You are on page 1of 1

D/S U/S

CL OF BRIDGE PYLON 2 PIER 1 PYLON 2 PIER 1 PYLON 2 PIER 1


CL OF MAIN GIRDER CL OF MAIN GIRDER
35000 APPROACH BRIDGE
STEEL PLATE AT EJ APPROACH BRIDGE
2950 14550 14550 2950 APPROACH BRIDGE
LOCATION AFTER MAIN BRIDGE MAIN BRIDGE FRL= +32.600 m ON PIER CL
+32.600 m MAIN BRIDGE FRL= +32.600 m ON PIER CL
FRL= +32.880 m ON PIER CL RELEASING THE EJS +32.600 m
+30.05 m FOOTPATH FRL= +32.880 m ON PIER CL
FOOTPATH FOOTPATH

3200

2300

2300
+30.05 m
+28.75 m +30.05 m = = +30.05 m HANDRAIL
790 790
(TYP.)

1300
+28.00 m

1400
2300

2300
LADDER +28.00 m +28.00 m
TOP OF PLATFORM TOP OF PLATFORM TOP OF PLATFORM
OUTSIDE OF PIER

1200
1175 850 1175 OUTSIDE OF PIER OUTSIDE OF PIER

250
+28.00 m

2800

2800
TOP OF PLATFORM +26.85 m (D/S)
BRACKET OUTSIDE OF PIER
BRACKET BRACKET

600
+27.10 m (U/S)
BRACKET BRACKET TOP OF PLATFORM
INSIDE OF PIER

2800

2800

2800
BRACKET
450 450

2800

2800
2800

2800

2800
4200 24900 4200 MB250

2800

2800
(TYP.)

MB200

1500
(TYP.)

2800

2800

2800
750 800 1900 750

3000
MB250

2800

2800
MC250
(TYP.)
700 (x4000)

2000
HWL = +7.36 m H.W.L.

3000
2300

2300
1650 700 1650

1500
+6.10 m +6.10 m +6.10 m +6.10 m

300
900 900 900 3500
450 1800 450

4000

+0.00 m
500

+1.300 m +0.00 m K.O.D.S. +0.00 m K.O.D.S. +0.00 m K.O.D.S.


K.O.D.S.

1700 Ø 8600 1700

WELL Ø 12000 SECTION 2-2 SECTION 3-3 SECTION 4-4


ELEVATION / SECTION 1-1 HANDRAIL
POST

U/S 30060 (APPROACH BRIDGE) D/S


RCC WALL
480 14550 15030 480
STEEL PLATFORM AT
BEARING LEVEL INSIDE
1690 2280 2280 2280 2280 2280 1460 1460 2280 2280 2280 2280 2280 1690
THE DUCT FOR HANDLING
U/S 14550 14550 D/S OF BEARING 6 O/P CHQD. PL.

4
1500 4200 1500 1500 4200 1500
3000 MC150
CL. OF BEARING / GIRDER
400

1500

400 800 800 MB150


PLATFORM APPROACH PLATFORM

2875
300 POST DRILL
APPROACH INSERT

5
2600
3000 3000 3000 3000 3000 3000
2500

3000
1500
1000

1000
3300
4125

4125

1000
UP DN UP

PLATFORM PLATFORM
CUT-OUT CUT-OUT MC100
2750
3500

3500
850

PIER 1 PIER 1

5
CUT-OUT CUT-OUT
UP TYPICAL SECTION 5-5
4125

4125
3300

1000

1000
FOR PLATFORM
2500

DN

(SCALE-1:20)
POST DRILL
INSERT

2875
WALL TO BE DISMANTLED CL OF MIDDLE GIRDER
PYLON 2 MAIN BRIDGE PYLON 2
1500

FOR JACKING THE MAIN


400

2600
GIRDER & PROVIDING THE 1 TAG
1 3000
TEMPORARY BEARING MAIN BRIDGE 3000
2100 2100 2100 2100 1500 BELOW MAIN GIRDER HAND RAIL (TYP.) FOOTPATH
LINE

3
HAND RAIL (TYP.)

2
14550 14550 FOOTPATH LINE
CL OF MAIN GIRDER CL OF MAIN GIRDER

4
2950 14550 14550 2950
GROUND PLAN FOR PIER - 1
35000 (MAIN BRIDGE)

PLAN AT EL.+28.0M.