What Is Flue Gas Desulphurization? Process used to remove Sulfur Dioxide (SO2) gas prior to release of furnace emissions to the atmosphere The process is accomplished by using wet limestone FGD Scrubber technology gy
FGD systems are commonly installed on coal fired power plants Wet FGD Scrubber technology can also be applied to Refineries, Pulp Mills, and various other industries
Gypsum
Waste Water
Think of SO2 as excess stomach acid We take anti-acids to neutralize the acid A scrubber uses limestone as the neutralizer!
Gas flow
Where to install Crane Energy Valves e.g. RS Butterfly Valves in the FGD Process
Where to install
(Process systems, no gas systems)
CenterLine RS Saunders KB XOMOX 108G HP butterfly valve MS And ball valves Total circa 300 650 different kind of valves
10
CRANE Butterfly Valves and Diaphragm Valves in FGD Black Box Washer/ Scrubber " " Gypsum treatment Water treatment Air systems y Heating system Medium Wash suspension Process water Oxidation Gypsum (fluid) Waste water Air Water, air Type of valve RS, IDV RS IDV RS, IDV, R 201 RS, MS, 108G RS IDV RS, RS, IDV, R 201 IDV, , KV RS, MS, 108G, KV
108G = Xomox Lined Butterfly Valve R201 = Xomox Lined Ball Valve KV = Xomox Ball Valve
11
Requirements of valves for operation in Flue Gas Desulphurization plants - Corrosion C i & Abrasion Ab i -
12
Requirements high reliability protection against corrosion protection against p g abrasion absolute and permanent tight shut-off Why risk Wh i k of f corrosion? i ? high chloride contents, a low ph-value, fluorides and operating temperatures of more than 40C (104F) Why risk of abrasion? high contents of solid particles in form of calcium hydroxide or limestone in the media.
14
Requirements Why y risk of corrosion? Corrosion originates from FGD process conditions: Chloride concentration ph values ph-values Fluorides Temperatures up to 100,000 ppm 1 ... 6 0 ... 500 ppm > 45 45 C ... < 72 72 C (>113 F .<162 F)
15
Requirements Why risk of abrasion? Abrasion originates from FGD process conditions: Solid particles (Calcium Hydroxyd) Operating pressures Velocities up to 50 % 2 ... 8 bar (29 116 psi) 2.3 m/s ... 3.5 m/s (7 5 f/s11.5 (7.5 f/ 11 5 f/ f/s) )
16
Requirements How to construct a butterfly valve in order to guarantee best protection against corrosion? a) ) the th best b t possible ibl use of f materials t i l b) minimizing number of wetted parts c) avoidance of pitting corrosion, contact corrosion and stress corrosion
17
Requirements Are these conditions fulfilled by CRANE CenterLine RS ? a) best possible use of materials Disc material: Hastelloy, Superduplex, Hostalen GUR Lining material: EPDM (CSM)
18
Requirements Are these conditions fulfilled by CRANE CenterLine RS ? b) low number of wetted parts The CenterLine RS butterfly valve has only two wetted parts
19
Requirements Are these conditions fulfilled by CRANE CenterLine RS ? c) avoidance of pitting corrosion Quality of disc surface according to DIN S3 eq. MSS (means smooth surface) or better Materials with hi h molybdenum high l bd content t t
20
Requirements Are these conditions fulfilled by CRANE CenterLine RS ? d) avoidance of contact corrosion minimizing metal-to-metal contact points. no use of pins or screws for connecting disc/shaft.
21
Requirements Are these conditions fulfilled by CRANE CenterLine RS ? e) "floating" disc Prevention of wear; Eliminates formation of deposits between disc and li i due lining d to t the th self lf centering t i disc di (no ( pins). i ) = Even compression on the entire disc sealing surface
22
Different kinds of corrosion in FGD plants Valves V l d i and design d selection l i of f materials i l have h to be b chosen, to prevent: Pitting corrosion Contact corrosion Stress corrosion
23
Different kinds of corrosion in FGD plants Pitting corrosion Pitting corrosion is the most dangerous type of corrosion and requires high-quality high quality materials. materials
Deposits on disc The protective passive layer is not renewed. Pitting corrosion can spread. Actions to be taken: Selection of a cast material with high chrome and molybdenum content & high quality disc surface CRANE uses Superduplex S d l or Hastelloy.
24
Needle
Cavity
Different kinds of corrosion in FGD plants Contact corrosion Contact corrosion is one of the most frequent types of corrosion. It occurs when connecting different components as well as at screwed connections, washers, etc.
