You are on page 1of 3

THINK SAFE TRAINING AND MANAGEMENT CONSULTANCY SERVICES

SUITE 301 J & F DIVINO ARCADE, 961 AURORA BOULEVARD, QUIRINO DISTRICT, QUEZON CITY

BOSH SO2 COURSE OUTLINE


Day 1
Time Duration Topics Resource Person
AM
Registration
8:00 – 8:30 0.5
Pre-Test
Opening Ceremony
- Invocation
8:30 - 9:00 0.5 - National Anthem
- House Rules
- Welcome Message
Introductory Session: BOSH Framework
- Intro of participants / Expectations
9:00 - 10:00
1 - General course objectives
- Training design
10:00 – 10:15 0.25 Break
Module 1: Why the need for OSH?
A. OSH Situationer
B. Roles of Safety Officer
C. Intro to HIRAC (Overview of the Risk Assessment
10:15 - 12:00 1.75
as basis of training design)
D. Difference between Safety and Health Hazards
E. Unsafe Acts and Unsafe Conditions
12:00 – 1:00 1 Lunch Break
PM
Module 2: Workplace Risk Assessment
1 – Hazards Identification
A: Hazards Identification - Safety Hazards
1. Hazards due to poor housekeeping
1:00 - 3:30 2.5
2. Fire hazards
3. Electrical hazards
4. Machine hazards
5. Hazards from improper materials handling
3:30 - 3:45 0.25 Break
Module 2 | 1 – B: Hazards Identification - Health
Hazards (Industrial Hygiene)
1. Physical
3:45 - 5:00 1.25 2. Chemical
3. Biological
4. Ergonomics
Day 2 –

Time Duration Topic Resource Person


AM
8:00 - 8:15 0.25 Unfreezing Activity
Review
8:15 – 10:15 2 WORKSHOP 1: Hazards Identification
(based on video)
10:15 – 10:30 0.25 Break
Module 2 | 2 – Evaluation of Risks and Hazards
1.5
10:30 – 12:00 A: Work Environment Measurement

12:00 – 1:00 1 Lunch Break

PM
1:00 – 3:15 2.25 Module 2 | 2 – B: Medical Surveillance
- Biological Monitoring
3:15 – 3:30 0.25 Break
Module 2 | 2 – C: Workplace Risk Assessment
3:30 - 5:00 1.5 WORKSHOP 2: Risk Assessment
(Continuation of Workshop 1)

Day 3 –
Time Duration Topics Resource Person
AM
8:00 - 8:15 0.25 Unfreezing Activity
Module 2 | 3 – Development of Control Measures
8:15 - 10:00 1.75 A: Control Measures of Health Hazards
- Engineering
- Administrative
- PPE
10:00 - 10:15 0.25 Break
Module 2 | 3 – B: Control Measures of Safety Hazards
10:15 - 12:00 1.75 (with JHA)
- Engineering
- Administrative
- PPE
PM
12:00 - 1:00 1 Lunch Break
1:00 - 2:00 WORKSHOP 3: Control Measures
1
(Continuation of Workshops 1-2)
2:00 - 5:00 Module 3: Accident Causation: Risky Workplace and
2.75
Risky Workers | Accident Investigation
(including F. Accident Causation review
0.25
break – G. Dangerous Occurrences, Imminent Danger,
15 mins) Work Stoppage Order
H. Accident Investigation (computation of
FR/SR; accident documentation to EC
logbook)
THINK SAFE TRAINING AND MANAGEMENT CONSULTANCY SERVICES
SUITE 301 J & F DIVINO ARCADE, 961 AURORA BOULEVARD, QUIRINO DISTRICT, QUEZON CITY

Day 4 –

Time Duration Topics Resource Person


AM
8:00 - 8:30 0.5 Unfreezing Activity / Review
8:30 - 12:00 3.25 Module 4: Integrating Activity
- Conduct of OSH Inspection (Video)
(including 0.25 - Workshop on HIRAC
break – - Presentation of workshop output
15 mins) - Analysis and Feedback
PM
12:00 - 1:00 Lunch Break
Module 5: Communicating OSH
1:00 - 3:00 - Training of Trainers
2
- Facilitation of Toolbox Meetings and OSH
Committee Meetings
3:00 - 3:15 0.25 Break
3:15 - 5:00 Module 6: Responses to OSH Issues and Concerns
1.75
1 – Workplace Emergency Preparedness

Day 5 –

Time Duration Topics Resource Person


AM
8:00 - 8:30 0.5 Unfreezing Activity / Review
8:30 - 10:00 1.5 Module 6 | 2 – Employees Compensation Program
10:00 - 10:15 0.25 Break
Module 6 | 3 – OSH Legislations (RA 11058, DO 198-18,
10:15 - 12:00 1.75
other OSH issuances, Rule 1960, rights of workers)
PM
12:00 - 1:00 Lunch Break
Module 6 | 4 – OSH Program Development
1:00 - 2:30 I. OSH Program Template
1.5
J. OSH Program Development workshop with DOLE
reportorial requirements
2:30 – 3:30 1.0 Special Module: COVID-19 and the Workplace
3:30 - 3:45 0.25 Break
Post Test
3:45 - 5:00 1.25 Re-entry Planning
OSH Realizations and Learnings
General Evaluation
Closing

You might also like