DCMA 14 Metrics ( Tasks)

1 2 3 4 5 6 7 8 9 10
No
Hard Negative High
Assessment criteria Missing Pred Missing Succ Negative Lags Have Lags Relationship Types High Float Invalid Dates Assigned
Constraints Float Duration
Resources
Invalid Invalid Invalid Invalid
FS 90% or SS, FF Less SF Less than Less than Less than Actual Actual Forecast Forecast
Goal Less than 5% Less than 5% 0 tasks Less than 5% 5% or less 0 tasks
greater then 10 % 0 Task 5% 5% 5% Start 0 Finish 0 Start 0 Finish 0
tasks tasks tasks tasks

# Links for incompleted Tasks Incompleted Tasks 0 0 0 125 334 389 0 0 208 98 42 0 0 0 0 228

723 407 0.0% 0.0% 0.0% 30.71% 46.2% 26.9% 0.0% 0.0% 51.11% 24.08% 10.32% 0.00% 0.00% 0.00% 0.00% 56.0%

Only Incompleted Tasks (No Milestones, No level of effort And Non Completed)

Metrics (Milestones)
Total Incompleted Milestones 8

1 2 3 4 5
Negative
Assessment criteria Missing Pred Missing Succ Hard Constraints High Float Invalid Dates
Float
Invalid Invalid
Invalid Actual Invalid Actual
Only Contractual For Forecast Forecast
Goal 1 Milestone 1 Milestone 0 Milestone Start 0 Finish 0
Milestones Information Start 0 Finish 0
Milestone Milestone
Milestone Milestone

1 1 0 5 2 0 0 0 0

Metrics Activity ID Activity Name Value


Tasks with Lag SUR-OF-1020 Perform Environmental Impact surveys
Tasks with Lag A1440 Preperation & submission
Tasks with Lag A2470 Handing Over
Tasks with Lag A2480 Dellivery of HDPE Pipes - 1st Delivery
Tasks with Lag A2500 Dellivery of DI Pipes
Tasks with Lag A2600 Dellivery of Bedding Material/Black sand
Tasks with Lag A2720 Material Submital of HDPE Pipes & Fittings
Tasks with Lag A2740 Material Submital of DI Pipes & Fittings
Tasks with Lag A2780 Material Submital of Valves & Fittings
Tasks with Lag A2790 Material Submital of LV Power Cables
Tasks with Lag A2800 Material Submital of GRP Tank
Tasks with Lag A2810 Material Submital of DI Cover & Frame
Tasks with Lag A2820 Material Submital of GRP Kiosks
Tasks with Lag A2830 Material Submital of Chamber Accessories
Tasks with Lag A2910 Material Submital of Surge vessel
Tasks with Lag A2920 Material Submital of Concrete Colllars/ Ballats
Tasks with Lag A2930 Material Submital of Buoys
Tasks with Lag A3270 Material Submital of Basket Strainer
Tasks with Lag A3640 Material Submital of Aluminium Sealing Flange
Tasks with Lag A3650 Material Submital of Step Coupling with all Accessories
Tasks with Lag A3670 Material Submital of Water Proofing Material
Tasks with Lag A4880 Testing & Commissioning - Pipe network at Sila
Tasks with Lag A4890 Testing & Commissioning - Pipenetwork at Al Yasat
Tasks with Lag A4970 Material Submital of polyseal ps
Tasks with Lag A4980 Material Submital of PVC waterstop
Tasks with Lag A4990 Material Submital of skid
Tasks with Lag A5010 Material Submital of cable tile
Tasks with Lag A5020 Material Submital of service turrent
Tasks with Lag A5030 Material Submital of instrumentation and control materials
Tasks with Lag A5300 Leveling & Preparation for Trenched area
Tasks with Lag A5310 Placing of Geotextile Material
Tasks with Lag A5320 Placing of Granular Bedding
Tasks with Lag A5330 Laying of Pipes
Tasks with Lag A5340 Jointing HDPE Pipes
Tasks with Lag A5370 Blinding Preparation work
Tasks with Lag A5400 Placing Water proofing materials
Tasks with Lag A5410 Form work & Concrete for manhole base
Tasks with Lag A5420 Form work & concrete for manhole wall
Tasks with Lag A5430 Valve & Fittings Installation
Tasks with Lag A5520 Granular Surround
Tasks with Lag A5530 Trench Backfilling
Tasks with Lag A5540 Internal Finishing works
Tasks with Lag A5550 Manhole backfilling
Tasks with Lag A5560 Trench Excavation for Pipe Laying
Tasks with Lag A5570 Leveling & Preparation for Trenched Area
Tasks with Lag A5580 Placing of Geotextile Material
Tasks with Lag A5590 Placing Granular Bedding
Tasks with Lag A5600 Laying of Pipes
Tasks with Lag A5610 Jointing DI Pipes
Tasks with Lag A5630 Granular Surround
Tasks with Lag A5640 Trench Backfilling
Tasks with Lag A5690 Grouting of all voids in the soil outside the casing
Tasks with Lag A5730 Installation GRP Kiosk
Tasks with Lag A5740 Install GRP kiosk
Tasks with Lag A5750 Power Supply for GRP kiosk
Tasks with Lag A6110 Connection of Sila shore to Offshore - Trench dredg starting
Tasks with Lag A6120 Trench Dredging near Sila end, water depth <10m
Tasks with Lag A6130 Butt fusion welding of pipes in sila
Tasks with Lag A6140 Butt fusion welding of pipe
Tasks with Lag A6180 Use butt fusion welding
Tasks with Lag A6200 Install Pipe in Sila shore
Tasks with Lag A6210 Install pipes in Span-1
Tasks with Lag A6240 Use butt fusion welding
Tasks with Lag A6280 Use Butt fusion welding
Tasks with Lag A6320 Use Butt fusion welding
Tasks with Lag A6360 Use Butt fusion welding
Tasks with Lag A6370 Fixing Concrete collar
Tasks with Lag A6380 Install pipes in Span-6
Tasks with Lag A6400 Use Butt fusion welding
Tasks with Lag A6410 Fixing Concrete collar
Tasks with Lag A6420 Install pipes in Span-7
Tasks with Lag A6440 Use Butt fusion welding
Tasks with Lag A6450 Fixing Concrete collar
Tasks with Lag A6480 Use Butt fusion welding
Tasks with Lag A6520 Use Butt fusion welding
Tasks with Lag A6560 Use Butt fusion welding
Tasks with Lag A6600 Use Butt fusion welding
Tasks with Lag A6610 Fixing Concrete collar
Tasks with Lag A6620 Install pipes in Span-12
Tasks with Lag A6640 Use Butt fusion welding
Tasks with Lag A6660 Install pipes in Span-13
Tasks with Lag A6680 Use Butt fusion welding
Tasks with Lag A6690 Fixing Concrete collar
Tasks with Lag A6700 Install pipes in Span-14
Tasks with Lag A6720 Use Butt fusion welding
