You are on page 1of 4

Mohamed Youssef Omar Youssef

Mechanical Engineer
Personal Information
Address: Alexandria, Egypt
Mobile: +201005754868
Email: mohamedyoussefomar@gmail.com
LinkedIn: in/mohamedyoussef93
Date of Birth: 05/01/1993
Military Service: Completed
Marital Status: Married
Career Objective
To obtain a challenging and rewarding position as a Turbomachinery Mechanical Engineer in the oil and gas industry.
I have 7+ years of experience in the operation, maintenance, troubleshooting and overhauls of industrial gas turbines,
aero derivative gas turbines, centrifugal compressors, pumps, air cooled heat exchangers and package auxiliaries. I am
a highly motivated and results-oriented individual with a strong work ethic. I am also a team player and I am always
willing to go the extra mile to get the job done. I am confident that I can use my skills and experience to make a
significant contribution to your team.
Education
Bachelor’s Degree in Mechanical Engineering 2011-2016
Faculty of Engineering, Alexandria University, Egypt
Overall Cumulative Grade: Good
Graduation Project: Modeling and Optimization for Egyptian Natural Gas Network and Power to Gas Applications.
Project Supervisors: Prof. Dr. Hassan Warda, Eng. Sherif Haddara, Prof. Dr. Essam Wahba.
Project Grade: Excellent.
Work Experience
Turbomachinery Senior Mechanical Engineer | Rashid Petroleum Company Jun 2019 - Present
Responsibilities:
- Operation and Maintenance for turbogenerator SIEMENS SGT-100 with ALSTOM AC Generator 5.25 MW.
- Operation and Maintenance for turbogenerator SIEMENS SGT-300 with Converteam AC Generator 7.9 MW.
- Operation and Maintenance for turbo-compressor SIEMENS SGT-400 with STC-SV centrifugal compressor.
- Operation and Maintenance for turbo-compressor GE PGT25+ DLE with NP centrifugal compressor 2BCL606.
- Perform preventive and corrective maintenance in permit to work system as performing authority.
- Perform Process and Mechanical Isolation as Isolating Authority.
- Perform advanced maintenance management, troubleshooting, field activities, and maintenance activities for
all gas turbines and compressors.
- Prepare operation plans and review operational data.
- Maintenance activities scheduling and planning with manpower utilization.
- Monitors the operational performance of the gas turbines, running parameters and auxiliaries’ operations
using the condition monitoring techniques and Bentley Nevada System-1.
- Perform assigned duties in accordance with the Company procedures and HSE system.
- Review procedures, job plans, operating manuals, and service bulletins for safe maintenance and operation.
- Supervise the listing of maintenance, equipment repair in plant and to discuss maintenance operations with
the preceding section head, about the maintenance plan and current operational requirements.
- Supervise implementation of maintenance programs for tools and equipment to ensure its execution on the
due dates as per sound technical methods.
- Carry-out periodical inspection and technical check-up on tools and equipment to ensure the efficient
implementation of maintenance programs.
- Prepare on a permanent basis the daily, weekly, and periodical technical report relevant to mechanical
maintenance works.

