RCBC TANAY BC STRUCTURE - EXTERIOR

Category Sub-Categories Description Unit Price Unit of Measure Qty Price


Surety DP Bond 6,000.00 Per Lot 1.00 6,000.00
Performance Bond 6,000.00 Per Lot 1.00 6,000.00
CARI (Malayan Insurance) 7,000.00 Per Lot 1.00 7,000.00
Guarantee Bond 6,000.00 Per Lot 1.00 6,000.00
Construction Bond Should be shouldered by the gencon / not be inputted in the bid. -
Building / Ancillary Permits (PD 1096) 30,000.00 Per Lot 1.00 30,000.00
DOLE Clearance - Construction Safety and Health Program (CSHP) 10,000.00 Per Lot 1.00 10,000.00
General
Requirements Standard Health Protocol compliance (PPE's, COVID Testing and 5,000.00 Per Lot 1.00 5,000.00
others)
CEI 5,000.00 Per Lot 1.00 5,000.00
Temporary Facilities / Construction Board-Up 20,000.00 Per Lot 1.00 20,000.00
For Permit/Construction Plans / Contract Documentation / As-
Builting includes production of blueprint plans requirements, signing & sealing 30,000.00 Per Lot 1.00 30,000.00

Mobilization and Demobilization 40,000.00 Per Lot 1.00 40,000.00


General Requirements -Total Per Lot 165,000.00
Clearing, Earth fill, Site Leveling includes tree extraction and soil compaction 10,000.00 Per Lot 1.00 10,000.00
Demolition of Existing Facilities Affected areas in Façade Portion due to DPWH Road Widening 40,000.00 Per Lot 1.00 40,000.00
Hauling of Debirs 15,000.00 Per Lot 1.00 15,000.00
Termite Control / Soil Poisoning (For Extended Portion) D-Fence Inside by Jardine Davies Inc. / I liter / 50 sqm 5,000.00 Per Lot 1.00 5,000.00
Excavation For Wall Footing / Foundation of Extended Part at Back Area 1,200.00 Per cum. 6.00 7,200.00
Site Works
Backfill For Wall Footing / Foundation of Extended Part at Back Area 950.00 Per cum. 3.00 2,850.00
Gravel Bedding 75mm For Wall Footing / Foundation of Extended Part at Back Area 1,750.00 Per cum. 2.50 4,375.00
Site Works Materials - Sub-Total Per Lot 84,425.00
Site Works Labor Sub-Total Per Lot 21,106.25
Site Works Materials and Labor SUB-TOTAL Per Lot 105,531.25
Minimum 1000 psi 4 in (inclusive of mortar and fillers) load bearing Per Square Meter -
Concrete Hollow Block (Perimeter Walls)
Minimum 1000 psi 6 in (inclusive of mortar and fillers) load bearing 1,200.00 Per Square Meter 52.00 62,400.00
12 thick gypsum board on metal furring spaced on .6 mts OCBW, Gypboard, Boral
(Regular for Common Area & Moisture Resistant for Exterior and Toilets + others) Per Square Meter - -

15 thick gypsum board on metal furring spaced on .6 mts OCBW, Gypboard, Boral
Gypsum Ceiling (Plywood Alternate and Including consummables) (Regular for Common Area & Moisture Resistant for Exterior and Toilets + others) Per Square Meter -

16 thick gypsum board on metal furring spaced on .6 mts OCBW, Gypboard, Boral
(Regular for Common Area & Moisture Resistant for Exterior and Toilets + others) Per Square Meter -

Exterior Floor Finishes - Non Skid Tile Finish 60 x 60 SKY NERO ROCK Matte Finish (including consummables) Per Square Meter -

Exterior Floor Finishes - Non Skid Tile Finish 60 x 60 Homogenous Tiles, Non-Skid (including consumables) 1,300.00 Per Square Meter 20.00 26,000.00

BC Exterior Area Replacement of pebble in existing stair at Façade area #5 size washout (boracay beige) Per Lot -
PWD Ramp With SS Railing and Pebble washout 15,000.00 Per Lot 1.00 15,000.00
including finishes per DVD Specs - verify building requirements with building
Exterior Stairs admin Per Lot - -

