Item Description QUANTITY UNIT UNIT COST
MATERIAL COST
1.00 GENERAL REQUIREMENTS
1.1 Mobilization
Mobilization 1.00 lumpsum ₱15,000.00
Demolition/Clearing 1.00 lumpsum
Equipment deployment 1.00 lumpsum ₱10,000.00
Manpower 1.00 lumpsum
Materials Demobilization 1.00 lumpsum ₱5,000.00
1.2 Permits 1.00 lumpsum
1.3 Temporary Facilities 1.00 lumpsum
1.4 Safety Requirements 1.00 lumpsum ₱10,000.00
1.5 Testing and Commisioning 1.00 lumpsum ₱15,000.00
1.6 Demobilization 1.00 lumpsum ₱5,000.00
TOTAL PRELIMINARIES ₱60,000.00
2.00 ARCHITECTURAL
2.1 Windows Openings
2.2 Doors Openings
2.3 Finishes
2.3.1 Postformable Brushed alluminum High-end laminate finish
2.3.2 Concrete Plaster Finish with matte sealer @ ceiling and restoration of the existing Stucco finish
2.5 Fit-Outs
Supply of materials / fabrication / installation / construction;
2.5.1 Fabrication of countertop using Marine Grade Plywood
2.5.1.1 Marine Grade Plywood 4 x 8ft 18mm thk.
2.5.1.2 Good Lumber 2'' x 2'' 10ft
2.5.1.3 Marine Grade Plywood 4 x 8ft 9mm thk.
2.5.1.4 Polituff body filler
2.5.2 Installation of Clothing display rack and Ceiling mounted racks
2.5.2.1 1''x1'' Stainless steel square tubular
2.6 Others
2.6.1 Application of Skim coat
2.6.1.1 Metal Screws
2.6.1.2 Joint Tapes
AMOUNT IN WORDS : Six Hundred Eighty Thousand Thirty Six Pesos Only