp and put hard metal plates to clamping object in
a vice.

Mr. Gaikwad S.G. Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
Week No. 16

08/12/2020 to 14/12/2020

Activities Planned
Maintenance and Assembly of
Pneumatic Vice.

Activities Executed
We went to different automobile
workshops and learned how to
maintain the Pneumatic Vice.
Reason for delay if any
-

Corrective measure adopted


-

Remark and Signature of the guide


Prof. Gaikwad S.G

Appendix D
Appendix D
17
WAceteivkitNieos.Planned
15/12/2020 to 21/12/2020

Activities EPlxaencnuetedd Assembly and maintenance of


Pneumatic Vice

RAectaisvoitniefsorEdxeclauyteidf We made a list of parts that are no


any longer in use and purchased them.
Then those parts were replaced.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G.


19
Week No.
29/12/2020 to 04/01/2021
Remark and Signature of the guide

Activities Planned Maintenance and Assembly of


Pneumatic Vice.

Activities Executed We completed the maintenance of the


Pneumatic Vice

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D
20
Week No.
05/01/2021 to 11/01/2021

Activities Planned Working of pneumatic vice.

Activities Executed We studied working of Pneumatic vice

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D
MEETING NO- 7

Activity Started on- 05//042021


Activity Ended on- 24/04/2021

Description: - Due to technical problem we were not able to complete the maintenance
of project that is Pneumatic Vice. The double acting cylinder was not moving we can
say that compressor had to play to a role in it. Due to this we watched some youtube
videos to fix the problem. After everyone gone through the process we solved the issue
of the working part of the cylinder.

Mr. Gaikwad S.G Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
21
Week No.
05/04/2021 to 10/04/2021

Activities Planned To complete the maintenance

We diagnosed that the batch vice was


Activities Executed fallen apart. We did fix the problem.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D
22
Week No.
118/04/2021 to 2174/04/2021

Activities Planned To diagnose the problem

After watching videos on internet we


Activities Executed gathered data and then diagnosed the
issue of Pneumatic pipe.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D
Week no 23

18/04/2021 to 24/04/2021

To run the Pneumatic Vice.


Activities Planned

Activities Executed - With compressor starting we started


run the Pneumatic Vice

Reasons for any delay -


Corrective action taken

Remark and Signature of the guide Prof. Gaikwad S.G

Appendix D

MEETING NO- 8
REPORT WRITING
Activity Started on- 25/04/2021
Activity Ended on- 15/05/2021
Description: -
We again gathered for report writing. then we put together the data we researched on, then we
arranged the data according to the format of Maharashtra state board of technical education
website. Then we edited the data after that we prepared a soft copy of the report. we went
through the whole report and we were satisfied of our work and mailed it to the project guide.
they also went through the report and give their suggestion on project report data and asked
us the make few changes, we worked on the report and made improvements in the report as
they asked and mailed it to the guide again. They liked the work we did after that we mailed
it to the project coordinator. They also give their suggestion on the project report format and
they asked us to correct something, we worked on it to and mailed the final report to the
coordinator again and they finalized the Report.

Mr. Gaikwad S.G Mr. Maldhure S.S.


(Guide) (Co-ordinator)

Prof. M.W. Ingole


(H.O.D.)
Appendix D

24
Week No.
25/04/2021 to 01/05/2021

Activities Planned Report Writing

We again gathered for report writing.


Activities Executed then we put together the data we
researched on, then we arranged the
data according to the format of
Maharashtra state board of technical
education website. Then we edited the
data after that we prepared a soft copy
of the report.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof.Gaikwad S.G


Appendix D
265
Week No.
029/05/2021 to 1085/05/2021

Activities Planned Report Writing

Mailed the report to the project guide.


Activities Executed They went through the report and give
their suggestion on project report data
and asked us the make few changes,
we worked on the report and made
improvements in the report as they
asked and mailed it to the guide again.
They liked the work we did.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G


Week No
26
02/05/2021 to 08/05/2021

Activities Planned Report Writing

We mailed the report to the project


Activities Executed coordinator. They also give their
suggestion on the project report format
and they asked us to correct
something, we worked on it to and
mailed the final report to the
coordinator again and they finalized
the Report.

Reason for delay if any -

Corrective measure adopted -

Remark and Signature of the guide Prof. Gaikwad S.G