Tasks with Lag A6730 Fixing Concrete collar
Tasks with Lag A6740 Install pipes in Span-15
Tasks with Lag A6760 Use Butt fusion welding
Tasks with Lag A6770 Fixing Concrete collar
Tasks with Lag A6780 Install pipes in Span-16
Tasks with Lag A6800 Use Butt fusion welding
Tasks with Lag A6810 Fixing Concrete collar
Tasks with Lag A6820 Install pipes in Span-17
Tasks with Lag A6840 Use Butt fusion welding
Tasks with Lag A6850 Fixing Concrete collar
Tasks with Lag A6860 Install pipes in Span-18
Tasks with Lag A6880 Use Butt fusion welding
Tasks with Lag A6890 Fixing Concrete collar
Tasks with Lag A6900 Install pipes in Span-19
Tasks with Lag A6920 Use Butt fusion welding
Tasks with Lag A6930 Fixing Concrete collar
Tasks with Lag A6940 Install pipes in Span-20
Tasks with Lag A6960 Use Butt fusion welding
Tasks with Lag A6970 Fixing Concrete collar
Tasks with Lag A6980 Install pipes in Span-21
Tasks with Lag A7000 Use Butt fusion welding
Tasks with Lag A7010 Fixing Concrete collar
Tasks with Lag A7020 Install pipes in Span-22
Tasks with Lag A7040 Use Butt fusion welding
Tasks with Lag A7050 Fixing Concrete collar
Tasks with Lag A7060 Install pipes in Span-23
Tasks with Lag A7080 Use Butt fusion welding
Tasks with Lag A7090 Fixing Concrete collar
Tasks with Lag A7100 Install pipes in Span-24
Tasks with Lag A7110 Connection of Offshore to Yasat shore - Trench dredging near yasat
Tasks with Lag A7130 Use butt fusion welding
Tasks with Lag A7140 Install concrete collar
Tasks with Lag A7150 Install HDPE pipes
Tasks with Lag A6150 Fixing concrete Collars/Ballasts
Tasks with Lag A7160 Disposing excavated materials
Tasks with Lag A7170 Hydrostatic pressure testing
Tasks with Lag A7180 Disinfection
Tasks with Lag A7190 Install dangerous sign board at sila and yasat
Tasks with Lag A7220 Install shore end protection (Fixing Rocks)
Tasks with Lag A7300 Use Rilway to Transportation of Pipes Sila to Boats
Milestones Missing Predecessor K-1010 Project Start- Site handing over
Milestones with Missing Successor K-1100 End date - Project Handing Over
Tasks with high duration A2950 Material Approval for HDPE Pipes & Fittings 48
Tasks with high duration A2450 Submission of As Built Drawing & Handing Over Documents
63
Tasks with high duration A2480 Dellivery of HDPE Pipes - 1st Delivery 118
Tasks with high duration NOC-1020 Obtain NOC from all the relevant authorities 62
Tasks with high duration NOC-1030 Obtain EAD permit 62
Tasks with high duration A6090 Dellivery of HDPE Pipes - 2nd Delivery 158
Tasks with high duration A6100 Install Earthing 45
Tasks with high duration A5300 Leveling & Preparation for Trenched area 61
Tasks with high duration A5310 Placing of Geotextile Material 61
Tasks with high duration A5320 Placing of Granular Bedding 61
Tasks with high duration A5330 Laying of Pipes 91
Tasks with high duration A5340 Jointing HDPE Pipes 61
Tasks with high duration A5490 Form work & Concrete for foundation 45
Tasks with high duration A5500 GRP Tank Installation 83
Tasks with high duration A5520 Granular Surround 61
Tasks with high duration A6080 Install Field Instruments 45
Tasks with high duration A5290 Trench Excavation for Pipe Laying 91
Tasks with high duration A5830 Manufacture of LV Power Cables 165
Tasks with high duration A5840 Manufacture of GRP Tank 124
Tasks with high duration A5850 Manufacture of DI Cover & Frame 165
Tasks with high duration A5860 Manufacture of GRP Kiosks 124
Tasks with high duration A5880 Manufacture of Mix design 118
Tasks with high duration A5890 Manufacture of Reinforced steel 118
Tasks with high duration A5900 Manufacture of Valve & Fittings 206
Tasks with high duration A5910 Manufacture of Concrete Colllars/ Ballats 107
Tasks with high duration A5920 Manufacture of Chamber Accessories 165
Tasks with high duration A5530 Trench Backfilling 91
Tasks with high duration A5800 Manufacture of DI Pipes 165
Tasks with high duration A5560 Trench Excavation for Pipe Laying 120
Tasks with high duration A5570 Leveling & Preparation for Trenched Area 120
Tasks with high duration A5580 Placing of Geotextile Material 120
Tasks with high duration A5590 Placing Granular Bedding 61
Tasks with high duration A5600 Laying of Pipes 103
Tasks with high duration A5610 Jointing DI Pipes 83
Tasks with high duration A5630 Granular Surround 61
Tasks with high duration A5640 Trench Backfilling 61
Tasks with high duration A5820 Manufacture of Distribution Boards 124
Tasks with high duration A5810 Manufacture of DI Fittings 118
Tasks with high duration A5720 Power Cabling works 45
Tasks with high duration A5730 Installation GRP Kiosk 45
Tasks with high duration A5780 Manufacture of HDPE Pipes 118
Tasks with high duration A5790 Manufacture of HDPE Fittings 118
Tasks with high Float A3160 Dellivery of Distribution Boards 149
Tasks with high Float A1000 Preperation & submission 63
Tasks with high Float A2840 Material Submital of Bedding Material/Black sand 111
Tasks with high Float A2860 Material Submital of Mix design 73
Tasks with high Float A2870 Material Submital of Reinforced steel 103
Tasks with high Float A2880 Material Submital of Dstribution boards 70
Tasks with high Float A2900 Material Submital of Aluminium Surface box 205
Tasks with high Float A2910 Material Submital of Surge vessel 117
Tasks with high Float A2930 Material Submital of Buoys 185
Tasks with high Float A2940 Material Submital of Dismantling Joints 148
Tasks with high Float A2820 Material Submital of GRP Kiosks 111
Tasks with high Float A2810 Material Submital of DI Cover & Frame 154
Tasks with high Float A3190 Dellivery of Control Valves 265
Tasks with high Float A3200 Dellivery of Aluminium Surface box 205