Exterior Wall Paint Semi Gloss Latex (Boysen) 300.00 Per Sq Meter 120.00 36,000.00
Exterior Ceiling Paint Semi Gloss Enamel (Boysen) - Warm White Per Sq Meter - -
Spandrel Panels for Exterior Ceiling - 6 inches width Pre-Painted panels (White) 1,000.00 Per Linear Meter 230.00 230,000.00
Parapet Wall Minimum 1000 psi 6 in (inclusive of mortar and fillers) load bearing 1,200.00 Per Square Meter 25.00 30,000.00
Wall Plastering Works Cement and sand 350.00 Per Square Meter 35.00 12,250.00
Acrytex or Diamond Masonry White Cement by Skycon Per Bag -
Plaster Finish
Wallcrete or Zemcoat by ABC (1.2 kg/sqm) 450.00 Per 25 kg Bag 2.00 900.00
CHB Cladding (inclusive of rebar) For existing column Per lot -
Portable steel ramp for main door Per lot - -
BC Exterior Area Materials - Sub-Total Per Lot 412,550.00
BC Exterior Area Labor Sub-Total Per Lot 103,137.50
BC Exterior Area Materials and Labor SUB-TOTAL Per Lot 515,687.50
Paint for Interior Masonry Walls (Perimeter Walls) Semi Gloss Latex (Boysen) 400.00 Per Sq Meter 45.00 18,000.00
Paint for Plywood Ceiling Semi Gloss Enamel (Boysen) - Warm White Per Sq Meter - -
Wall Plastering Works Cement and sand Per Square Meter - -
Floor Topping Tiles Preparation Per Square Meter - -
Tire Wires Ga. 18 GI Tire Wires Per Kilogram - -
Republic, Hi-Cement, Island Cement (Portland Cement) Per Bag - -
Cement
Service Area Concrete - 3000 psi compressive strenght (with test result) Per Cu Meter - -
Minimum 700 psi 4 in (inclusive of mortar and fillers) load bearing Per Square Meter - -
Hollow Block
Minimum 700 psi 6 in (inclusive of mortar and fillers) load bearing Per Square Meter -
Extraction, Refurbishing and Reinstallation of Existing Steel Gate 20,000.00 Per Lot 1.00 20,000.00
Relocation / Adjustment of Genset Housing including Electrical Connections 25,000.00 Per Lot 1.00 25,000.00
Service Area Materials - Sub-Total Per Lot 63,000.00
Service Area Labor Sub-Total Per Lot 15,750.00
Service Area Materials and Labor SUB-TOTAL Per Lot 78,750.00
FOUNDATION / COLUMN / SLAB ON FILL / FOOTING TIE BEAM
Tire Wires Ga. 18 GI Tire Wires Per Kilogram - -
Formworks / Scaffoldings Formworks / Scaffoldings Per Lot
10,000.00 1.00 10,000.00
Steel Reinforcing Bars 10 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram
75.00 150.00 11,250.00
12 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram
75.00 250.00 18,750.00
16 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram
75.00 200.00 15,000.00
20 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -
25 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -
Republic, Hi-Cement, Island Cement (Portland Cement) Per Bag -
Cement (For Stiffener Columns / Beams / Foundation / Tie Beams)
Concrete - 3000 psi compressive strenght (with test result) fc 20.68 mpa 5,000.00 Per Cu Meter 12.00 60,000.00
Exterior Wall Paint Semi Gloss Latex (Boysen) Per Sq Meter - -
Stiffiner Beam - H 200 x 300 Per Kilogram -
SUB TOTAL: 115,000.00

ROOF BEAM / ROOF FRAMING / CONCRETE GUTTER / CORBEL / ROOFING / GUTTER / DOWNSPOUT
Tire Wires Ga. 18 GI Tire Wires 75.00 Per Kilogram 10.00 750.00
Formworks / Scaffoldings Formworks / Scaffoldings 10,000.00 Per Lot 1.00 10,000.00
Steel Reinforcing Bars 10 mm 230 mpa; standard size with tie wires (GA #16) 75.00 Per Kilogram 200.00 15,000.00
12 mm 230 mpa; standard size with tie wires (GA #16) 75.00 Per Kilogram 150.00 11,250.00
16 mm 230 mpa; standard size with tie wires (GA #16) 75.00 Per Kilogram 100.00 7,500.00
20 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -
25 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -

Other Works
Category Sub-Categories Description Unit Price Unit of Measure Qty Price
Republic, Hi-Cement, Island Cement (Portland Cement) Per Bag -
Cement (For Roof Beam / Concrete Gutter / Corbel)
Concrete - 3000 psi compressive strenght (with test result) fc 20.68 mpa 5,000.00 Per Cu Meter 5.00 25,000.00
Zee - Purlins GA 16 - 50 x 100mm x 6 meters 1,200.00 Per Piece 50.00 60,000.00
Sag Rod 550mm x 12mm dia plain bar with standard nuts and washers at both ends 950.00 Per Piece 50.00 47,500.00
Waterproofing Membrane 5 ply hot applied for all concrete roof decks and concrete gutters, Esicor Per Square Meter - -
Fiber Resin Waterproofing for Concrete Deck and Gutter 5 coats for Concrete Deck and Gutter with Fiber Mesh, 2mm thk 2,500.00 Per Square Meter 10.00 25,000.00
Other Works Fiber Cloth Waterproofing for Exterior Walls 5 coats for Walls with Fiber Cloth, 1mm thk 450.00 Per Square Meter 80.00 36,000.00
Long Span Roofing (For the replacement of existing and provision for Pre-Painted, 0.5mm thk, 1220mm width Per Linear Meter 50.00 42,500.00
extended portion) 850.00
Tapering Corbel Beam - Base Plate 300 x 300 x 20mm MS Baseplate 2,500.00 Per Square Meter 0.36 900.00
Tapering Corbel Beam - Anchor Bolt 20mm dia x 300mm Anchor Bolt 250.00 Per Piece 16.00 4,000.00
T-1 Top and Bottom Chord 2-2 1/2" x 2 1/2" x 6mm thk 3,500.00 Per Piece 3.00 10,500.00
T-1 Web Members 2-2" x 2" x 4.2mm 3,500.00 Per Piece 3.00 10,500.00
HT-1 and HT-2 Top and Bottom Chord 2-2" x 2" x 6mm 3,500.00 Per Piece 8.00 28,000.00
HT-1 and HT-2 Web Members 2-1 1/2" x 1 1/2" x 4.2mm 3,500.00 Per Piece 8.00 28,000.00
Cross Bracing 20mm dia with fabricated turn buckle 1,500.00 Per Set 4.00 6,000.00
Roof Drain Dome Type Metma Brand or approved equal 750.00 Per Piece 2.00 1,500.00
Roof Insulation 500.00 Per Linear Meter 150.00 75,000.00
Flashings, Ridge Rolls, Facia 20,000.00 Per Lot 1.00 20,000.00
Replacement of Existing Gutter, Downspout and Catch Basin 20,000.00 Per Lot 1.00 20,000.00
SUB TOTAL: 484,900.00

Electric Service Entry Post 12,000.00 Per Lot 1.00 12,000.00


Repainting of Exterior Roofing 400.00 Per Square Meter 150.00 60,000.00
Provision of Storm Drain / Catch Basin for Extended Portion 15,000.00 Per Lot 1.00 15,000.00
Relocation of Flag Sign 10,000.00 Per Lot 1.00 10,000.00
Relocation of affected Utility Lines Power, Water, Telephone/Leaseline, etc 15,000.00 Per Lot 1.00 15,000.00

Repair / Adjustment / Alteration / Rehabilitation of Existing 25,000.00 Per Lot 1.00 25,000.00
Drainage affected by Road Widening

New Water Tank (2000 Liters Capacity) with pressure pump and
Cistern Setup including consumables 45,000.00 Per Lot 1.00 45,000.00

Construction of 3 Chamber Septic Tank 18,000.00 Per Lot 1.00 18,000.00


Others Materials - Sub-Total Per Lot 799,900.00
Others Labor Sub-Total Per Lot 159,980.00
Others Materials and Labor SUB- TOTAL Per Lot 959,880.00
TOTAL MATERIAL AND LABOR COST 1,659,848.75
TOTAL OVERHEAD 165,984.88
TOTAL PROFIT 165,984.88
GRAND TOTAL BID PRICE 2,156,818.50

Note:
Payment Terms will be 35% DP, Min 60% Progress Billing; 100% Completion; 10% Retention

All Prices are Inclusive of VAT and HOI Fees. Prices will be reviewed on a quarterly basis subject to prevailing market conditions.

