Professional Documents
Culture Documents
Section 3-3 Elevation / Section 1-1 Section 2-2 Section 4-4: U/S D/S
Section 3-3 Elevation / Section 1-1 Section 2-2 Section 4-4: U/S D/S
3200
2300
2300
+30.05 m
+28.75 m +30.05 m = = +30.05 m HANDRAIL
790 790
(TYP.)
1300
+28.00 m
1400
2300
2300
LADDER +28.00 m +28.00 m
TOP OF PLATFORM TOP OF PLATFORM TOP OF PLATFORM
OUTSIDE OF PIER
1200
1175 850 1175 OUTSIDE OF PIER OUTSIDE OF PIER
250
+28.00 m
2800
2800
TOP OF PLATFORM +26.85 m (D/S)
BRACKET OUTSIDE OF PIER
BRACKET BRACKET
600
+27.10 m (U/S)
BRACKET BRACKET TOP OF PLATFORM
INSIDE OF PIER
2800
2800
2800
BRACKET
450 450
2800
2800
2800
2800
2800
4200 24900 4200 MB250
2800
2800
(TYP.)
MB200
1500
(TYP.)
2800
2800
2800
750 800 1900 750
3000
MB250
2800
2800
MC250
(TYP.)
700 (x4000)
2000
HWL = +7.36 m H.W.L.
3000
2300
2300
1650 700 1650
1500
+6.10 m +6.10 m +6.10 m +6.10 m
300
900 900 900 3500
450 1800 450
4000
+0.00 m
500
4
1500 4200 1500 1500 4200 1500
3000 MC150
CL. OF BEARING / GIRDER
400
1500
2875
300 POST DRILL
APPROACH INSERT
5
2600
3000 3000 3000 3000 3000 3000
2500
3000
1500
1000
1000
3300
4125
4125
1000
UP DN UP
PLATFORM PLATFORM
CUT-OUT CUT-OUT MC100
2750
3500
3500
850
PIER 1 PIER 1
5
CUT-OUT CUT-OUT
UP TYPICAL SECTION 5-5
4125
4125
3300
1000
1000
FOR PLATFORM
2500
DN
(SCALE-1:20)
POST DRILL
INSERT
2875
WALL TO BE DISMANTLED CL OF MIDDLE GIRDER
PYLON 2 MAIN BRIDGE PYLON 2
1500
2600
GIRDER & PROVIDING THE 1 TAG
1 3000
TEMPORARY BEARING MAIN BRIDGE 3000
2100 2100 2100 2100 1500 BELOW MAIN GIRDER HAND RAIL (TYP.) FOOTPATH
LINE
3
HAND RAIL (TYP.)
2
14550 14550 FOOTPATH LINE
CL OF MAIN GIRDER CL OF MAIN GIRDER
4
2950 14550 14550 2950
GROUND PLAN FOR PIER - 1
35000 (MAIN BRIDGE)
PLAN AT EL.+28.0M.