RENOVATION AND MODERNIZATION

3 1
Layout of wastewater treatment facilities 2
7 3
7
4

5
8

4
5 Existing wastewater treatment facilities:
6 1. Wastewater feed pumping station
2. Mechanical screen
6
3. Grit chambers
4. Primary settling tank
5. Aeration tanks
6. Secondary settling tank
7. Grit drainage area
8. Sludge drainage area
Equipment of wastewater feed pumping stations
capacity of 3 up to 500 m3/hour

1 The set of the equipment includes all components


for turn-key renovation.
Fully automated operation, programmable capacity,
control by mobile link.

Container type blocks of mechanical treatment


3
capacity of 20 up to 500 m /hour
Screening ® screenings washing ® dewatering
2 Grit removal ® grit washing ® dewatering
The containers are equipped with heating,
ventilation and lighting systems.
Automatic control by means of mobile link.

Equipment for coagulants preparation, storage and dosing


capacity of 1 up to 200 l/hour
3 Dry coagulant dilution plants
Liquid coagulant storage tanks
Coagulant dosing stations

Secondary biological treatment biotanks


of pretreated wastewater
4 3
capacity of 60 up 3,600 m /day
Bio-oxidation tanks
Nitri-denitrification tanks

- Tertiary sedimentation tanks for phosphorus


chemical removal
capacity of 14 up to 85 m3/hour
5 Automatic control
- Slow open filters for advanced tertiary treatment
3
capacity of 10 up to 100 m /hour
Automatic control
Effluent disinfection units

6 capacity of 1 up to 50 m3/hour
Effluent disinfection in thin layer by non-submerged
(dry) ultraviolet light lamps

Sediment dewatering stations


capacity of 36 up to 500 kg*/day
Dewatering with capacity of 36 up to 192 kg*/day
is realized in filtration sacks.
Dewatering with capacity of 200 up to 500 kg*/day
7 is realized on a belt filter press.
* kg by dry matter

Equipment is located in container type modules


equipped with heating, ventilation and electrical
systems.