Project Name: __RCBC TANAY BC EXTERIOR (C/O LESSOR)_____

By: SHOVEL JAR CONSTRUCTION PHILS INC


Authorized Signature of Owner
Printed Name: EDMOND VERGARA
Title : ARCHITECT
Date of Sub: AUG 29 2023
RCBC TANAY BC STRUCTURE - EXTERIOR
Category Sub-Categories Description Unit Price Unit of Measure Qty Price
Surety DP Bond 6,000.00 Per Lot 1.00 6,000.00
Performance Bond 6,000.00 Per Lot 1.00 6,000.00
CARI (Malayan Insurance) 7,000.00 Per Lot 1.00 7,000.00
Guarantee Bond 6,000.00 Per Lot 1.00 6,000.00
Construction Bond Should be shouldered by the gencon / not be inputted in the bid. -
Building / Ancillary Permits (PD 1096) 30,000.00 Per Lot 1.00 30,000.00
DOLE Clearance - Construction Safety and Health Program (CSHP) 5,000.00 Per Lot 1.00 5,000.00
General
Requirements Standard Health Protocol compliance (PPE's, COVID Testing and 5,000.00 Per Lot 1.00 5,000.00
others)
CEI 5,000.00 Per Lot 1.00 5,000.00
Temporary Facilities / Construction Board-Up 20,000.00 Per Lot 1.00 20,000.00
For Permit/Construction Plans / Contract Documentation / As-
Builting includes production of blueprint plans requirements, signing & sealing 30,000.00 Per Lot 1.00 30,000.00

Mobilization and Demobilization 30,000.00 Per Lot 1.00 30,000.00


General Requirements -Total Per Lot 150,000.00
Clearing, Earth fill, Site Leveling includes tree extraction and soil compaction 10,000.00 Per Lot 1.00 10,000.00
Demolition of Existing Facilities Affected areas in Façade Portion due to DPWH Road Widening 30,000.00 Per Lot 1.00 30,000.00
Hauling of Debirs 15,000.00 Per Lot 1.00 15,000.00
Termite Control / Soil Poisoning (For Extended Portion) D-Fence Inside by Jardine Davies Inc. / I liter / 50 sqm 5,000.00 Per Lot 1.00 5,000.00
Excavation For Wall Footing / Foundation of Extended Part at Back Area 1,200.00 Per cum. 6.00 7,200.00
Site Works
Backfill For Wall Footing / Foundation of Extended Part at Back Area 950.00 Per cum. 3.00 2,850.00
Gravel Bedding 75mm For Wall Footing / Foundation of Extended Part at Back Area 1,750.00 Per cum. 2.50 4,375.00
Site Works Materials - Sub-Total Per Lot 74,425.00
Site Works Labor Sub-Total Per Lot 14,885.00
Site Works Materials and Labor SUB-TOTAL Per Lot 89,310.00
Minimum 1000 psi 4 in (inclusive of mortar and fillers) load bearing Per Square Meter -
Concrete Hollow Block (Perimeter Walls)
Minimum 1000 psi 6 in (inclusive of mortar and fillers) load bearing 1,200.00 Per Square Meter 52.00 62,400.00
12 thick gypsum board on metal furring spaced on .6 mts OCBW, Gypboard, Boral
(Regular for Common Area & Moisture Resistant for Exterior and Toilets + others) Per Square Meter - -

15 thick gypsum board on metal furring spaced on .6 mts OCBW, Gypboard, Boral
Gypsum Ceiling (Plywood Alternate and Including consummables) (Regular for Common Area & Moisture Resistant for Exterior and Toilets + others) Per Square Meter -

16 thick gypsum board on metal furring spaced on .6 mts OCBW, Gypboard, Boral
(Regular for Common Area & Moisture Resistant for Exterior and Toilets + others) Per Square Meter -

Exterior Floor Finishes - Non Skid Tile Finish 60 x 60 SKY NERO ROCK Matte Finish (including consummables) Per Square Meter -

Exterior Floor Finishes - Non Skid Tile Finish 60 x 60 Homogenous Tiles, Non-Skid (including consumables) 1,300.00 Per Square Meter 20.00 26,000.00

BC Exterior Area Replacement of pebble in existing stair at Façade area #5 size washout (boracay beige) Per Lot -
PWD Ramp With SS Railing and Pebble washout 12,000.00 Per Lot 1.00 12,000.00
including finishes per DVD Specs - verify building requirements with building
Exterior Stairs admin Per Lot - -

