You are on page 1of 4

THIS DRAWING IS THE PROPERTY OF VINOD GUNSAI

ASSOCIATES CONSULTANTS AND SHOULD NOT TO BE


COPIED OR USED WITHOUT THEIR WRITTEN PERMISSION.
SPECIAL NOTES
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
MENTIONED OTHERWISE.

WATER STATION
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
DIMENSIONS SHOULD ALWAYS BE READ & NOT
S.S CLADDING GUEST GUEST SCALED/ MEASURED FROM THE DRAWING.

2845
SS-01 LIFT LIFT 3. ALL MEASUREMENTS MUST BE CHECKED AND
115 115 VERIFIED BY THE CONTRACTORS PRIOR TO
FHC
LED COVE LIGHT 150 EXECUTION OF WORK AT THE SITE.
4. THIS DRAWING IS TO BE READ IN CONJUNCTION

770

770
WITH ALL RELEVANT STRUCTURAL, SERVICES &

170

170

170

170
FACILITY PLANNING DRAWINGS.

300 400
1175 740 3120 740 1100 1050 1100 1625 3450 5. ARCHITECTURAL DRAWINGS ARE TO BE FOLLOWED
01

150
FOR THE LOCATION OF ALL STRUCTURAL

1650
D-403-C 600 MEMBERS & MASONRY WALLS. FOR SIZES &
RECEPTION LOBBY 3175 1000 REINFORCEMENT DETAILS OF STRUCTURAL

JUICE COUNTER
2960

1315
150 MEMBERS RELEVANT STRUCTURAL DRAWINGS ARE
TO BE REFERRED.

1950

150
6. ANY DISCREPANCIES BETWEEN ARCHITECTURAL,
E STRUCTURAL AND SERVICES DRAWINGS MUST BE
100

400 300
D-403-B BROUGHT TO THE NOTICE OF THE ARCHITECTS
740 2100
IMMEDIATELY & PRIOR TO EXECUTION AT SITE.

RECEPTION
7. CO-ORDINATION WITH THE SERVICES SUCH AS

470

470 400
1000 HVAC, PLUMBING & ELECTRICAL ETC. IS THE

3925
150 RESPONSIBILITY OF THE CONTRACTORS.
8. ALL MASONRY WALLS SHOULD BE ALIGNED WITH
03 THE COLUMNS AS INDICATED ON THE PLAN
D-403-D IRRESPECTIVE OF THE POSITION AS CALCULATED

3390

1650
WITH THE DIMENSIONING.
GM OFFICE 9. FOR DETAILS, REFER RELEVANT LARGE SCALE
D DETAIL DRGS. AS INDICATED.
740 D-403-B

400 470
1900

830
740

170

170
FINISHES LEGEND:-
PT-01 GENERAL PAINT FINISH
04
02 D-403-D WC-01 WALL COVERING TYPE-01
FURNITURE LAYOUT PLAN D-403-C
BOTTICINO STONE CLADDING
ST-01
A SCALE: 1:75
WC-02 WALL COVERING TYPE-02
BOTTICINO STONE CLADDING
ST-01
WC-03 WALL COVERING TYPE-03

VT-01 FULL BODY VITRIFIED TILE CLADDING

BM-01 BRONZE MIRROR


450

450

MSD
SK-01 100MM HIGH SKIRTING
450
450 GUEST GUEST LM-01 LAMINATE PANELING

1500
LVL +4400 SP

SP LIFT LIFT LEGEND:


450

450

FHC
SPRINKLER
LVL +4200 865 1500 1085

1500
MSD
SP PA SPEAKER
910

LVL +4400
PROJECT :
1780

BGM BGM
MSD SMOKE DETECTOR
1155 1625 1630 1075 1075 2295 2240
HOTEL GREEN MOUNTAIN AT
LVL +4200
1480

1500
GUNA MP. FOR MR. DEEPAK
BGM

SUPPLY/ RETURN AIR GRILL


BGM BGM SPEAKER
450

450

LVL +4600
900

BGM MSD MSD BGM CONSULTANTS :


