Client : BSRDC Risk Assessment Assessment Date: 27-03-2024


Site: 1337 System/ Activity: Initial Vertical Pile Load Test Revision No: 00

Risk Rating
Potential Score Revised Risk
Task/Element Population at Risk Control Measures
hazards/Consequences

2
L s
4
R
8 .. Safe lifting practice to be adopted.
Training to be conducted and safe
1
L
4
s
4
R

postures of lifting to be trained.

Manual handling of test pile Ergonomical Hazard Bone related issues


equipment like dodger

Excavation for pile head 20 .


.
Soil Major injury to fatality 4 5 Safe excavation procedure to be adopted, 2 2
collap excavation work permit should be implemented
se Trained operator to be deployed

Chipping of pile heads Physical hazard, health Hazard Minor injury to Major 4 4 16 . Usage of proper PPES like goggles and ear plugs 1 4 4
Electrical Hazards injury
Electrocution due to . including Safety helmet, jacket and shoes,
All electrical connection should be routed
unsafe usage of
Equipment . through RCCB DBs only
All cables should be joint free and well

Loading/unloading of equipment Toppling of crane, Road Major injury to death 3 5 15 .. insulated and IP44 socket to be used
Safe rigging practices to be adopted 2 3 6

..
incidents, fall of material Property damage Competent rigger and operator to be deployed
TPI of crane should be done .
Inspection of equipment to be conducted. and fit
.. crane to be deployed.
Area should be well compacted.
Barricade board should be fixed. and
work should be executed inside the
.. barricading.
Traffic marshals should be deployed
Everyone will wear high visibility vests
. including basic PPEs.
Cautionary traffic signages should be