Exterior Wall Paint Semi Gloss Latex (Boysen) 300.00 Per Sq Meter 120.00 36,000.00
Exterior Ceiling Paint Semi Gloss Enamel (Boysen) - Warm White Per Sq Meter - -
Spandrel Panels for Exterior Ceiling - 6 inches width Pre-Painted panels (White) 1,000.00 Per Linear Meter 230.00 230,000.00
Parapet Wall Minimum 1000 psi 6 in (inclusive of mortar and fillers) load bearing 1,200.00 Per Square Meter 25.00 30,000.00
Wall Plastering Works Cement and sand 350.00 Per Square Meter 35.00 12,250.00
Acrytex or Diamond Masonry White Cement by Skycon Per Bag -
Plaster Finish
Wallcrete or Zemcoat by ABC (1.2 kg/sqm) 450.00 Per 25 kg Bag 2.00 900.00
CHB Cladding (inclusive of rebar) For existing column Per lot -
Portable steel ramp for main door Per lot - -
BC Exterior Area Materials - Sub-Total Per Lot 409,550.00
BC Exterior Area Labor Sub-Total Per Lot 81,910.00
BC Exterior Area Materials and Labor SUB-TOTAL Per Lot 491,460.00
Paint for Interior Masonry Walls (Perimeter Walls) Semi Gloss Latex (Boysen) 400.00 Per Sq Meter 45.00 18,000.00
Paint for Plywood Ceiling Semi Gloss Enamel (Boysen) - Warm White Per Sq Meter - -
Wall Plastering Works Cement and sand Per Square Meter - -
Floor Topping Tiles Preparation Per Square Meter - -
Tire Wires Ga. 18 GI Tire Wires Per Kilogram - -
Republic, Hi-Cement, Island Cement (Portland Cement) Per Bag - -
Cement
Service Area Concrete - 3000 psi compressive strenght (with test result) Per Cu Meter - -
Minimum 700 psi 4 in (inclusive of mortar and fillers) load bearing Per Square Meter - -
Hollow Block
Minimum 700 psi 6 in (inclusive of mortar and fillers) load bearing Per Square Meter -
Extraction, Refurbishing and Reinstallation of Existing Steel Gate 20,000.00 Per Lot 1.00 20,000.00
Relocation / Adjustment of Genset Housing including Electrical Connections 20,000.00 Per Lot 1.00 20,000.00
Service Area Materials - Sub-Total Per Lot 58,000.00
Service Area Labor Sub-Total Per Lot 11,600.00
Service Area Materials and Labor SUB-TOTAL Per Lot 69,600.00
FOUNDATION / COLUMN / SLAB ON FILL / FOOTING TIE BEAM
Tire Wires Ga. 18 GI Tire Wires Per Kilogram - -
Formworks / Scaffoldings Formworks / Scaffoldings Per Lot
10,000.00 1.00 10,000.00
Steel Reinforcing Bars 10 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram
75.00 150.00 11,250.00
12 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram
75.00 250.00 18,750.00
16 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram
75.00 200.00 15,000.00
20 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -
25 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -
Republic, Hi-Cement, Island Cement (Portland Cement) Per Bag -
Cement (For Stiffener Columns / Beams / Foundation / Tie Beams)
Concrete - 3000 psi compressive strenght (with test result) fc 20.68 mpa 5,000.00 Per Cu Meter 12.00 60,000.00
Exterior Wall Paint Semi Gloss Latex (Boysen) Per Sq Meter - -
Stiffiner Beam - H 200 x 300 Per Kilogram -
SUB TOTAL: 115,000.00

ROOF BEAM / ROOF FRAMING / CONCRETE GUTTER / CORBEL / ROOFING / GUTTER / DOWNSPOUT
Tire Wires Ga. 18 GI Tire Wires 75.00 Per Kilogram 10.00 750.00
Formworks / Scaffoldings Formworks / Scaffoldings 10,000.00 Per Lot 1.00 10,000.00
Steel Reinforcing Bars 10 mm 230 mpa; standard size with tie wires (GA #16) 75.00 Per Kilogram 200.00 15,000.00
12 mm 230 mpa; standard size with tie wires (GA #16) 75.00 Per Kilogram 150.00 11,250.00
16 mm 230 mpa; standard size with tie wires (GA #16) 75.00 Per Kilogram 100.00 7,500.00
20 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -
25 mm 230 mpa; standard size with tie wires (GA #16) Per Kilogram -