Action to be taken: Avoidance of gaps, sealings, etc. Due to the internal power connection between disc and shaft, this type of corrosion does not affect the C t Li RS. CenterLine
25
Crevice corrosion
Corrosion
Fi ld Experience Field E i
26
Superduplex and Hastelloy in FGD Service Corrosion Public literature Pitti f Pitting factor t (P (P.F.) F ) of f di disc materials t i l used di in CenterLine RS
P.F. = % Cr + 3,3x (% Mo + 0,5% W) + 2x %Co + 16 x %N
Cr % 25.00 21.35
Mo % 4.00 13.67
W % 0.00 2.84
Cu % 0.30 0.00
N % 0.27 0.00
27
Corrosion
Public literature says: Pitting g factor is a function of p pH-value and Chloride level
1000 34 35 40 45
50 to 65C 65 C (122 (122 F - 149 149 F) Materials for FGD- and Denox-Installations
28
29
Hostalen GUR, a trend setting material ! Alternative disc material for Slurries With washing temperatures of more than 60 C (140F) and a ph-value ph value of < 3 3, metal cast materials turn out to be unsuitable very soon picture Chloride concentrations up p to 100,000 , ppm pp are possible. p An additional fluoride share of > 50 ppm reduces the lifetime of valves many times.
30
Hostalen GUR, a trend setting material ! Installation of Hastelloy disc in a FGD system with pH-value 2.5 causes in a strong corrosion after a short service time.
31
Hostalen GUR, a excellent material ! Alt Alternative ti material t i lf for slurries l i Especially at lignite coal-fired power plants, medium t temperatures t are at t 68 C (155F) , th the ph-value h l i is l less than 3.5; Chloride contents of more than 55 55,000 000 ppm and fluorides of up to 500 ppm are normal here. Gas cleaning plants for copper plants and for the cement industry operate with high acid concentrations and low phvalues.
32
Hostalen GUR, a excellent material ! Alternative material for slurries Advantages of Hostalen GUR compressed disc Butterfly valves: no danger of corrosion, no wear, no abrasion suitable for p ph = 0 temperature up to 80 C (+176F) Competitive Valve solution vs High Alloy materials e.g. Hastelloy etc. material surcharges
Example: NPS 40/#150 cost of Valve with Hostalen Gur, app. 40% cheaper than same Valve V l with ith H Hastelloy t ll C22 di disc i incl. l surcharges h
33
34
35
36
37
38
Face to face:
Features
Low price Low freight charges Low installation costs Reduced footprint Easy E operation ti Simple conversion from manual to automatic operation Positive shut off
40
41
42
CenterLine RS Series Butterfly Valves Features 1. Cartridge seat design with solid backup ring
Secures seat in position Eliminates seat distortion Minimizes stresses on rubber seat for longer life Suitable for vacuum service Easier to assemble and dismantle
43
44
Even compression p around disc and at disc bosses C t ll d stresses Controlled t Reduced wear Excellent shut off performance
45
Maintenance friendly Easy assembly due to solid cartridge seat No pins - interlocking assembly Body, shaft and bushing do not contact the process medium Self lubricating bushings result in lower torques
46
g Seat (rubber ( liner) ) Cartridge Disc Service life 2.5x longer vs boot seat
47
CenterLine RS Series Butterfly Valves Features eatu es 6. ISO top flange / square shaft
Direct mounting of actuation possible Easy change of operators
48
References
50
Enduser
Country
Location/Project
Contractor
Market segment
CLRS
Products
FSMS Revo
Continent
(Enduser)
Electrabel
Belgium Blast Furnace,Unit 2 FGD Belledune FGD Beijing FDG Banshan FGD Chongqing gq g FGD Guang An,Sichuan FGD Jiangyin;Jiangsu FGD GuiZhou YaXi FGD XuZhou FGD Guang Zhou FGD JianBi FGD Ligang Ligang,Jiangsu Jiangsu FGD Changzhou,Jiangsu Lurgi Lentjes Bischoff / Ferrostahl Preussag Noell Steinmller Steinmller Steinmller
X X X X X X X X X X X X X
Beijing First Cogeneration China Banshan Power Plant Chongqing gq g Power Plant Guang Power Plant Huaiyin Power Plant GuiZhou YaXi Power Plant XuZhou Huaxin Power Plant HuangPu Power Plant JianBi Power Plant Ligang Power Plant Changzhou Power Plant China China China China China China China China China China
Beijing Guohua Ebara (LLB) Power Beijing Boqi (AE+E) Shandong Sanrong Wuhan Kaidi Shanghai Longking Env. Energy & Environment Beijing Longyuan (L&C S) Beijing Longyuan (L&C S) Power Power Power Power Power Power Power
51
Enduser
CEZ CEZ Elektrarna Milnik Elkraft Elkraft Fynsvrket Imatran Voima Oy Imatran Voima Oy E ON ( Preussen Elektra ) E ON ( VKR ) RWE STEAG EnBW Vattenfall Europe Generation ( VEAG ) Vattenfall Europe Generation ( VEAG ) RWE RWE
Country
Czech Republic Czech Republic Czech Republic Denmark Denmark Denmark Finland Finland Germany Germany Germany Germany Germany Germany Germany Germany Germany
Location/Project
FGD Pocerady FGD Prunerov FGD Milnik FGD Amager Block Section 3
Contractor
Lurgi AG Lurgi Lentjes Bischoff ABB Babcock Anlagen
Market segment
CLRS
Power Power Power Power Power Power Power Power Power Power Power Power Power Power Power Power Power X
Products
FSMS Revo
Continent
(Enduser)
X X X
FGD Aesnes Block Section 5 Flaekt FGD Odense Block Section 7 Flaekt FGD Meri Pori FGD Inkoo FGD Staudinger, Rostock and others FGD Scholven and others FGD Frimmersdorf FGD Herne,Lnen and others FGD Mannheim and Heilbronn FGD Lippendorf FGD Boxberg,Schwarze Pumpe FDG Weisweiler FGD Ibbenbren Lurgi Lentjes Bischoff L&C Steinmller Lurgi Lentjes Bischoff Thyssen Eng. Lurgi Lentjes Bischoff Babcock Anlagen Babcock Anlagen Lurgi Lentjes Bischoff Preussag Noell Babcock Anlagen Thyssen Eng.
