Prepared by : Confirmed by: Reviewed & Approved by: Reviewed & Approved by: A Reviewed & Approved by:
Al-Robaya Holding Co. Al-Robaya Holding Co. SAUDI ARAMCO PMT SAUDI ARAMCO PMT p SAUDI ARAMCO
p
r
o
v
Jovit Olayvar Vener Capunitan Shahid Khan Chris Obree e Najeeb M. Al Ghamdi
Safety Manager Project Manager Lead Project Engineer Safety Advisor d P/L Operation Supervisor
Mobile # 0534562704 Mobile # 0555862512 Mobile # 0532915682 Mobile # 0531630801 Mobile #0504809752
b
y
:
SAPMT/Contractor JSA Form - AB-4 rpoject
Reference:
Work Permit System G.I. 2.100; Waste Management, GI 430.001; Work Permit System G.I. 2.100; Saudi Aramco Construction Safety Manual; Traffic and Vehicle Safety G.I. 6.030, Mobile Heavy Equipment Operator
Testing and Certification G.I. 7.025, Fire Fighting Training Company Personnel G.I. 1783.001, Safety Spectacles G.I. 8.002, Protective (Safety) Footwear G.I. 8.005, Environmental Conservation Policy Implementation G.I.
2.714. Near Miss Reporting Process. G.I. 6.004. Cranes & Heavy Equipment Accident Reporting Proced'r.
Saudi Aramco Standard Safety Equipment / PPE (FRC, Steel toed Shoes, Safety Glass and Safety helmet.
Contractor and Proponent shall assign person to be responsible for specific job.
Obtain work permit and Approval Miss-communication / miss- Safety Officer / Permit
1 from the concern proponent/s. understanding Receiver / Foreman
Conduct joint site inspection, check equipment, operator's license, and Saudi Aramco
Certificates.
Joint inspection prior to start of work, conducted jointly by Foreman, Work permit receiver, and
Unsafe working condition.
Safety Officer.
Lack of equipment warning devices such
Peform daily inspection of equipment
as backhorn, beacon lights, etc.
2
Pre-Construction activities Safety Officer / Permit
inspection Missing JSA and Method Statement Receiver / Foreman
Provide copy of JSA and Method Statement to Safety Officer on work site.
procedure copies on site.
Lack of knowledge by workers about Conduct daily tool box meeting, especially when there is change in work condition and when
potential hazards in the work place. new worker join the crew.
Struck people by equipment. Install barricades & warning sign boards 6 mtrs. away or at reasonable distance.
Potential contact to overhead powerline Provide goal post before and after the OverHead power lines
Struck Above Ground (A/G) and or Conduct cable / metal detection prior to start work/activity
Under Ground (U/G) facility by
equipment/s. Provide barricade where necessary.
Use cones, signs, flags or other traffic control devices as outlined in the Traffic Control Plan
Traffic (including pedestrian)
Set up exclusion zone surrounding work area using cones, signs, flags or other traffic control
devices
Wear appropriate PPE including high visibility clothing such as reflective vest
SAPMT/Contractor JSA Form - AB-4 rpoject
Reference:
Work Permit System G.I. 2.100; Waste Management, GI 430.001; Work Permit System G.I. 2.100; Saudi Aramco Construction Safety Manual; Traffic and Vehicle Safety G.I. 6.030, Mobile Heavy Equipment Operator
Testing and Certification G.I. 7.025, Fire Fighting Training Company Personnel G.I. 1783.001, Safety Spectacles G.I. 8.002, Protective (Safety) Footwear G.I. 8.005, Environmental Conservation Policy Implementation G.I.
2.714. Near Miss Reporting Process. G.I. 6.004. Cranes & Heavy Equipment Accident Reporting Proced'r.
Saudi Aramco Standard Safety Equipment / PPE (FRC, Steel toed Shoes, Safety Glass and Safety helmet.
Equipment or dump trucks hitting Equipment operators and drivers shall have constant contact with the spotter while doing the
existing facilities while turning. work.
Safety Officers/Foreman
4 On-going Work Monitoring Continous surveillance in the work place conditions to be conducted to identify new hazards.
Change in work conditions such as
sloping terrain and weather condition.
Updating the JSA and Method Statement as required after new hazards are identified.
Safety Officers/Foreman
5 Housekeeping during and after the Accident in the evening after working Remove the equipment from the center of right-of-way and install warning signs and barricades.
work. hours caused by parked equipment.
Conduct tool box safety meeting prior to commence of work activities every
1 day Al Robaya Safety Personnel Safety Officers
Explain to the key workers the purpose of this JSA and enforce
2 Al Robaya Safety Personnel Safety Officers
implementation of content
3 Use the JSA to identify the hazards and list the precautions on the work Al Robaya Safety Personnel Safety Officers
Note: In the case of an emergency call 013-5720110 from mobile phone or "110" from landline