You are on page 1of 1

CHECK LIST FOR WELDING MACHINE

MONTH OF CHECK: CONTRACTOR NAME: DOC. NO:

CHECK LIST
SL NO DESCRIPTION 1st week 2nd Week 3rd Week 4th Week 5th Week Remarks
ON / OFF knob is
provided(Check for damage
1
and Uninsulated knob)

Regulator with indicator


2 is provided
Welding cables connected
3 to the welding machine with
lugs at the joints

No damage in the
4
insulation of welding cables

Electrode rod holder and


earthling holder are
5
without damage (Insulation
must)
Industrial type Plug
6 for power tapping
cable of welding
machine

7 Cooling fan

Welding machine body


8
earthing
Fire extinguisher and fire
9 bucket with sand availability

Checked by Project Engineer

Verified by Safety Officer

You might also like