Page 1 of 4
- Hold tool box talks and ensure full abidance to safety rules and regulations during the repair works.
- Train staff in section and assess in upgrading their skills and to monitor their performance.
- Attend daily work permits meeting with issuing authority, permit coordinator and other departments.
- Attend daily work request meeting with maintenance planning team and other departments.
- Attend Asset Integrity meeting with maintenance team leads from other departments.
Achievements:
- Performed Cold Preservation for PGT25+ Gas Generator, High-Speed Power Turbine, Centrifugal Compressor
and Acoustic enclosure with cost saving of 158,000€.
- Performed maintenance of Electric VGV system of SIEMENS Gas turbines with cost saving of 36,000$/Unit.
- Performed Level-1 Inspection for GE PGT25+ DLE aero-derivative gas turbine with cost saving of 15,000$/Unit.
- Performed Cold Preservation for Siemens gas turbine SGT-100 Package, Acoustic enclosure and AC Generator
with cost saving of 15,000$/Unit.
Participated in the following maintenance activities:
Gas Turbine Engines PGT25+ DLE, SGT-100, SGT-300, and SGT-400
- Weekly PM “General Visual Inspection and auxiliaries testing”.
- 2000 Hr. PM “Offline water wash, Gap Check for VSV System and Axial movement of Torque Shaft Inspection”.
- Borescope inspection using OLYMPUS IPLEX and GE MENTOR.
- 4000 Hr. PM “L1-Inspection” for GE PGT25+ DLE “Borescope Inspection for Axial Compressor, Tri-Annular
Combustor, HPT and HSPT. Lube Oil and Hydraulic Filters Replacement, Air intake filter house Inspection, Inlet
Mesh Screen and Exhaust Duct Inspection”.
- 9000 Hr. PM “A-Inspection” for SIEMENS SGT-300 and SGT-400 “Borescope Inspection for Axial Compressor,
Combustion Chamber, CT and HPT. Lube Oil and Hydraulic Filters Replacement, Air intake filter house Inspection,
Inlet Plenum and Exhaust Duct Inspection”.
- Engine Exchange Activities for PGT25+ Gas Generator and High-Speed Power Turbine (HSPT).
Engine Exchange Activities for SGT-300.
- Engine Exchange Activities for SGT-400 Gas Generators and Power Turbine (LPT).
- Allen Gears Gearbox overhaul of SGT-300.
- Peter brotherhood Gearbox overhaul of SGT-400.
- Cold Preservation for PGT25+ Gas Generator, High-Speed Power Turbine (HSPT) and Centrifugal Compressor.
- Cold Preservation for Siemens SGT-100 Package, Gas Generator and Alstom AC Generator.
Centrifugal Compressors “Nuovo Pignone 2BCL606 and SIEMENS STC-SV (10-2-P)”
- 4000 Hr. PM (Seal gas and Nitrogen Separation gas Filters Replacement).
- 25000 Hr. PM “Minor Inspection” (Journal and Thrust Bearing, Dry Gas Seals and Buffer Seals Replacement).
- 50000 Hr. PM “Major Inspection” (Rotor, Impellers, Diaphragms and Labyrinth Seals Inspection).
- Bundle Major Overhaul for STC-SV (10-2-P) and old Bundle disassembly, maintenance, and Inspection.
- Assembly for 2BCL606 Centrifugal Compressor Bundle and Casing.
- Laser Alignment for Compressor rotor with Power Turbine rotor using ROTALIGN ULTRA laser alignment kit.
- Laser Alignment for Compressor rotor with Power Turbine rotor using EASY LASER alignment kit.
Rotating Equipment Engineer | National Paper Company Oct 2018 - Jun 2019
Responsibilities:
- Perform maintenance activities and troubleshooting of all rotating equipment.
- Make periodical tests for all standby and emergency equipment.
- Preparing work orders for maintenance and workshop.
- Responsible for system inspections and system alignments.
- Ensure safe and correct operations of system equipment.
- Maintain system and equipment operations within vendor’s guidelines.
- Co-ordination between departments regarding maintenance work activities; isolation of equipment and placing
equipment back in service.
- Preparing spare parts and stock scheduling.

Page 2 of 4
Project Engineer | General Labs (Exxon Mobil Project) Oct 2017 to Dec 2017
Responsibilities:
- Perform site surveying and sketching P&ID as belt drawings.
- Drawing P&ID and revising site as-built drawings using plant 3D.
- Preparing drawing and plant components list reports.
- Labelling and tagging for the equipment on field according to P&ID.
Inspection Engineer | Gamma for Inspection and Testing Sep 2016 - Oct 2018
Responsibilities:
- Responsible for inspection activities for all crane types according to standards.
- Preparing test procedures for cranes and lifting appliances according to codes, specifications, and standards.
- Perform cranes and lifting appliances inspection tests.
- Perform welding inspection using NDT activities (PT, MT, UT)
Courses and Certifications
Petrolift
- LEEA Certified Appointed Person for Lifting Operation.
Advanced Consulting For Technologies
- Machinery Laser Shaft Alignment for Easy Laser Type XT-770.
SKF E-Learning
- Power Transmission Basics
- Lubrication Basics
- Vibration Basics
- Bearing Basics
Rashpetco On-Job Training
- Safety Induction according to HSE regulations.
- Permit to Work System Procedure.
- Risk Assessment and Job Safety Analysis
- Performing and Isolating Authority Competency.
- Global Maintenance Solution CMMS (Maintenance, Manpower, and Material Planning)
Qualified and Certified Non-Destructive Testing Level II According to ASNT Recommended Practice No.
SNT-TC-1A
- Ultrasonic Testing (UT)
- Radiographic Testing (RT)
- Magnetic Particle Testing (MT)
- Dye Penetrant Testing (PT)
- Visual Testing (VT)
Mechanical Diploma of Rotating Equipment Operation and Maintenance under supervision of the Egyptian
Ministry of Petroleum Oil and Gas Skills (OGS)
- Machine alignment and Balancing Techniques.
- Vibration Monitoring and Analysis Cat I.
- Gas Turbines Operation, Selection, Troubleshooting and Maintenance.
- Gas Compressors Operation, Selection, Troubleshooting and Maintenance.
- Pumps Operation, Selection, Troubleshooting and Maintenance.
Summer Training
- New Abu Qir Power Station 2x650 MW Jul 2015
- Alexandria Container and Cargo Handling Aug 2014
- Abu Qir Petroleum Jul 2014
- Abu Qir Petroleum Jul 2013
- ANRPC Jul 2013
Page 3 of 4
Language Skills
- Mother Tongue: Arabic
- Second Language: English (Fluent proficiency)
Computer Skills
- Bently Nevada System-1
- Microsoft Office (Outlook, Word, Excel, PowerPoint)
- Autodesk Plant 3D
- Autodesk AutoCAD 2D, 3D
- Autodesk Inventor
- SolidWorks
- Ansys Fluent
- WaterCAD, WaterGEMS
- Matlab
- Engineering Equation Solver
References
- References are available upon request

Page 4 of 4

You might also like