Other Works
Category Sub-Categories Description Unit Price Unit of Measure Qty Price
Republic, Hi-Cement, Island Cement (Portland Cement) Per Bag -
Cement (For Roof Beam / Concrete Gutter / Corbel)
Concrete - 3000 psi compressive strenght (with test result) fc 20.68 mpa 5,000.00 Per Cu Meter 5.00 25,000.00
Zee - Purlins GA 16 - 50 x 100mm x 6 meters 1,200.00 Per Piece 50.00 60,000.00
Sag Rod 550mm x 12mm dia plain bar with standard nuts and washers at both ends 950.00 Per Piece 50.00 47,500.00
Waterproofing Membrane 5 ply hot applied for all concrete roof decks and concrete gutters, Esicor Per Square Meter - -
Fiber Resin Waterproofing for Concrete Deck and Gutter 5 coats for Concrete Deck and Gutter with Fiber Mesh, 2mm thk 2,500.00 Per Square Meter 10.00 25,000.00
Other Works Fiber Cloth Waterproofing for Exterior Walls 5 coats for Walls with Fiber Cloth, 1mm thk 450.00 Per Square Meter 80.00 36,000.00
Long Span Roofing (For the replacement of existing and provision for Pre-Painted, 0.5mm thk, 1220mm width Per Linear Meter 50.00 42,500.00
extended portion) 850.00
Tapering Corbel Beam - Base Plate 300 x 300 x 20mm MS Baseplate 2,500.00 Per Square Meter 0.36 900.00
Tapering Corbel Beam - Anchor Bolt 20mm dia x 300mm Anchor Bolt 250.00 Per Piece 16.00 4,000.00
T-1 Top and Bottom Chord 2-2 1/2" x 2 1/2" x 6mm thk 3,500.00 Per Piece 3.00 10,500.00
T-1 Web Members 2-2" x 2" x 4.2mm 3,500.00 Per Piece 3.00 10,500.00
HT-1 and HT-2 Top and Bottom Chord 2-2" x 2" x 6mm 3,500.00 Per Piece 8.00 28,000.00
HT-1 and HT-2 Web Members 2-1 1/2" x 1 1/2" x 4.2mm 3,500.00 Per Piece 8.00 28,000.00
Cross Bracing 20mm dia with fabricated turn buckle 1,500.00 Per Set 4.00 6,000.00
Roof Drain Dome Type Metma Brand or approved equal 750.00 Per Piece 2.00 1,500.00
Roof Insulation 500.00 Per Linear Meter 150.00 75,000.00
Flashings, Ridge Rolls, Facia 15,000.00 Per Lot 1.00 15,000.00
Replacement of Existing Gutter, Downspout and Catch Basin 15,000.00 Per Lot 1.00 15,000.00
SUB TOTAL: 474,900.00

Electric Service Entry Post 10,000.00 Per Lot 1.00 10,000.00


Repainting of Exterior Roofing 400.00 Per Square Meter 150.00 60,000.00
Provision of Storm Drain / Catch Basin for Extended Portion 15,000.00 Per Lot 1.00 15,000.00
Relocation of Flag Sign 10,000.00 Per Lot 1.00 10,000.00
Relocation of affected Utility Lines Power, Water, Telephone/Leaseline, etc 15,000.00 Per Lot 1.00 15,000.00

Repair / Adjustment / Alteration / Rehabilitation of Existing 20,000.00 Per Lot 1.00 20,000.00
Drainage affected by Road Widening

New Water Tank (2000 Liters Capacity) with pressure pump and
Cistern Setup including consumables 40,000.00 Per Lot 1.00 40,000.00

Construction of 3 Chamber Septic Tank 18,000.00 Per Lot 1.00 18,000.00


Others Materials - Sub-Total Per Lot 777,900.00
Others Labor Sub-Total Per Lot 155,580.00
Others Materials and Labor SUB- TOTAL Per Lot 933,480.00
TOTAL MATERIAL AND LABOR COST 1,583,850.00
TOTAL OVERHEAD 158,385.00
TOTAL PROFIT 158,385.00
GRAND TOTAL BID PRICE 2,050,620.00
say: 2,000,000.00
Note:
Payment Terms will be 35% DP, Min 60% Progress Billing; 100% Completion; 10% Retention

All Prices are Inclusive of VAT and HOI Fees. Prices will be reviewed on a quarterly basis subject to prevailing market conditions.

Project Name: __RCBC TANAY BC EXTERIOR (C/O LESSOR)_____

By: SHOVEL JAR CONSTRUCTION PHILS INC


Authorized Signature of Owner
Printed Name: EDMOND VERGARA
Title : ARCHITECT
Date of Sub: AUG 29 2023