Tasks with high Float A3210 Dellivery of Surge vessel 117
Tasks with high Float A3220 Dellivery of Buoys 185
Tasks with high Float A3230 Dellivery of Aluminium Vent Pipe 206
Tasks with high Float A3240 Dellivery of Instrumentation Valves 271
Tasks with high Float A3250 Dellivery of Earthing Materials 175
Tasks with high Float A2600 Dellivery of Bedding Material/Black sand 111
Tasks with high Float A2490 Dellivery of HDPE Fittings 73
Tasks with high Float A2540 Dellivery of Distribution Boards 70
Tasks with high Float A2550 Dellivery of LV Power Cables 87
Tasks with high Float A2830 Material Submital of Chamber Accessories 138
Tasks with high Float A2580 Dellivery of GRP Kiosks 111
Tasks with high Float A3270 Material Submital of Basket Strainer 211
Tasks with high Float A2620 Dellivery of Mix design 73
Tasks with high Float A2630 Dellivery of Reinforced steel 103
Tasks with high Float A2640 Dellivery of Valve & Fittings 93
Tasks with high Float A2700 Dellivery of Chamber Accessories 138
Tasks with high Float A2780 Material Submital of Valves & Fittings 93
Tasks with high Float A2790 Material Submital of LV Power Cables 87
Tasks with high Float A2570 Dellivery of DI Cover & Frame 154
Tasks with high Float A3350 Dellivery of Basket Strainer 211
Tasks with high Float A3900 Material Approval for Pipeline Corrossion Protection
100Material
Tasks with high Float A3910 Preperation & submission 180
Tasks with high Float A3920 Review & recieve comments 180
Tasks with high Float A3930 Incooperation of comments & submission 180
Tasks with high Float A3940 Review & recieve approval 180
Tasks with high Float A3320 Dellivery of Pipeline corrossion material 100
Tasks with high Float A3340 Dellivery of Aluminium sealing flange 238
Tasks with high Float A3870 Material Approval for Aluminium Sealing Flange 206
Tasks with high Float A3500 Dellivery of Flange Adapters 246
Tasks with high Float A4220 Dellivery of Dismantling Joints 148
Tasks with high Float SUR-YS-1020 Submission of topographical survey report at Al Yasat
46
Tasks with high Float SUR-YS-1030 Approval of site survey report at Al Yasat 46
Tasks with high Float A4230 Prequalification of subcontractor submittal for NDRC
179
Tasks with high Float A4240 Prequalification of subcontractor approval for for NDRC
179
Tasks with high Float A3330 Dellivery of Step coupling with all Accessories 249
Tasks with high Float A3760 Material Approval for Bedding Material/Black sand111
Tasks with high Float A1770 Review & recieve comments 309
Tasks with high Float A3640 Material Submital of Aluminium Sealing Flange 206
Tasks with high Float A3650 Material Submital of Step Coupling with all Accessories
249
Tasks with high Float A3660 Material Submital of Earthing Material 175
Tasks with high Float A3670 Material Submital of Water Proofing Material 143
Tasks with high Float A3700 Material Approval for Valves & Fittings 93
Tasks with high Float A3710 Material Approval for LV Power cable 87
Tasks with high Float A3730 Material Approval for DI Cover & Frame 154
Tasks with high Float A3890 Material Approval for Earthing Material 175
Tasks with high Float A3750 Material Approval for Chamber Accessories 138
Tasks with high Float A3880 Material Approval for Step Coupling with all Accessories
249
Tasks with high Float A3770 Material Approval for Mix design 73
Tasks with high Float A3780 Material Approval for Reinforced steel 103
Tasks with high Float A3790 Material Approval for Dstribution boards 70
Tasks with high Float A3800 Material Approval for Aluminium Surface box 205
Tasks with high Float A3810 Material Approval for Surge vessel 117
Tasks with high Float A3830 Material Approval for Buoys 185
Tasks with high Float A3840 Material Approval for Dismantling Joints 148
Tasks with high Float A3850 Material Approval for Flange Adapters 246
Tasks with high Float A3860 Material Approval for Basket Strainer 211
Tasks with high Float A3260 Material Submital of Flange Adapters 206
Tasks with high Float A3740 Material Approval for GRP Kiosks 111
Tasks with high Float GP-1020 Obtain permits from developed of Yasat Island 90
Tasks with high Float ON-EE-1010 Preperation & submission 243
Tasks with high Float ON-EE-1020 Review & recieve comments 243
Tasks with high Float ON-EE-1030 Incooperation of comments & submission 243
Tasks with high Float A1790 Review & recieve approval 309
Tasks with high Float ON-EE-1040 Review & recieve approval 243
Tasks with high Float A1130 Review & recieve comments 63
Tasks with high Float A1010 Review & recieve comments 63
Tasks with high Float A1020 Incooperation of comments & submission 63
Tasks with high Float A1030 Review & recieve approval 63
Tasks with high Float A1040 Preperation & submission 63
Tasks with high Float A1050 Review & recieve comments 63
Tasks with high Float A1060 Incooperation of comments & submission 63
Tasks with high Float A1070 Review & recieve approval 63
Tasks with high Float A1080 Preperation & submission 63
Tasks with high Float A1090 Review & recieve comments 63
Tasks with high Float A1100 Incooperation of comments & submission 63
Tasks with high Float GP-1010 Obtain gate pass for Al Yaasat Island 90
Tasks with high Float A1120 Preperation & submission 63
Tasks with high Float A1140 Incooperation of comments & submission 63
Tasks with high Float A1150 Review & recieve approval 63
Tasks with high Float SUR-YS-1010 Detailed topographical survey at Al Yasat 46
Tasks with high Float A1280 Preperation & submission 46
Tasks with high Float A1110 Review & recieve approval 63
Tasks with high Float A1670 Review & recieve approval 114
Tasks with high Float A1550 Review & recieve approval 147
