Hazard Identification & Risk Assessment (HIRA) Register

Name of the Job Site: Amazon Hayatabad, Hyderabad PROJECT Date: -


Activity: ABS PHE Store & Office Construction Ref. No: - HIRA/ABS/Amazon Project/

I have read and understood the


Accepted/ Received by
HIRA Team Members Prepared by Reviewed by Approved by contents (communicated down
(agreed for implementation)
the line)

Site Package
EHS Manager- URC
Name & role: Engineer- EHS-ABS manager- URC URC CONSTRUCTIONS In charge Project Manager- ABS
CONSTRUCTIONS
ABS CONSTRUCTIONS

Signature

Indicate Critical control points (CCP) for this HIRA: -


1. Implement all Electrical connections as per Electrical SOP.
2. Power tool to be used only after inspection by P&M/EHS
3. Ensure Safety harness while working at height.
4. Scaffold tag to be ensured

Po
Hazardous pul
Event ati
Probabili Severity Risk Residual Action
Sl No Activity Hazards on Existing Control Measure Additional Control Measures
Possible Outcome ty Rating Rating Level Risk By
at
ris
k
Site
 Height work training Engine
 Illumination should be
should be conducted er/Proj
maintained ect
prior to start the job.
 Three-point contact maintained engine
 Workers must use
 Fall of Musculoskeletal  Scaffolding made as per er
appropriate PPEs like
materials injuries to the scheme diagram
(Safety harness, Hand
from hand workers,  Safe handling of materials
Vertical  Trip gloves) which should
 Fall of should be ensured.
jacks be ensured by
1 hazard person, Cut injury,
placing 06 2 3 6(M)  Proper supervision should be 1
 Person material concerned engineer
with base providing
plate can fall  Trip  Permit should be
from Injury requiring  Site access should be clear
Hazard obtained with
height Medical treatment Work Proper housekeeping
approval, prior
 Noise Property damage shall be done at working area.
hazard commence of work.
 Access should be clear from
 Tool box talk should
obstructions
conduct before
 Worker should be medically fit
starting the work

2 Fixing of  Fall of  Hit Musculoskeletal 06 2 2 4(L)  Adequate Personal  Work Permit should 1 Site
horizontal materials Hazard injuries to the protective equipment shall be obtained with Engine
MS Angles from hand workers, approval prior er/Proj
 Fall of be used.(Safety harness and
and Square  Men & ect
hand gloves) commence of work.
material material engine
tube Cut injury,
Fall from s from  Height work training should er
height  TBT should be
hand be conducted prior to start
 Trip Injury requiring conducted prior to
 Trip the job.
hazards Medical treatment start the job.
 Noise hazard  The job shall be performed
hazard  Excess by competent / trained
 Proper housekeeping
noise personnel under competent
shall be done at
supervision.
working area.
 A full boy Safety harness
 Do not stack material
shall be used for working at
in site access
height.
 Inspected Ladder should be
use.
 One person should be hold
on the Ladder while working.
 Adequate illumination will
be maintained during
execution of job.
 Adequate illumination will
be maintained during
execution of job.
 Working at height permit
shall be obtained from site
engineers
 Access should be clear from
obstructions

3 Cutting of  Fire and  Electrical Cut injury, 06 2 2 4(L)  Keep a fire extinguisher in 1 Site
MS explosio Hazard. working area. Engine
 Only experienced &
channel, n (linked er/Proj
MS angles,  Fire Injury requiring  Ensure combustible Materials well-trained worker
to the ect
Square Hazard Medical treatment should be removed from the only carried out the
amount engine
tube 40mm working area. job.
and Dust inhalation er
 Fumes &  Equipment’s Monthly colour  Proper Personal
nature Eye Irritation
flames coding should be done. protective equipment
of
Welding  Fire guard (GI Sheet) should be should be used.
flammab  Trip
le placed in front of cutting (Hand gloves, Nose
hazard
material machine for protect from mask, Ear plug and
) fumes and flames. Goggles).
 Access should be clear from  Hot work training
 Electrici obstructions. should be conducted
ty prior to start the job.
 B licensed electrician should be
deployed to take care of  Wear appropriate
clothing which
electrical safety
protects skin while
 No cable joints are allowed cutting.
 Plug tops should be provided to
 Tool box talk conduct
each and every power cable before start the work
 Should not use Two machines
with one cable
 MCCB, RCCB has to be installed
to the power distribution board
 Should Conduct Trainings
Regarding Electrical Safety
 MCCB, RCCB should check once
in two weeks with the test kit
 Electrical boards should not
place at floor edge or water
stagnate area
 All electrical cables to be over
routed or take aside from the
water or man moment area