X X X
X X X X
X X X X X X X X X X X X X X
X X
52
Enduser
Country
Greece
Location/Project
FGD Megalopolis FGD Paiton FGD Tangjin gj ,Units 1 - 4 FGD Hadong and TAEN FGD Borselle FGD Siarkopol FGD Jaworzno 3 FGD Opole Block Section 14 FGD Madinat Yanbu AlSinaiyah Steam Power Plant Unit 4 FGD Taichung FGD Yeniky ,Units 1 & 2
Contractor
Preussag Noell Lurgi Lentjes Bischoff Samwhan Corp. p Babcock Wilcox E.P.Z. Saarberg-Hlter L&C Steinmller / Rafako Saarberg-Hlter Lurgi Lentjes Bischoff Black + Veatech Lurgi Lentjes Bischoff
Market segment
CLRS
Power Power Power Power Power Power Power Power Power Power Power X X X X X X X X X X
Products
FSMS Revo
Continent
(Enduser)
Paiton Private Power Kepco ( Korean Electric Power Corp ) Kepco ( Korean Electric Power Corp ) E.P.Z. Borselle Kopaolnie i Zaklady Przetworcze Siarki
Elektrownia Opole Kingdom of Saudi Arabia Royal Commission for Jubail and Yanbu Taiwan Power
FGD Yatagan
Power X
TEAS ( Turkiye Elektrik AS Turkey TEAS ( Turkiye Elektrik AS National Power Power Gen Southern Indiana G&E Sigeco Turkey UK UK USA USA
FGD Cayhiran FGD Orhaneli Drax Ratcliffe FGD Culley Station FGD Birlik Um Pirdop
Lurgi Lentjes Bischoff Babcock Borsig Power Babcock Wilcox John Brown Babcock Wilcox Steuler Lurgi Lentjes Bischoff
X X X X X X X X
53
Pictures of Installation
54
RS Butterfly Valves, NPS 32 during shut down for inspection of the scrubber in Power Station Wilhelmshaven, EON in 1997
RS Butterfly Valve during shut down. View from inside scrubber to pump recycling valve in Power Station Hafen, Stdw. Bremen in 1999
RS Butterfly Valves, NPS 32 in Power Station Ibbenbren, RWE in 1994 after pump discharge
RS Butterfly Valves, NPS 48 in Power Station Weisweiler, RWE in 1993 after 10 years in service. Babcock system with scrubber
RS Butterfly Valves, NPS 48 in Power Station Weisweiler, RWE in 1993 after 10 years in service.
RS Butterfly Valves, NPS 48 in Power Station Weisweiler, RWE in 1993 after 10 years in service. Typical abrasion of pump impeller
RS Butterfly Valves, NPS 48 in Power Station Weisweiler, RWE in 1993 after 10 years in service.
RS Butterfly Valves, NPS 48 in Power Station Weisweiler, RWE in 1993 after 10 years in service.
Our competition..
64
RubberRubber -lined disc Why no rubber rubber-lined disc? Rubber lined discs (hard rubber) are ineffective in this WFGD Rubber-lined service. Why y does CRANE Energy gy not offer this option? p
65
Why no rubber rubber-lined disc? Rubber-lined Rubber lined discs have the following disadvantages: when the valve is closed, disc and rubber lining can stick together (temperature) a rubber-lined disc is not resistant against penetration of slurry corrosion damages of the disc surface are the reason for its rapid deterioration. deterioration
66
67
68
Competitive situation There are some differences between the design of the CenterLine RS butterfly valve and that of competitors. These are as follows: two-part body disc-shaft connection with pins or screws body lining as a loose part (a simple "rubber ring" without support)
69
70
Worldwide among the "Top Top Five Five" Number #2 in Europe L Long-term t experience i since i 1978 Flue gas cleaning plants are our center of excellence (FGD, FGC, copper plants etc.). , CRANE Energy gy feels at home and can offer Here, comprehensive expertise.
71
72