Tasks with high Float A1560 Preperation & submission 335
Tasks with high Float A1570 Review & recieve comments 335
Tasks with high Float A1580 Incooperation of comments & submission 335
Tasks with high Float A1590 Review & recieve approval 335
Tasks with high Float A1600 Preperation & submission 235
Tasks with high Float A1610 Review & recieve comments 235
Tasks with high Float A1620 Incooperation of comments & submission 235
Tasks with high Float A1630 Review & recieve approval 235
Tasks with high Float A1640 Preperation & submission 114
Tasks with high Float A1660 Incooperation of comments & submission 114
Tasks with high Float A1520 Preperation & submission 114
Tasks with high Float A1680 Preperation & submission 348
Tasks with high Float A1690 Review & recieve comments 348
Tasks with high Float A1700 Incooperation of comments & submission 348
Tasks with high Float A1710 Review & recieve approval 348
Tasks with high Float A1720 Preperation & submission 309
Tasks with high Float A1730 Review & recieve comments 309
Tasks with high Float A1740 Incooperation of comments & submission 309
Tasks with high Float A1750 Review & recieve approval 309
Tasks with high Float A1760 Preperation & submission 309
Tasks with high Float A1650 Review & recieve comments 114
Tasks with high Float A1410 Review & recieve comments 179
Tasks with high Float A1290 Review & recieve comments 46
Tasks with high Float A1300 Incooperation of comments & submission 46
Tasks with high Float A1310 Review & recieve approval 46
Tasks with high Float A1360 Preperation & submission 70
Tasks with high Float A1370 Review & recieve comments 70
Tasks with high Float A1380 Incooperation of comments & submission 70
Tasks with high Float A1540 Incooperation of comments & submission 147
Tasks with high Float A1400 Preperation & submission 179
Tasks with high Float A1530 Review & recieve comments 147
Tasks with high Float A1420 Incooperation of comments & submission 179
Tasks with high Float A1430 Review & recieve approval 179
Tasks with high Float A1440 Preperation & submission 63
Tasks with high Float A1450 Review & recieve comments 63
Tasks with high Float A1460 Incooperation of comments & submission 63
Tasks with high Float A1470 Review & recieve approval 63
Tasks with high Float A1480 Preperation & submission 199
Tasks with high Float A1490 Review & recieve comments 199
Tasks with high Float A1500 Incooperation of comments & submission 199
Tasks with high Float A1510 Review & recieve approval 199
Tasks with high Float A1780 Incooperation of comments & submission 309
Tasks with high Float A1390 Review & recieve approval 70
Tasks with high Float A6090 Dellivery of HDPE Pipes - 2nd Delivery 58
Tasks with high Float A6060 Manufacture of Dismantling Joints 148
Tasks with high Float A5430 Valve & Fittings Installation 56
Tasks with high Float A5360 Excavation work 48
Tasks with high Float A5370 Blinding Preparation work 48
Tasks with high Float A5380 Concrete Blinding 48
Tasks with high Float A5390 Install Protection Screed 48
Tasks with high Float A5400 Placing Water proofing materials 48
Tasks with high Float A5540 Internal Finishing works 48
Tasks with high Float A5420 Form work & concrete for manhole wall 48
Tasks with high Float A5440 Water proofing for external surfaces 56
Tasks with high Float A5450 Installation of cover slab 56
Tasks with high Float A5460 Excavation works 62
Tasks with high Float A5470 Placing concrete Blinding 62
Tasks with high Float A5480 Waterproof & Protection Screed 62
Tasks with high Float A5490 Form work & Concrete for foundation 62
Tasks with high Float A5510 Finishing work 71
Tasks with high Float A5410 Form work & Concrete for manhole base 48
Tasks with high Float A5100 Material Approval for polyseal ps 254
Tasks with high Float A4950 Material Submital of Polythelene sheet 93
Tasks with high Float A4960 Material Submital of Concrete Repairing / finishing174
material
Tasks with high Float A4970 Material Submital of polyseal ps 254
Tasks with high Float A4980 Material Submital of PVC waterstop 236
Tasks with high Float A4990 Material Submital of skid 185
Tasks with high Float A5000 Material Submital of sign board 246
Tasks with high Float A5010 Material Submital of cable tile 282
Tasks with high Float A5020 Material Submital of service turrent 280
Tasks with high Float A5030 Material Submital of instrumentation and control materials
253
Tasks with high Float A5090 Material Approval for Concrete Repairing / finishing
143material
Tasks with high Float A5110 Material Approval for PVC waterstop 236
Tasks with high Float A5120 Material Approval for skid 236
Tasks with high Float A5130 Material Approval for sign board 246
Tasks with high Float A5140 Material Approval for cable tile 282
Tasks with high Float A5150 Material Approval for service turrent 280
Tasks with high Float A5160 Material Approval for instrumentation and control253materials
Tasks with high Float A5550 Manhole backfilling 48
Tasks with high Float A5080 Material Approval for Polythelene sheet 93
Tasks with high Float A5950 Manufacture of Aluminium Surface box 205
Tasks with high Float A5830 Manufacture of LV Power Cables 87
Tasks with high Float A5850 Manufacture of DI Cover & Frame 154
Tasks with high Float A5860 Manufacture of GRP Kiosks 111
Tasks with high Float A5870 Manufacture of Bedding Material/Black sand 111
Tasks with high Float A5880 Manufacture of Mix design 73
Tasks with high Float A5890 Manufacture of Reinforced steel 103
Tasks with high Float A5900 Manufacture of Valve & Fittings 93
Tasks with high Float A5920 Manufacture of Chamber Accessories 138