Work Permit should be Site


 Only experienced & well Engine
 Trip obtained with approval,
trained worker only carried out er/Proj
hazard Musculoskeletal prior commence of
the job. ect
 Fall of injuries to the work. engine
 Provide safe working platform
person workers, er
for working at height.
Clamping from
 Proper Personal protective
of Square  Slippery height Job specific PPE should
or Cut injury, equipment should be used.
4 tube  Fall of 06 2 1 2(L) be used. 1
uneven (Hand gloves and safety
horizontall ground materi Harness).
y als Injury requiring
Medical treatment  Height work training should be Tool box talk conduct
from conducted prior to start the
hand Property before start the work
job.
 Hit damage  Tool box talk conduct before
hazard start the work .

5
GI Sheet  Slippery  Trip Injury requiring 06 2 1 2(L)  Job shall be performed by  Proper PPE should 1 Site
fixing with or hazard Medical treatment, competent / trained personnel be used. Engine
screws uneven  Fall of Cut injury, under competent supervision. er/Proj
ground person  Tool box talk conduct
Musculoskeletal  Full body Safety harness shall ect
from before start the engine
injuries to the be used for working at height.
 Excess height work. er
Noise  Fall of workers, Property  Inspected Ladder should be  Height work training
material Damage use, Scaffold made as per should be conducted
s from scheme diagram prior to start the job.
hand  One person should be hold on
 Working at height
permit shall be
obtained from site
the Ladder while working. engineers.
 Noise  illumination will be maintained
hazard during execution of job.
 Access should be clear from
obstructions.

 Safe handling of materials  Height work training Site


should be ensured. should be conducted Engine
 Slippery  Trip  Screws fix by hand tools prior to start the job. er/Proj
or hazard Musculoskeletal  Proper supervision should be  Workers must use ect
uneven  Fall of injuries to the provided. appropriate PPEs like engine
Making of ground person workers, er
 Full boy Safety harness shall be (Safety harness, Hand
Racks by MS from used for working at height. gloves) which should
Angle and  Excess height
Cut injury, 06 2 1 2(L)  Adequate illumination will be be ensured by 1
6 plywood and Noise  Fall of
maintained during execution of concerned engineer.
stacking of material
materials s from Injury requiring job.
 Fall from hand Medical treatment  Access should be clear from  Work Permit should
rack Property damage obstructions be obtained with
 Hit
hazard  Materials should be stacked in approval, prior
safe manner to avoid slipping commence of work.
of materials
7 Hit
Usage of   Fall of Injury requiring 06 2 2 4(L)  Daily Inspection of tools shall  Inspection shall be Site
Hazard
hand tools material medical treatment be carried out before using for done on weekly basis Engine
 Fall of
tools s from operation. & Inspection tag shall er/Proj
(hammer,
hand ect
 Manual  Only competent person to do be displayed.
Pliers,  Hit engine
handling the work  Select Right tool for
screwdriver, hazard er
screw,  Electricity  Check for cracks or damage. the job.
 Damage
wrenches….) d tools,  Electrical cables shall be routed  Homemade tools
imprope properly to avoid trip hazards should not be used.
r  RCCB has to be used.  Proper PPE should be
handling  No cable joints are allowed used.
 Plug tops should be provided to
each and every power cable
 Electrica  Should not use Two machines
with one cable  Tool box talk conduct
l hazard
 MCCB, RCCB has to be installed before start the work
to the power distribution board

___________________________________________________
Project Manager / Section In-charge EHSO