590 WALL WASHER LIGHT
775

450
2565 2585 2550
900 705
CEILING LIGHT
ViTech Consultants
705 900 LVL +4800 150 ARCHITECTURE II INTERIORS II PROJECT MANAGEMENT SERVICES II
1605

SP SP
CHANDELIER Vaishali Ghaziabad U.P. 201010
GOLDEN PAINT ON THIS CEILING Contact: 9953238159 II vga.vaishali@gmail.com II vinodgunsai@gmail.com
SYMBOL DESCRIPTION
450 DRAWING TITLE:
POP CEILING +@4200MM LEVEL FROM
LVL +4400 LVL +4200
900

BGM MSD MSD BGM FINISHED FLOOR LEVEL


450

LVL +4600
R POP CEILING +@4800MM LEVEL FROM
RECEPTION DETAILS
LVL +4800 FINISHED FLOOR LEVEL
1050

CEILING FINISHED WITH GOLDEN PAINT


LVL +4400
POP CEILING +@4600MM LEVEL FROM DRAWING NO. :
LVL +4600 FINISHED FLOOR LEVEL VGA-GMH-D-403-A
POP CEILING +@4400MM LEVEL FROM
PROJECT CODE : N
LVL +4400 FINISHED FLOOR LEVEL VGA-003/2023
REFLECTED CEILING PLAN LVL +4400
GRID CEILING +@4400MM LEVEL FROM
REV. NO.
B SCALE: 1:75
FINISHED FLOOR LEVEL
SCALE DRAWN BY DATE REF.:
PELMET OUT OF 19MM THK PLYWOOD
FINISHED WITH SYNTHETIC ENAMEL PAINT - ARUN. K 14-09-23
THIS DRAWING IS THE PROPERTY OF VINOD GUNSAI
ASSOCIATES CONSULTANTS AND SHOULD NOT TO BE
COPIED OR USED WITHOUT THEIR WRITTEN PERMISSION.
SPECIAL NOTES
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
MENTIONED OTHERWISE.
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
DIMENSIONS SHOULD ALWAYS BE READ & NOT
ST-01 GUEST GUEST ST-01 SCALED/ MEASURED FROM THE DRAWING.
LIFT LIFT 3. ALL MEASUREMENTS MUST BE CHECKED AND
VERIFIED BY THE CONTRACTORS PRIOR TO
FHC
EXECUTION OF WORK AT THE SITE.
4. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH ALL RELEVANT STRUCTURAL, SERVICES &
FACILITY PLANNING DRAWINGS.
5. ARCHITECTURAL DRAWINGS ARE TO BE FOLLOWED

900
ST-01 BOTTICINO STONE FLOORING FOR THE LOCATION OF ALL STRUCTURAL

100
ST-01 MEMBERS & MASONRY WALLS. FOR SIZES &

300
ST-01 REINFORCEMENT DETAILS OF STRUCTURAL
MEMBERS RELEVANT STRUCTURAL DRAWINGS ARE

100
ST-01 DARK EMPERADOR TO BE REFERRED.
STONE FLOORING 6. ANY DISCREPANCIES BETWEEN ARCHITECTURAL,
100 100 100 100 STRUCTURAL AND SERVICES DRAWINGS MUST BE
900 300 300 2100 ST-02
BROUGHT TO THE NOTICE OF THE ARCHITECTS
IMMEDIATELY & PRIOR TO EXECUTION AT SITE.
ST-01 7. CO-ORDINATION WITH THE SERVICES SUCH AS
ST-01 HVAC, PLUMBING & ELECTRICAL ETC. IS THE
RESPONSIBILITY OF THE CONTRACTORS.
8. ALL MASONRY WALLS SHOULD BE ALIGNED WITH
THE COLUMNS AS INDICATED ON THE PLAN
ST-01 IRRESPECTIVE OF THE POSITION AS CALCULATED

100
WITH THE DIMENSIONING.
9. FOR DETAILS, REFER RELEVANT LARGE SCALE

300
ST-01 DETAIL DRGS. AS INDICATED.

100
900
ST-01

FINISHES LEGEND:-
FLOORING LEGEND:-
PT-01 GENERAL PAINT FINISH
SYMBOL DESCRIPTION

WC-01 WALL COVERING TYPE-01


FLOOR COVERING PLAN ST-01 BOTTICINO STONE FLOORING
C SCALE: 1:75
WC-02 WALL COVERING TYPE-02
ST-02
DARK EMPERADOR
STONE FLOORING
WC-03 WALL COVERING TYPE-03