Tasks with high Float A5940 Manufacture of Control Valves 265
Tasks with high Float A5960 Manufacture of Surge vessel 117
Tasks with high Float A5970 Manufacture of Buoys 185
Tasks with high Float A5980 Manufacture of Aluminium Vent Pipe 206
Tasks with high Float A5990 Manufacture of Instrumentation Valves 271
Tasks with high Float A6000 Manufacture of Earthing Materials 175
Tasks with high Float A6010 Manufacture of Pipeline corrossion materiaol 100
Tasks with high Float A6020 Manufacture of Step coupling with all Accessories249
Tasks with high Float A6030 Manufacture of Aluminium sealing flange 238
Tasks with high Float A6040 Manufacture of Basket Strainer 211
Tasks with high Float A6050 Manufacture of Flange Adapters 246
Tasks with high Float A5930 Manufacture of Distribution Boards 149
Tasks with high Float A5690 Grouting of all voids in the soil outside the casing142
Tasks with high Float A5650 Construction of thrust /reception pits 142
Tasks with high Float A5660 Supply and installation of casing pipe 142
Tasks with high Float A5820 Manufacture of Distribution Boards 70
Tasks with high Float A5680 Grouting of Granular space between water pipeline 142and casing pipe
Tasks with high Float A5700 Protection and supporting of existing services 142
Tasks with high Float A5730 Installation GRP Kiosk 71
Tasks with high Float A5790 Manufacture of HDPE Fittings 73
Tasks with high Float A5670 Installlation and testing of water pipeleine through142
the casing pipe
Milestones with high Float K-1080 Commencement of construction 241
Milestones with high Float K-1070 End of Design 90
Milestones with high Float K-1060 Commencement of Design 48
Milestones with high Float K-1050 Mobilization finish 359
Milestones with high Float K-1040 Mobilization start 198
Tasks with Negative Float A2470 Handing Over 0
Tasks with Negative Float A3990 Preperation & submission 0
Tasks with Negative Float A4000 Review & recieve comments 0
Tasks with Negative Float A4010 Incooperation of comments & submission 0
Tasks with Negative Float A4020 Review & recieve approval 0
Tasks with Negative Float SI-OF-1010 soil investigation 0
Tasks with Negative Float SI-OF-1020 Submission of soil investigation report 0
Tasks with Negative Float SI-OF-1030 Recieve Approval for soil investigation report 0
Tasks with Negative Float A4890 Testing & Commissioning - Pipenetwork at Al Yasat 0
Tasks with Negative Float A1320 Preperation & submission 0
Tasks with Negative Float A1330 Review & recieve comments 0
Tasks with Negative Float A1340 Incooperation of comments & submission 0
Tasks with Negative Float A1350 Review & recieve approval 0
Tasks with Negative Float A6570 Fixing Concrete collar 0
Tasks with Negative Float A6410 Fixing Concrete collar 0
Tasks with Negative Float A6420 Install pipes in Span-7 0
Tasks with Negative Float A6440 Use Butt fusion welding 0
Tasks with Negative Float A6450 Fixing Concrete collar 0
Tasks with Negative Float A6460 Install pipes in Span-8 0
Tasks with Negative Float A6480 Use Butt fusion welding 0
Tasks with Negative Float A6490 Fixing Concrete collar 0
Tasks with Negative Float A6500 Install pipes in Span-9 0
Tasks with Negative Float A6520 Use Butt fusion welding 0
Tasks with Negative Float A6530 Fixing Concrete collar 0
Tasks with Negative Float A6720 Use Butt fusion welding 0
Tasks with Negative Float A6560 Use Butt fusion welding 0
Tasks with Negative Float A6370 Fixing Concrete collar 0
Tasks with Negative Float A6580 Install pipes in Span-11 0
Tasks with Negative Float A6600 Use Butt fusion welding 0
Tasks with Negative Float A6610 Fixing Concrete collar 0
Tasks with Negative Float A6620 Install pipes in Span-12 0
Tasks with Negative Float A6640 Use Butt fusion welding 0
Tasks with Negative Float A6650 Fixing Concrete collar 0
Tasks with Negative Float A6660 Install pipes in Span-13 0
Tasks with Negative Float A6680 Use Butt fusion welding 0
Tasks with Negative Float A6690 Fixing Concrete collar 0
Tasks with Negative Float A6540 Install pipes in Span-10 0
Tasks with Negative Float A6220 Install pipes in Span-2 0
Tasks with Negative Float A6110 Connection of Sila shore to Offshore - Trench dredg0starting
Tasks with Negative Float A6120 Trench Dredging near Sila end, water depth <10m 0
Tasks with Negative Float A6140 Butt fusion welding of pipe 0
Tasks with Negative Float A6160 Fixing concrete colllars 0
Tasks with Negative Float A6180 Use butt fusion welding 0
Tasks with Negative Float A6190 Fixing concrete collar 0
Tasks with Negative Float A6400 Use Butt fusion welding 0
Tasks with Negative Float A6210 Install pipes in Span-1 0
Tasks with Negative Float A6380 Install pipes in Span-6 0
Tasks with Negative Float A6240 Use butt fusion welding 0
Tasks with Negative Float A6250 Fixing concrete collar 0
Tasks with Negative Float A6260 install pipes in Span-3 0
Tasks with Negative Float A6280 Use Butt fusion welding 0
Tasks with Negative Float A6290 Fixing concrete collar 0
Tasks with Negative Float A6300 Install pipes in Span-4 0
Tasks with Negative Float A6320 Use Butt fusion welding 0
Tasks with Negative Float A6330 Fixing Concrete collar 0
Tasks with Negative Float A6340 Install pipe in Span-5 0
Tasks with Negative Float A6360 Use Butt fusion welding 0
Tasks with Negative Float A6730 Fixing Concrete collar 0
Tasks with Negative Float A6200 Install Pipe in Sila shore 0
Tasks with Negative Float A7090 Fixing Concrete collar 0
Tasks with Negative Float A7100 Install pipes in Span-24 0
Tasks with Negative Float A7110 Connection of Offshore to Yasat shore - Trench dredging
0 near yasat
Tasks with Negative Float A7130 Use butt fusion welding 0
