You are on page 1of 2

BIPL, RANJANGAON, PROJECTS - 2015

CHECK LIST(PRE ENTRY) FOR ARC WELDING MACHINE


-
Contractor Name Machine No Date Month

6 2 2
1

5
4 3
8

SL SL
CHECK ITEM PHOTOS Y/N CHECK ITEM PHOTOS Y/N
NO NO

ON / OFF knob is
Regulator with
provided(Check for
1 damage and
2 indicator is
provided
uninsulated knob)

Welding cables
connected to the No damage in the
3 welding machine 4 insulation of
with lugs at the welding cables
joints

Electrode rod Industrial type Plug


holder and earthing for power tapping
5 holder are without
6
cable of welding
damage machine

Fire extinguisher
Trolley without
7 and fire bucket with 8
damaged wheels
sand availability

Inspected by contractor Safety Officer Checked by consultant Safety Officer


YES(Y)

NO(N) X