VT-01 FULL BODY VITRIFIED TILE CLADDING


150
100
BM-01 BRONZE MIRROR
LED COVE LIGHT

400
WALL COVERING WALL COVERING
400

400

SK-01 100MM HIGH SKIRTING


WC-01 WC-01
LED COVE LIGHT 75
LM-01 LAMINATE PANELING
80 160 160 100

300
S.S JALI AS PER APPROVED
WHITE PAINT FINISH
470

25MM THK VENEER FINS

150
VE-01
VENEER CLADDING
VE-01
PROJECT :

VENEER CLADDING HOTEL GREEN MOUNTAIN AT

3015
1315
WHITE PAINT FINISH
VE-01 WITH MDF 3D DESIGN GUNA MP. FOR MR. DEEPAK
GM OFFICE
3390

1650

PT-01 CONSULTANTS :

VENEER CLADDING 150 ViTech Consultants


ARCHITECTURE II INTERIORS II PROJECT MANAGEMENT SERVICES II
VE-01

150
100 Vaishali Ghaziabad U.P. 201010
75 Contact: 9953238159 II vga.vaishali@gmail.com II vinodgunsai@gmail.com
S.S JALI AS PER APPROVED

300
DRAWING TITLE:
150
100 160 160

25MM THK VENEER FINS RECEPTION DETAILS

400
470

WALL COVERING LED COVE LIGHT


100

VE-01
WC-01
LED COVE LIGHT DRAWING NO. :
VGA-GMH-D-403-B
400

WALL COVERING
WC-01 PROJECT CODE : N
VGA-003/2023

REV. NO.
SCALE DRAWN BY DATE REF.:
DETAILED PLAN DETAILED PLAN
D SCALE: 1:25 E SCALE: 1:25 - ARUN. K 14-09-23
THIS DRAWING IS THE PROPERTY OF VINOD GUNSAI
ASSOCIATES CONSULTANTS AND SHOULD NOT TO BE
COPIED OR USED WITHOUT THEIR WRITTEN PERMISSION.
SPECIAL NOTES
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
CEILING LEVEL 50 50 MENTIONED OTHERWISE.
+4600 50 50 POP CEILING 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
DIMENSIONS SHOULD ALWAYS BE READ & NOT
CEILING LEVEL 200 SCALED/ MEASURED FROM THE DRAWING.

200

200
+4400 3. ALL MEASUREMENTS MUST BE CHECKED AND

400
VERIFIED BY THE CONTRACTORS PRIOR TO
CEILING LEVEL EXECUTION OF WORK AT THE SITE.
+4200 50x50MM WIDE S.S STRIPS 4. THIS DRAWING IS TO BE READ IN CONJUNCTION
SS-01 WITH ALL RELEVANT STRUCTURAL, SERVICES &

SM-01
SS-01

SS-01

SS-01

SS-01
SM-01

SM-01

SM-01

SM-01
SS-01 OPEN FACILITY PLANNING DRAWINGS.
S.S CLADDING IN 5. ARCHITECTURAL DRAWINGS ARE TO BE FOLLOWED
S.S CLADDING FOR THE LOCATION OF ALL STRUCTURAL
MIRROR FINISH
+150MM

+150MM

100 +150MM

+150MM

+150MM
MEMBERS & MASONRY WALLS. FOR SIZES &

±00MM

±00MM

±00MM

±00MM

±00MM
SS-01 SM-01
REINFORCEMENT DETAILS OF STRUCTURAL

100
OPEN MEMBERS RELEVANT STRUCTURAL DRAWINGS ARE
LINTEL LEVEL TO BE REFERRED.
+2400 6. ANY DISCREPANCIES BETWEEN ARCHITECTURAL,

4200
4200

LED STRIP LIGHT STRUCTURAL AND SERVICES DRAWINGS MUST BE

4000
PT-01 BROUGHT TO THE NOTICE OF THE ARCHITECTS
IMMEDIATELY & PRIOR TO EXECUTION AT SITE.
LIFT AS PER APPROVED 7. CO-ORDINATION WITH THE SERVICES SUCH AS
+150MM

+150MM

SS-01 +150MM

SS-01 +150MM
±00MM
IN MIRROR FINISH HVAC, PLUMBING & ELECTRICAL ETC. IS THE

2400
RESPONSIBILITY OF THE CONTRACTORS.
LIFT LIFT LIFT LIFT 8. ALL MASONRY WALLS SHOULD BE ALIGNED WITH
S.S CLADDING
SS-01 THE COLUMNS AS INDICATED ON THE PLAN
SS-01

SS-01

SM-01
SS-01 IRRESPECTIVE OF THE POSITION AS CALCULATED
+150MM WITH THE DIMENSIONING.
100MM HIGH SKIRTING 9. FOR DETAILS, REFER RELEVANT LARGE SCALE
100MM HIGH SKIRTING
SK-01 DETAIL DRGS. AS INDICATED.

100
FFL.
SK-01
±00
1175 740 3120 740 1100 300 450 300 1100 1625 3450
FINISHES LEGEND:-
1050
PT-01 GENERAL PAINT FINISH

ELEVATION WC-01 WALL COVERING TYPE-01


01 SCALE: 1:50
WC-02 WALL COVERING TYPE-02

WC-03 WALL COVERING TYPE-03

POP CEILING FINISHED WITH VT-01 FULL BODY VITRIFIED TILE CLADDING
GOLDEN PAINT
BM-01 BRONZE MIRROR

LED COVE LIGHT SK-01 100MM HIGH SKIRTING


CEILING LEVEL PELMET FOR BLINDS
+4600 150 POP CEILING
LM-01 LAMINATE PANELING
CEILING LEVEL
200

+4400

200
CEILING LEVEL
+4200 S.S CLADDING SS-01
SS-01 PAINT FINISH
400 500

CONCEALED LIGHT S.S CLADDING PROJECT :


200 200

100X100MM VENEER SLATS PT-01 SS-01 HOTEL GREEN MOUNTAIN AT


OPEN
WITH CONCEALED LIGHT GUNA MP. FOR MR. DEEPAK
SS-01 SS-01
200

VE-01
LINTEL LEVEL
CONSULTANTS :
+2400
4200

DOOR AS PER DETAILS


ViTech Consultants
100X50MM VENEER SLATS ARCHITECTURE II INTERIORS II PROJECT MANAGEMENT SERVICES II
SS-01
VE-01 Vaishali Ghaziabad U.P. 201010
SS-01 1950 1010 Contact: 9953238159 II vga.vaishali@gmail.com II vinodgunsai@gmail.com
2150

50MM GROOVE BETWEEN SS-01 DRAWING TITLE:


SLATS FINISH WITH VENEER
VE-01 JUICE COUNTER
100MM HIGH SKIRTING RECEPTION DETAILS
850

100MM HIGH SKIRTING


SK-01
SK-01
FFL.
DRAWING NO. :
±00 100 2960 770 VGA-GMH-D-403-C
775 50 1900 770 PROJECT CODE : N
VGA-003/2023

ELEVATION REV. NO.


02 SCALE: 1:50
SCALE DRAWN BY DATE REF.:

- ARUN. K 14-09-23
THIS DRAWING IS THE PROPERTY OF VINOD GUNSAI
ASSOCIATES CONSULTANTS AND SHOULD NOT TO BE
COPIED OR USED WITHOUT THEIR WRITTEN PERMISSION.
POP CEILING FINISHED WITH SPECIAL NOTES
GOLDEN PAINT 1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
CEILING LEVEL MENTIONED OTHERWISE.
LED COVE LIGHT 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
+4600
POP CEILING DIMENSIONS SHOULD ALWAYS BE READ & NOT
CEILING LEVEL SCALED/ MEASURED FROM THE DRAWING.
+4400 3. ALL MEASUREMENTS MUST BE CHECKED AND
VERIFIED BY THE CONTRACTORS PRIOR TO
CEILING LEVEL 705 900 900 705 EXECUTION OF WORK AT THE SITE.
+4200 4. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH ALL RELEVANT STRUCTURAL, SERVICES &