Tasks with Negative Float A7140 Install concrete collar 0
Tasks with Negative Float A7150 Install HDPE pipes 0
Tasks with Negative Float A6150 Fixing concrete Collars/Ballasts 0
Tasks with Negative Float A7170 Hydrostatic pressure testing 0
Tasks with Negative Float A6700 Install pipes in Span-14 0
Tasks with Negative Float A7050 Fixing Concrete collar 0
Tasks with Negative Float A7210 Install Buoys 0
Tasks with Negative Float A7220 Install shore end protection (Fixing Rocks) 0
Tasks with Negative Float A6900 Install pipes in Span-19 0
Tasks with Negative Float A6740 Install pipes in Span-15 0
Tasks with Negative Float A6760 Use Butt fusion welding 0
Tasks with Negative Float A6770 Fixing Concrete collar 0
Tasks with Negative Float A6780 Install pipes in Span-16 0
Tasks with Negative Float A6800 Use Butt fusion welding 0
Tasks with Negative Float A6810 Fixing Concrete collar 0
Tasks with Negative Float A6820 Install pipes in Span-17 0
Tasks with Negative Float A6840 Use Butt fusion welding 0
Tasks with Negative Float A6850 Fixing Concrete collar 0
Tasks with Negative Float A6860 Install pipes in Span-18 0
Tasks with Negative Float A7080 Use Butt fusion welding 0
Tasks with Negative Float A6890 Fixing Concrete collar 0
Tasks with Negative Float A7060 Install pipes in Span-23 0
Tasks with Negative Float A6920 Use Butt fusion welding 0
Tasks with Negative Float A6930 Fixing Concrete collar 0
Tasks with Negative Float A6940 Install pipes in Span-20 0
Tasks with Negative Float A6960 Use Butt fusion welding 0
Tasks with Negative Float A6970 Fixing Concrete collar 0
Tasks with Negative Float A6980 Install pipes in Span-21 0
Tasks with Negative Float A7000 Use Butt fusion welding 0
Tasks with Negative Float A7010 Fixing Concrete collar 0
Tasks with Negative Float A7020 Install pipes in Span-22 0
Tasks with Negative Float A7040 Use Butt fusion welding 0
Tasks with Negative Float A6880 Use Butt fusion welding 0
Tasks with Negative Float A5560 Trench Excavation for Pipe Laying 0
Tasks with Negative Float A4880 Testing & Commissioning - Pipe network at Sila 0
Milestones with Negative Float K-1100 End date - Project Handing Over 0
Milestones with Negative Float K-1010 Project Start- Site handing over 0
Tasks without resources A1000 Preperation & submission
Tasks without resources A1010 Review & recieve comments
Tasks without resources A1020 Incooperation of comments & submission
Tasks without resources A1030 Review & recieve approval
Tasks without resources A1040 Preperation & submission
Tasks without resources A1050 Review & recieve comments
Tasks without resources A1060 Incooperation of comments & submission
Tasks without resources A1070 Review & recieve approval
Tasks without resources A1080 Preperation & submission
Tasks without resources A1090 Review & recieve comments
Tasks without resources A1100 Incooperation of comments & submission
Tasks without resources A1110 Review & recieve approval
Tasks without resources A1120 Preperation & submission
Tasks without resources A1130 Review & recieve comments
Tasks without resources A1140 Incooperation of comments & submission
Tasks without resources A1150 Review & recieve approval
Tasks without resources SUR-OF-1040 Submission of survey reports
Tasks without resources SUR-OF-1050 Recieve approval for survey reports
Tasks without resources NOC-1010 Submission for NOC
Tasks without resources GP-1010 Obtain gate pass for Al Yaasat Island
Tasks without resources GP-1020 Obtain permits from developed of Yasat Island
Tasks without resources SI-OF-1020 Submission of soil investigation report
Tasks without resources SI-OF-1030 Recieve Approval for soil investigation report
Tasks without resources OF-SD-1010 Preperation & submission
Tasks without resources OF-SD-1020 Review & recieve comments
Tasks without resources OF-SD-1040 Review & recieve approval
Tasks without resources ON-EE-1010 Preperation & submission
Tasks without resources ON-EE-1020 Review & recieve comments
Tasks without resources ON-EE-1030 Incooperation of comments & submission
Tasks without resources ON-EE-1040 Review & recieve approval
Tasks without resources OF-SD-1030 Incooperation of comments & submission
Tasks without resources A1160 Preperation & submission
Tasks without resources A1170 Review & recieve comments
Tasks without resources A1180 Incooperation of comments & submission
Tasks without resources A1190 Review & recieve approval
Tasks without resources A1200 Preperation & submission
Tasks without resources A1210 Review & recieve comments
Tasks without resources A1220 Incooperation of comments & submission
Tasks without resources A1230 Review & recieve approval
Tasks without resources A1240 Preperation & submission
Tasks without resources A1250 Review & recieve comments
Tasks without resources A1260 Incooperation of comments & submission
Tasks without resources A1270 Review & recieve approval
Tasks without resources A1280 Preperation & submission
Tasks without resources A1290 Review & recieve comments
Tasks without resources A1300 Incooperation of comments & submission
Tasks without resources A1310 Review & recieve approval
Tasks without resources A1320 Preperation & submission
Tasks without resources A1330 Review & recieve comments
Tasks without resources A1340 Incooperation of comments & submission
Tasks without resources A1350 Review & recieve approval
Tasks without resources A1360 Preperation & submission
Tasks without resources A1370 Review & recieve comments
Tasks without resources A1380 Incooperation of comments & submission
Tasks without resources A1390 Review & recieve approval
Tasks without resources A1400 Preperation & submission
