REINFORCING BARS

< CHECKLIST >


PROJECT NAME : Inspection Date :
LOCATION : Attached Drawing Reference:
CLIENT : Drawing Number:
CONTRACTOR : Total Pages:

Pre-Inspection Final-inspection
Checked
Item # CHECKLIST DESCRIPTION Checked Method Contractor o Pre - Acceptance o Final - Acceptance
Submittals
Corrective Action
Pass Fail Pass Fail DUE DATE
Plan | Remarks

A. REINFORCING BARS

A1. Bars are not misbent or damaged Visual/ Verify o o o o o

Bars are free of dirt, loose mill scale, heavy rust,


A2. Visual/ Verify o o o o o
grease, or other deleterious materials

A3. Bar identifications are intact and legible Visual/ Verify o o o o o

A4. After placing reinforcing bar:

Bars are free of loose mortar, rust, grease, or


A4.1 Visual/ Verify o o o o o
other substance capable of destroying bond

Rebar type, size, fabrication, and positioning Visual/ Verify/


A4.2 o o o o o
in accordance with the drawing Measurement

Visual/ Verify/
A4.3 Total Quantity of rebars per schedule o o o o o
Measurement
Minimum clearance distance between bars is equal
Visual/ Verify/
A4.4 to nominal diameter of bar but not less than 1 o o o o o
Measurement
inch

For parallel bars in layer or mats, the minimum


Visual/ Verify/
A4.5 clear distance bet. layers is equal to the diam. o o o o o
Measurement
of the bar but not less than 1 inch

Lap length of splices is according to Visual/ Verify/


A4.6 o o o o o
specifications Measurement
Cover of bars meet or exceeds the minimum Visual/ Verify/
A4.7 o o o o o
requirements Measurement

Visual/ Verify/
A4.8 Reinforcement is adequately supported o o o o o
Measurement

Field bending or straightening of rebars is done Visual/ Verify/


A4.9 o o o o o
in accordance with the specification Measurement

Rebent or straightened bars are free of cracks Visual/ Verify/


A4.10 o o o o o
or damage Measurement

B. OTHERS

Review/ Verify/
Check Structural Designer Approved Rebar Cutting List/
B.1 Record o o o o o
Schedule
Measurement
Review/ Verify/
Check Approved attached i.e. Sketches, MS, Materials,
B.2 Record o o o o o
FCD's, Standard Codes, & Specs, Shop drawings, etc..
Measurement
Reason if not accepted: 'Solution for rectification | General Notes, Comments and

o Pre- Inspection: o Final Inspection: o Approved o Disapproved with Comments

Requested by: Contractor Inspected by: Approved by:

QA/QC Engineer
Signature: Signature: Signature:
Date: Date: Date: