Transmittal cover letter

TRANSMITTAL DETAILS SENDER


Project: Devonport 10 Dock CDE Company: KierBam (KBJV)
Project number: BKJ.0040 Issued by: Leah McCarthy
Transmittal ID: BKJ.0040-TR-0000118 Email: leah.mccarthy@bam.com
Subject: AECOM Building A Documents
Purpose: For Information
Classification: KierBAM - Contractor - Designer
Issue date: 2023 December 13 2:02 PM
Acknowledge due date: 2023 December 14 2:02 PM (UTC+00:00)
Response due date: -

COMMENTS
Good Afternoon,

Rod Courts has asked that I send you the documents detailed. These are the documents that we have for AECOM Building A

Regards

RECIPIENTS
Recipient name Response required Comments Company Recipient title Email
cookster143@icloud.com NO cookster143@icloud.com

DOCUMENTS
Item no. File name Version State Description File path
1 10DOCK-ACM-10DBA-01-DR-E- P04 Work in Progress Building A 1st Floor Primary Containment /10DOCK-ACM-10DBA-01-DR-E-61D001.pdf
10DOCK-ACM-10DBA-01-DR-E-
61D001.pdf
2 P04 Work in Progress Building A First Floor Small Power Layout /10DOCK-ACM-10DBA-01-DR-E-62D001.pdf
62D001.pdf
3 10DOCK-ACM-10DBA-01-DR-E- P04 Work in Progress Building A First Floor Lighting Layout /10DOCK-ACM-10DBA-01-DR-E-63D001.pdf
4 10DOCK-ACM-10DBA-01-DR-E-
63D001.pdf P04 Work in Progress Building A First Floor Fire Alarm Layout /10DOCK-ACM-10DBA-01-DR-E-67D001.pdf
67D001.pdf
10DOCK-ACM-10DBA-01-DR-E- Building A First Floor Security Systems
5 P04 Work in Progress /10DOCK-ACM-10DBA-01-DR-E-68D001.pdf
68D001.pdf Layout
10DOCK-ACM-10DBA-01-DR-M- Building A First Floor Heating and Cooling
6 P04 Work in Progress /10DOCK-ACM-10DBA-01-DR-M-56D001.pdf
56D001.pdf Layout
7 10DOCK-ACM-10DBA-01-DR-M- P04 Work in Progress Building A First Floor Ventilation Layout /10DOCK-ACM-10DBA-01-DR-M-57D001.pdf
57D001.pdf
10DOCK-ACM-10DBA-01-DR-M- Building A First Floor Fire Protection
8 P04 Work in Progress /10DOCK-ACM-10DBA-01-DR-M-58D001.pdf
58D001.pdf Layout
10DOCK-ACM-10DBA-01-DR-P- Building A First Floor Above Ground
9 P04 Work in Progress /10DOCK-ACM-10DBA-01-DR-P-52D001.pdf
52D001.pdf Drainage Layout
10DOCK-ACM-10DBA-01-DR-P- Building A First Floor Water Services
10 P04 Work in Progress /10DOCK-ACM-10DBA-01-DR-P-53D001.pdf
53D001.pdf Layout
11 10DOCK-ACM-10DBA-01-DR-S- Work in Progress Building A First Floor Layout P01 /10DOCK-ACM-10DBA-01-DR-S-20D001.pdf
20D001.pdf
10DOCK-ACM-10DBA-02-DR-E- Building A Second Floor Primary
12 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-E-61D001.pdf
61D001.pdf Containment
10DOCK-ACM-10DBA-02-DR-E- Building A Second Floor Small Power
13 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-E-62D001.pdf
62D001.pdf Layout
14 10DOCK-ACM-10DBA-02-DR-E- P04 Work in Progress Building A Second Floor Lighting Layout /10DOCK-ACM-10DBA-02-DR-E-63D001.pdf
63D001.pdf
10DOCK-ACM-10DBA-02-DR-E- Building A Second Floor Fire Alarm
15 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-E-67D001.pdf
67D001.pdf Layout
10DOCK-ACM-10DBA-02-DR-M- Building A Second Floor Heating and
16 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-M-56D001.pdf
56D001.pdf Cooling Layout
10DOCK-ACM-10DBA-02-DR-M- Building A Second Floor Ventilation
17 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-M-57D001.pdf
57D001.pdf Layout
10DOCK-ACM-10DBA-02-DR-M- Building A Second Floor Fire Protection
18 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-M-58D001.pdf
58D001.pdf Layout
10DOCK-ACM-10DBA-02-DR-P- Building A Second Floor Above Ground
19 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-P-52D001.pdf
52D001.pdf Drainage Layout
10DOCK-ACM-10DBA-02-DR-P- Building A Second Floor Water Services
20 P04 Work in Progress /10DOCK-ACM-10DBA-02-DR-P-53D001.pdf
53D001.pdf Layout
21 10DOCK-ACM-10DBA-02-DR-S- Work in Progress Building A Second Floor Layout P01 /10DOCK-ACM-10DBA-02-DR-S-20D001.pdf
10DOCK-ACM-10DBA-03-DR-E-
20D001.pdf Building A Third Floor Primary
22 P04 Work in Progress /10DOCK-ACM-10DBA-03-DR-E-61D001.pdf
61D001.pdf Containment
10DOCK-ACM-10DBA-03-DR-E-
23 P04 Work in Progress Building A Third Floor Small Power Layout /10DOCK-ACM-10DBA-03-DR-E-62D001.pdf
62D001.pdf
24 10DOCK-ACM-10DBA-03-DR-E- P04 Work in Progress Building A Third Floor Lighting Layout /10DOCK-ACM-10DBA-03-DR-E-63D001.pdf
25 10DOCK-ACM-10DBA-03-DR-E-
63D001.pdf P04 Work in Progress Building A Third Floor Fire Alarm Layout /10DOCK-ACM-10DBA-03-DR-E-67D001.pdf
67D001.pdf
10DOCK-ACM-10DBA-03-DR-E- Building A Third Floor Security Systems
26 P04 Work in Progress /10DOCK-ACM-10DBA-03-DR-E-68D001.pdf
68D001.pdf Layout
10DOCK-ACM-10DBA-03-DR-M- Building A Third Floor Heating and
27 P04 Work in Progress /10DOCK-ACM-10DBA-03-DR-M-56D001.pdf
56D001.pdf Cooling Layout
28 10DOCK-ACM-10DBA-03-DR-M- P04 Work in Progress Building A Third Floor Ventilation Layout /10DOCK-ACM-10DBA-03-DR-M-57D001.pdf
57D001.pdf
10DOCK-ACM-10DBA-03-DR-M- Building A Third Floor Fire Protection
29 P04 Work in Progress /10DOCK-ACM-10DBA-03-DR-M-58D001.pdf
58D001.pdf Layout
10DOCK-ACM-10DBA-03-DR-P- Building A Third Floor Above Ground
30 P04 Work in Progress /10DOCK-ACM-10DBA-03-DR-P-52D001.pdf
52D001.pdf Drainage Layout
10DOCK-ACM-10DBA-03-DR-P- Building A Third Floor Water Services
31 P01.02 Work in Progress /10DOCK-ACM-10DBA-03-DR-P-53D001.pdf
53D001.pdf Layout
32 10DOCK-ACM-10DBA-03-DR-S-20S001.pdf Work in Progress Buliding A Third Floor Layout P01 /10DOCK-ACM-10DBA-03-DR-S-20S001.pdf
33 10DOCK-ACM-10DBA-F1-DR-S- Work in Progress Building A Foundation Layout P01 /10DOCK-ACM-10DBA-F1-DR-S-10D001.pdf
34 10DOCK-ACM-10DBA-F1-DR-S-
10D001.pdf Work in Progress Building A Substructure Details P01 /10DOCK-ACM-10DBA-F1-DR-S-10D002.pdf
35 10D002.pdf
10DOCK-ACM-10DBA-F1-DR-S- Work in Progress Building A Pile Layout & Schedule P01 /10DOCK-ACM-10DBA-F1-DR-S-17D001.pdf
17D001.pdf
10DOCK-ACM-10DBA-GF-DR-E- Building A Ground Floor Primary
36 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-E-61D001.pdf
61D001.pdf Containment
10DOCK-ACM-10DBA-GF-DR-E-
37 Work in Progress /10DOCK-ACM-10DBA-GF-DR-E-61D001.xfdf
61D001.xfdf
10DOCK-ACM-10DBA-GF-DR-E- Building A Ground Floor Small Power
38 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-E-62D001.pdf
62D001.pdf Layout
10DOCK-ACM-10DBA-GF-DR-E-
39 P04 Work in Progress Building A Ground Floor Lighting Layout /10DOCK-ACM-10DBA-GF-DR-E-63D001.pdf
63D001.pdf
10DOCK-ACM-10DBA-GF-DR-E- Building A Ground Floor Fire Alarm
40 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-E-67D001.pdf
67D001.pdf Layout
10DOCK-ACM-10DBA-GF-DR-E- Building A Ground Floor Security Systems
41 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-E-68D001.pdf
68D001.pdf Layout
10DOCK-ACM-10DBA-GF-DR-M- Building A Ground Floor Heating and
42 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-M-56D001.pdf
56D001.pdf Cooling Layout
10DOCK-ACM-10DBA-GF-DR-M- Building A Ground Floor Ventilation
43 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-M-57D001.pdf
57D001.pdf Layout
10DOCK-ACM-10DBA-GF-DR-M- Building A Gound Floor Fire Protection
44 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-M-58D001.pdf
58D001.pdf Layout
10DOCK-ACM-10DBA-GF-DR-P- Building A Ground Floor Above Ground
45 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-P-52D001.pdf
52D001.pdf Drainage Layout
10DOCK-ACM-10DBA-GF-DR-P- Building A Ground Floor Water Services
46 P04 Work in Progress /10DOCK-ACM-10DBA-GF-DR-P-53D001.pdf
53D001.pdf Layout
10DOCK-ACM-10DBA-R1-DR-E- Building A Roof Level Earthing and
47 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-E-60D001.pdf
60D001.pdf Lightning Protection Layout
10DOCK-ACM-10DBA-R1-DR-E- Building A Roof Level Primary
48 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-E-61D001.pdf
61D001.pdf Containment
10DOCK-ACM-10DBA-R1-DR-E-
49 P04 Work in Progress Building A Roof Level Small Power Layout /10DOCK-ACM-10DBA-R1-DR-E-62D001.pdf
62D001.pdf
50 10DOCK-ACM-10DBA-R1-DR-E- P04 Work in Progress Building A Roof Level Lighting Layout /10DOCK-ACM-10DBA-R1-DR-E-63D001.pdf
51 63D001.pdf
10DOCK-ACM-10DBA-R1-DR-E- P04 Work in Progress Building A Roof Level Fire Alarm Layout /10DOCK-ACM-10DBA-R1-DR-E-67D001.pdf
67D001.pdf
10DOCK-ACM-10DBA-R1-DR-E- Building A Roof Level Security Systems
52 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-E-68D001.pdf
68D001.pdf Layout
10DOCK-ACM-10DBA-R1-DR-M- Building A Roof Level Heating and
53 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-M-56D001.pdf
56D001.pdf Cooling Layout
10DOCK-ACM-10DBA-R1-DR-M-
54 P04 Work in Progress Building A Roof Level Ventilation Layout /10DOCK-ACM-10DBA-R1-DR-M-57D001.pdf
57D001.pdf
10DOCK-ACM-10DBA-R1-DR-M- Buidling A Roof Level Fire Protection
55 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-M-58D001.pdf
58D001.pdf Layout
10DOCK-ACM-10DBA-R1-DR-P- Building A Roof Level Above Ground
56 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-P-52D001.pdf
52D001.pdf Drainage Layout
10DOCK-ACM-10DBA-R1-DR-P- Building A Roof Level Water Services
57 P04 Work in Progress /10DOCK-ACM-10DBA-R1-DR-P-53D001.pdf
53D001.pdf Layout
10DOCK-ACM-10DBA-XX-DP-PM-
58 Work in Progress BIM Execution Plan Builidings /10DOCK-ACM-10DBA-XX-DP-PM-00D002.pdf
00D002.pdf
10DOCK-ACM-10DBA-XX-DR-E- Building A & B 400V LV Schematic -
59 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-E-61D001.pdf
61D001.pdf Sheet 1
10DOCK-ACM-10DBA-XX-DR-E- Building A & B 400V LV Schematic -
60 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-E-61D002.pdf
61D002.pdf Sheet 2
10DOCK-ACM-10DBA-XX-DR-E- Building A & B General Earthing
61 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-E-61D003.pdf
61D003.pdf Schematic
10DOCK-ACM-10DBA-XX-DR-E- Building A & B General and Emergency
62 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-E-63D001.pdf
63D001.pdf Lighting Schematic
63 10DOCK-ACM-10DBA-XX-DR-E- P04 Work in Progress Building A & B Voice & Data Schematic /10DOCK-ACM-10DBA-XX-DR-E-64D001.pdf
64 64D001.pdf
10DOCK-ACM-10DBA-XX-DR-E- P04 Work in Progress Building A & B Fire Alarm Schematic /10DOCK-ACM-10DBA-XX-DR-E-67D001.pdf
67D001.pdf
10DOCK-ACM-10DBA-XX-DR-E- Building A & B Fire Alarm Cause & Effect
65 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-E-67D002.pdf
67D002.pdf Schedule
10DOCK-ACM-10DBA-XX-DR-E- Building A & B General Security
66 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-E-68D001.pdf
68D001.pdf Schematic
67 10DOCK-ACM-10DBA-XX-DR-M- P04 Work in Progress Building A VRF/ DX Cooling Schematic /10DOCK-ACM-10DBA-XX-DR-M-55D001.pdf
68 10DOCK-ACM-10DBA-XX-DR-M-
55D001.pdf P04 Work in Progress Building A Chilled Water Schematic /10DOCK-ACM-10DBA-XX-DR-M-55D002.pdf
69 10DOCK-ACM-10DBA-XX-DR-M-
55D002.pdf P04 Work in Progress Building A LTHW Schematic /10DOCK-ACM-10DBA-XX-DR-M-56D001.pdf
56D001.pdf
10DOCK-ACM-10DBA-XX-DR-M- Building A&B Heating & Cooling Services
70 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-M-56D002.pdf
56D002.pdf Typical Details
71 10DOCK-ACM-10DBA-XX-DR-M- P04 Work in Progress Building A Ventilation Schematic /10DOCK-ACM-10DBA-XX-DR-M-57D001.pdf
72 10DOCK-ACM-10DBA-XX-DR-M-
57D001.pdf P04 Work in Progress Building A Typical Dry Riser Schematic /10DOCK-ACM-10DBA-XX-DR-M-58D001.pdf
10DOCK-ACM-10DBA-XX-DR-P-
58D001.pdf Building A Above Ground Drainage
73 P04 Work in Progress /10DOCK-ACM-10DBA-XX-DR-P-52D001.pdf
52D001.pdf Schematic
74 10DOCK-ACM-10DBA-XX-DR-P- P04 Work in Progress Building A Water Services Schematic /10DOCK-ACM-10DBA-XX-DR-P-53D001.pdf
75 10DOCK-ACM-10DBA-XX-DR-S-
53D001.pdf Work in Progress Building A General Notes P01 /10DOCK-ACM-10DBA-XX-DR-S-00D001.pdf
76 00D001.pdf
10DOCK-ACM-10DBA-XX-DR-S- Work in Progress Buidling A Structural Drawing Index P01 /10DOCK-ACM-10DBA-XX-DR-S-00D002.pdf
77 00D002.pdf
10DOCK-ACM-10DBA-XX-IF-A-00D001.ifc P01.01 Work in Progress BUILDING A - INTERNAL BUILD UP /10DOCK-ACM-10DBA-XX-IF-A-00D001.ifc
BUILDING A - EXTERNAL ENVELOPE
78 10DOCK-ACM-10DBA-XX-IF-A-00D002.ifc P01.01 Work in Progress /10DOCK-ACM-10DBA-XX-IF-A-00D002.ifc
BUILD UP
79 10DOCK-ACM-10DBA-XX-IF-A-00D003.ifc P01.01 Work in Progress BUILDING A - FF&E /10DOCK-ACM-10DBA-XX-IF-A-00D003.ifc
80 10DOCK-ACM-10DBA-XX-IF-E-00D001.ifc P01.01 Work in Progress BUILDING A - ELECTRICAL MODEL /10DOCK-ACM-10DBA-XX-IF-E-00D001.ifc
81 10DOCK-ACM-10DBA-XX-IF-M-00D001.ifc P01.01 Work in Progress BUILDING A - MECHANICAL MODEL /10DOCK-ACM-10DBA-XX-IF-M-00D001.ifc
82 10DOCK-ACM-10DBA-XX-IF-P-00D001.ifc P01.01 Work in Progress BUILDING A - PUBLIC HEALTH /10DOCK-ACM-10DBA-XX-IF-P-00D001.ifc
83 10DOCK-ACM-10DBA-XX-M3-A-00D001.rvt P01.01 Work in Progress BUILDING A - INTERNAL BUILD UP /10DOCK-ACM-10DBA-XX-M3-A-00D001.rvt
BUILDING A - EXTERNAL ENVELOPE
84 10DOCK-ACM-10DBA-XX-M3-A-00D002.rvt P01.01 Work in Progress /10DOCK-ACM-10DBA-XX-M3-A-00D002.rvt
BUILD UP
85 10DOCK-ACM-10DBA-XX-M3-A-00D003.rvt P01.01 Work in Progress BUILDING A - FF&E /10DOCK-ACM-10DBA-XX-M3-A-00D003.rvt
86 10DOCK-ACM-10DBA-XX-M3-E-00D001.rvt P01.01 Work in Progress BUILDING A - ELECTRICAL MODEL /10DOCK-ACM-10DBA-XX-M3-E-00D001.rvt
10DOCK-ACM-10DBA-XX-M3-M- 10DOCK-ACM-10DBA-XX-M3-M-
87 P01.01 Work in Progress /10DOCK-ACM-10DBA-XX-M3-M-00D001.rvt
00D001.rvt 00D001.rvt
88 10DOCK-ACM-10DBA-XX-M3-P-00D001.rvt P01.01 Work in Progress BUILDING A - PUBLIC HEALTH /10DOCK-ACM-10DBA-XX-M3-P-00D001.rvt
10DOCK-ACM-10DBA-XX-MI-A- 10DOCK-ACM-10DBA-XX-MI-A-
89 P01.01 Work in Progress /10DOCK-ACM-10DBA-XX-MI-A-00D003.docx
00D003.docx 00D003.docx
10DOCK-ACM-10DBA-XX-MI-A-
90 P01.01 Work in Progress Meeting Minutes /10DOCK-ACM-10DBA-XX-MI-A-00D004.docx
00D004.docx
10DOCK-ACM-10DBA-XX-RM-A- 10 Dock Buildings Architectural
91 P01.01 Work in Progress /10DOCK-ACM-10DBA-XX-RM-A-00D001.xlsx
00D001.xlsx Appendices SDR Volume 2 CRM
10DOCK-ACM-10DBA-XX-RP-Z-
92 P06 Work in Progress 10 Dock Buildings Scheme Design Report /10DOCK-ACM-10DBA-XX-RP-Z-00D004.pdf
00D004.pdf
USE Most Recent Drawings 22.06.23 10D
10DOCK-ACM-10DBA-XX-RP-Z-
93 Work in Progress Building A Scheme Design MEP Drawing /10DOCK-ACM-10DBA-XX-RP-Z-00D013.pdf
00D013.pdf
Pack S3
94 10DOCK-ACM-10DBA-XX-RP-Z- P03 Work in Progress 10 Dock Buildings MEP Basis of Design /10DOCK-ACM-10DBA-XX-RP-Z-00D014.pdf
00D014.pdf
10DOCK-ACM-10DBA-XX-SH-E- 10 Dock Buildings - Appendix 1 -
95 P01.01 Work in Progress /10DOCK-ACM-10DBA-XX-SH-E-60D001.pdf
60D001.pdf Electrical Load Assessments
10 Dock Buildings - Appendix 2 -
10DOCK-ACM-10DBA-XX-SH-E-
96 P01.01 Work in Progress Electrical Schedules (Trimble Pro Design /10DOCK-ACM-10DBA-XX-SH-E-60D002.pdf
60D002.pdf
Outputs)
10DOCK-ACM-10DBA-XX-SP-Z- BLDG UNICLASS SPECIFICATION
97 P05 Work in Progress /10DOCK-ACM-10DBA-XX-SP-Z-00D003.pdf
00D003.pdf WORK IN PROGRESS
98 10DOCK-ACM-10DBA-ZZ-DR-A- P01.01 Work in Progress Ground, First & Second Floor Plans /10DOCK-ACM-10DBA-ZZ-DR-A-00D001.pdf
99 10DOCK-ACM-10DBA-ZZ-DR-A-
00D001.pdf P01.01 Work in Progress Third, Fourth & Roof Floor Plans /10DOCK-ACM-10DBA-ZZ-DR-A-00D002.pdf
100 00D002.pdf
10DOCK-ACM-10DBA-ZZ-DR-A- P01.01 Work in Progress Sections KK and LL /10DOCK-ACM-10DBA-ZZ-DR-A-00D003.pdf
810DOCK-ACM-10DBA-02-DR-E-
00D003.pdf Building A Second Floor Security Systems
101 P04 Work in Progress /810DOCK-ACM-10DBA-02-DR-E-68D001.pdf
68D001.pdf Layout

REFERENCES
Item no. File name Version State Reference Of File path
1