Tasks without resources A1410 Review & recieve comments
Tasks without resources A1420 Incooperation of comments & submission
Tasks without resources A1430 Review & recieve approval
Tasks without resources A1440 Preperation & submission
Tasks without resources A1450 Review & recieve comments
Tasks without resources A1460 Incooperation of comments & submission
Tasks without resources A1470 Review & recieve approval
Tasks without resources A1480 Preperation & submission
Tasks without resources A1490 Review & recieve comments
Tasks without resources A1500 Incooperation of comments & submission
Tasks without resources A1510 Review & recieve approval
Tasks without resources A1520 Preperation & submission
Tasks without resources A1530 Review & recieve comments
Tasks without resources A1540 Incooperation of comments & submission
Tasks without resources A1550 Review & recieve approval
Tasks without resources A1560 Preperation & submission
Tasks without resources A1570 Review & recieve comments
Tasks without resources A1580 Incooperation of comments & submission
Tasks without resources A1590 Review & recieve approval
Tasks without resources A1600 Preperation & submission
Tasks without resources A1610 Review & recieve comments
Tasks without resources A1620 Incooperation of comments & submission
Tasks without resources A1630 Review & recieve approval
Tasks without resources A1640 Preperation & submission
Tasks without resources A1650 Review & recieve comments
Tasks without resources A1660 Incooperation of comments & submission
Tasks without resources A1670 Review & recieve approval
Tasks without resources A1680 Preperation & submission
Tasks without resources A1690 Review & recieve comments
Tasks without resources A1700 Incooperation of comments & submission
Tasks without resources A1710 Review & recieve approval
Tasks without resources A1720 Preperation & submission
Tasks without resources A1730 Review & recieve comments
Tasks without resources A1740 Incooperation of comments & submission
Tasks without resources A1750 Review & recieve approval
Tasks without resources A1760 Preperation & submission
Tasks without resources A1770 Review & recieve comments
Tasks without resources A1780 Incooperation of comments & submission
Tasks without resources A1790 Review & recieve approval
Tasks without resources A2470 Handing Over
Tasks without resources A2540 Dellivery of Distribution Boards
Tasks without resources A2600 Dellivery of Bedding Material/Black sand
Tasks without resources A2620 Dellivery of Mix design
Tasks without resources A2630 Dellivery of Reinforced steel
Tasks without resources A2680 Dellivery of Concrete Colllars/ Ballats
Tasks without resources A2720 Material Submital of HDPE Pipes & Fittings
Tasks without resources A2740 Material Submital of DI Pipes & Fittings
Tasks without resources A2780 Material Submital of Valves & Fittings
Tasks without resources A2790 Material Submital of LV Power Cables
Tasks without resources A2800 Material Submital of GRP Tank
Tasks without resources A2810 Material Submital of DI Cover & Frame
Tasks without resources A2820 Material Submital of GRP Kiosks
Tasks without resources A2840 Material Submital of Bedding Material/Black sand
Tasks without resources A2860 Material Submital of Mix design
Tasks without resources A2870 Material Submital of Reinforced steel
Tasks without resources A2880 Material Submital of Dstribution boards
Tasks without resources A2900 Material Submital of Aluminium Surface box
Tasks without resources A2910 Material Submital of Surge vessel
Tasks without resources A2920 Material Submital of Concrete Colllars/ Ballats
Tasks without resources A2930 Material Submital of Buoys
Tasks without resources A2940 Material Submital of Dismantling Joints
Tasks without resources A2950 Material Approval for HDPE Pipes & Fittings
Tasks without resources A3140 Material Approval for DI Pipes & Fittings
Tasks without resources A3160 Dellivery of Distribution Boards
Tasks without resources A3280 Preperation & submission
Tasks without resources A3290 Review & recieve comments
Tasks without resources A3300 Incooperation of comments & submission
Tasks without resources A3310 Review & recieve approval
Tasks without resources A3260 Material Submital of Flange Adapters
Tasks without resources A3270 Material Submital of Basket Strainer
Tasks without resources A3640 Material Submital of Aluminium Sealing Flange
Tasks without resources A3650 Material Submital of Step Coupling with all Accessories
Tasks without resources A3660 Material Submital of Earthing Material
Tasks without resources A3670 Material Submital of Water Proofing Material
Tasks without resources A3680 Material Submital of Pipeline Corrossion Protection Material
Tasks without resources A3700 Material Approval for Valves & Fittings
Tasks without resources A3710 Material Approval for LV Power cable
Tasks without resources A3720 Material Approval for GRP Tank
Tasks without resources A3730 Material Approval for DI Cover & Frame
Tasks without resources A3740 Material Approval for GRP Kiosks
Tasks without resources A3750 Material Approval for Chamber Accessories
Tasks without resources A3760 Material Approval for Bedding Material/Black sand
Tasks without resources A3770 Material Approval for Mix design
Tasks without resources A3780 Material Approval for Reinforced steel
Tasks without resources A3790 Material Approval for Dstribution boards
Tasks without resources A3800 Material Approval for Aluminium Surface box
Tasks without resources A3810 Material Approval for Surge vessel
Tasks without resources A3820 Material Approval for Concrete Colllars/ Ballats