ST-01
ST-01
FACILITY PLANNING DRAWINGS.
GRID CEILING 5. ARCHITECTURAL DRAWINGS ARE TO BE FOLLOWED
FOR THE LOCATION OF ALL STRUCTURAL
BOTTICINO STONE CLADDING MEMBERS & MASONRY WALLS. FOR SIZES &
ST-01 REINFORCEMENT DETAILS OF STRUCTURAL
MEMBERS RELEVANT STRUCTURAL DRAWINGS ARE
LINTEL LEVEL TO BE REFERRED.
+2400 6. ANY DISCREPANCIES BETWEEN ARCHITECTURAL,
STRUCTURAL AND SERVICES DRAWINGS MUST BE
PT-01

S.S PROFILE IN ROSE GOLD FINISH BROUGHT TO THE NOTICE OF THE ARCHITECTS
IMMEDIATELY & PRIOR TO EXECUTION AT SITE.
LAMINATED
7. CO-ORDINATION WITH THE SERVICES SUCH AS
PAINT FINISH LAMINATED LAMINATED LAMINATED LAMINATED GLASS AS/ LAMINATED HVAC, PLUMBING & ELECTRICAL ETC. IS THE
DOOR DOOR DOOR DOOR
GLASS AS/ GLASS AS/ GLASS AS/ GLASS AS/ SPECS. GLASS AS/ RESPONSIBILITY OF THE CONTRACTORS.
SPECS. SPECS. SPECS. 100 SPECS. 100 SPECS. 8. ALL MASONRY WALLS SHOULD BE ALIGNED WITH

150

150
THE COLUMNS AS INDICATED ON THE PLAN

300

300
IRRESPECTIVE OF THE POSITION AS CALCULATED
WITH THE DIMENSIONING.
100MM HIGH SKIRTING 9. FOR DETAILS, REFER RELEVANT LARGE SCALE
ST-01 ST-01

600

600
SK-01 DETAIL DRGS. AS INDICATED.
FFL.
±00
2100 2205 740 2860 740 3465 FINISHES LEGEND:-
PT-01 GENERAL PAINT FINISH

ELEVATION WC-01 WALL COVERING TYPE-01


03 SCALE: 1:50
WC-02 WALL COVERING TYPE-02

WC-03 WALL COVERING TYPE-03

VT-01 FULL BODY VITRIFIED TILE CLADDING


POP CEILING
BM-01 BRONZE MIRROR

SK-01 100MM HIGH SKIRTING


CEILING LEVEL
+4600
LM-01 LAMINATE PANELING
CEILING LEVEL
400

+4400 WC-01
CEILING LEVEL WALL COVERING
+4200 VENEER CLADDING
WC-01
VE-01
VENEER CLADDING
WALL COVERING PROJECT :
VE-01
PT-01

WC-01 HOTEL GREEN MOUNTAIN AT


VENEER FINS
LED STRIP LIGHT
GUNA MP. FOR MR. DEEPAK
VE-01 VE-01
4600

4600

CONSULTANTS :
LED LIGHT
WC-01 4200

PT-01
MDF 3D DESIGN
WC-01
WALL COVERING ViTech Consultants
WC-01 ARCHITECTURE II INTERIORS II PROJECT MANAGEMENT SERVICES II
S.S JALI AS PER APPROVED Vaishali Ghaziabad U.P. 201010
Contact: 9953238159 II vga.vaishali@gmail.com II vinodgunsai@gmail.com
WHITE PAINT FINISH 12MM GROOVE
DRAWING TITLE:

100MM HIGH SKIRTING RECEPTION DETAILS


100MM HIGH SKIRTING
SK-01
SK-01
100

FFL.
DRAWING NO. :
±00
VGA-GMH-D-403-D
LINE OF LIFT WALL

400 300 1315 300 400 400 2590 400 PROJECT CODE : N
VGA-003/2023
150 150

ELEVATION REV. NO.


04 SCALE: 1:50
SCALE DRAWN BY DATE REF.:

- ARUN. K 14-09-23

You might also like