Tasks without resources A3830 Material Approval for Buoys
Tasks without resources A3840 Material Approval for Dismantling Joints
Tasks without resources A3850 Material Approval for Flange Adapters
Tasks without resources A3860 Material Approval for Basket Strainer
Tasks without resources A3870 Material Approval for Aluminium Sealing Flange
Tasks without resources A3880 Material Approval for Step Coupling with all Accessories
Tasks without resources A3890 Material Approval for Earthing Material
Tasks without resources A3900 Material Approval for Pipeline Corrossion Protection Material
Tasks without resources A3910 Preperation & submission
Tasks without resources A3920 Review & recieve comments
Tasks without resources A3930 Incooperation of comments & submission
Tasks without resources A3940 Review & recieve approval
Tasks without resources A3990 Preperation & submission
Tasks without resources A4000 Review & recieve comments
Tasks without resources A4010 Incooperation of comments & submission
Tasks without resources A4020 Review & recieve approval
Tasks without resources A3320 Dellivery of Pipeline corrossion material
Tasks without resources A3340 Dellivery of Aluminium sealing flange
Tasks without resources A3350 Dellivery of Basket Strainer
Tasks without resources A3500 Dellivery of Flange Adapters
Tasks without resources A4220 Dellivery of Dismantling Joints
Tasks without resources SUR-SL-1020 Submission of site survey report at Sila
Tasks without resources SUR-SL-1030 Approval of site survey report at Sila
Tasks without resources SUR-YS-1020 Submission of topographical survey report at Al Yasat
Tasks without resources SUR-YS-1030 Approval of site survey report at Al Yasat
Tasks without resources A4230 Prequalification of subcontractor submittal for NDRC
Tasks without resources A4240 Prequalification of subcontractor approval for for NDRC
Tasks without resources A4250 Prequalification of subcontractor submittal for Survey works
Tasks without resources A4260 Prequalification of subcontractor approval for Survey works
Tasks without resources A4950 Material Submital of Polythelene sheet
Tasks without resources A4960 Material Submital of Concrete Repairing / finishing material
Tasks without resources A4970 Material Submital of polyseal ps
Tasks without resources A4980 Material Submital of PVC waterstop
Tasks without resources A4990 Material Submital of skid
Tasks without resources A5000 Material Submital of sign board
Tasks without resources A5010 Material Submital of cable tile
Tasks without resources A5020 Material Submital of service turrent
Tasks without resources A5030 Material Submital of instrumentation and control materials
Tasks without resources A5080 Material Approval for Polythelene sheet
Tasks without resources A5090 Material Approval for Concrete Repairing / finishing material
Tasks without resources A5100 Material Approval for polyseal ps
Tasks without resources A5110 Material Approval for PVC waterstop
Tasks without resources A5120 Material Approval for skid
Tasks without resources A5130 Material Approval for sign board
Tasks without resources A5140 Material Approval for cable tile
Tasks without resources A5150 Material Approval for service turrent
Tasks without resources A5160 Material Approval for instrumentation and control materials
Tasks without resources A5780 Manufacture of HDPE Pipes
Tasks without resources A5790 Manufacture of HDPE Fittings
Tasks without resources A5800 Manufacture of DI Pipes
Tasks without resources A5810 Manufacture of DI Fittings
Tasks without resources A5820 Manufacture of Distribution Boards
Tasks without resources A5830 Manufacture of LV Power Cables
Tasks without resources A5840 Manufacture of GRP Tank
Tasks without resources A5850 Manufacture of DI Cover & Frame
Tasks without resources A5860 Manufacture of GRP Kiosks
Tasks without resources A5870 Manufacture of Bedding Material/Black sand
Tasks without resources A5880 Manufacture of Mix design
Tasks without resources A5890 Manufacture of Reinforced steel
Tasks without resources A5900 Manufacture of Valve & Fittings
Tasks without resources A5910 Manufacture of Concrete Colllars/ Ballats
Tasks without resources A5920 Manufacture of Chamber Accessories
Tasks without resources A5930 Manufacture of Distribution Boards
Tasks without resources A5940 Manufacture of Control Valves
Tasks without resources A5950 Manufacture of Aluminium Surface box
Tasks without resources A5960 Manufacture of Surge vessel
Tasks without resources A5970 Manufacture of Buoys
Tasks without resources A5980 Manufacture of Aluminium Vent Pipe
Tasks without resources A5990 Manufacture of Instrumentation Valves
Tasks without resources A6000 Manufacture of Earthing Materials
Tasks without resources A6010 Manufacture of Pipeline corrossion materiaol
Tasks without resources A6020 Manufacture of Step coupling with all Accessories
Tasks without resources A6030 Manufacture of Aluminium sealing flange
Tasks without resources A6040 Manufacture of Basket Strainer
Tasks without resources A6050 Manufacture of Flange Adapters
Tasks without resources A6060 Manufacture of Dismantling Joints
Tasks without resources A6230 Disposing of excavated material
Tasks without resources A7180 Disinfection
Tasks without resources A7190 Install dangerous sign board at sila and yasat
Tasks without resources A7200 Cleaning & Gauging of water pipe
Tasks without resources A7210 Install Buoys
Tasks without resources A7220 Install shore end protection (Fixing Rocks)
Tasks without resources A6270 Install shore end protection (Fixing Rocks)
Tasks without resources A7300 Use Rilway to Transportation of Pipes Sila to Boats