Site Package
EHS Manager- URC
Name & role: Engineer- EHS-ABS manager- URC URC CONSTRUCTIONS In charge Project Manager- ABS
CONSTRUCTIONS
ABS CONSTRUCTIONS
Signature
Po
Hazardous pul
Event ati
Probabili Severity Risk Residual Action
Sl No Activity Hazards on Existing Control Measure Additional Control Measures
Possible Outcome ty Rating Rating Level Risk By
at
ris
k
Site
Height work training Engine
Illumination should be
should be conducted er/Proj
maintained ect
prior to start the job.
Three-point contact maintained engine
Workers must use
Fall of Musculoskeletal Scaffolding made as per er
appropriate PPEs like
materials injuries to the scheme diagram
(Safety harness, Hand
from hand workers, Safe handling of materials
Vertical Trip gloves) which should
Fall of should be ensured.
jacks be ensured by
1 hazard person, Cut injury,
placing 06 2 3 6(M) Proper supervision should be 1
Person material concerned engineer
with base providing
plate can fall Trip Permit should be
from Injury requiring Site access should be clear
Hazard obtained with
height Medical treatment Work Proper housekeeping
approval, prior
Noise Property damage shall be done at working area.
hazard commence of work.
Access should be clear from
Tool box talk should
obstructions
conduct before
Worker should be medically fit
starting the work
2 Fixing of Fall of Hit Musculoskeletal 06 2 2 4(L) Adequate Personal Work Permit should 1 Site
horizontal materials Hazard injuries to the protective equipment shall be obtained with Engine
MS Angles from hand workers, approval prior er/Proj
Fall of be used.(Safety harness and
and Square Men & ect
hand gloves) commence of work.
material material engine
tube Cut injury,
Fall from s from Height work training should er
height TBT should be
hand be conducted prior to start
Trip Injury requiring conducted prior to
Trip the job.
hazards Medical treatment start the job.
Noise hazard The job shall be performed
hazard Excess by competent / trained
Proper housekeeping
noise personnel under competent
shall be done at
supervision.
working area.
A full boy Safety harness
Do not stack material
shall be used for working at
in site access
height.
Inspected Ladder should be
use.
One person should be hold
on the Ladder while working.
Adequate illumination will
be maintained during
execution of job.
Adequate illumination will
be maintained during
execution of job.
Working at height permit
shall be obtained from site
engineers
Access should be clear from
obstructions
3 Cutting of Fire and Electrical Cut injury, 06 2 2 4(L) Keep a fire extinguisher in 1 Site
MS explosio Hazard. working area. Engine
Only experienced &
channel, n (linked er/Proj
MS angles, Fire Injury requiring Ensure combustible Materials well-trained worker
to the ect
Square Hazard Medical treatment should be removed from the only carried out the
amount engine
tube 40mm working area. job.
and Dust inhalation er
Fumes & Equipment’s Monthly colour Proper Personal
nature Eye Irritation
flames coding should be done. protective equipment
of
Welding Fire guard (GI Sheet) should be should be used.
flammab Trip
le placed in front of cutting (Hand gloves, Nose
hazard
material machine for protect from mask, Ear plug and
) fumes and flames. Goggles).
Access should be clear from Hot work training
Electrici obstructions. should be conducted
ty prior to start the job.
B licensed electrician should be
deployed to take care of Wear appropriate
clothing which
electrical safety
protects skin while
No cable joints are allowed cutting.
Plug tops should be provided to
Tool box talk conduct
each and every power cable before start the work
Should not use Two machines
with one cable
MCCB, RCCB has to be installed
to the power distribution board
Should Conduct Trainings
Regarding Electrical Safety
MCCB, RCCB should check once
in two weeks with the test kit
Electrical boards should not
place at floor edge or water
stagnate area
All electrical cables to be over
routed or take aside from the
water or man moment area
5
GI Sheet Slippery Trip Injury requiring 06 2 1 2(L) Job shall be performed by Proper PPE should 1 Site
fixing with or hazard Medical treatment, competent / trained personnel be used. Engine
screws uneven Fall of Cut injury, under competent supervision. er/Proj
ground person Tool box talk conduct
Musculoskeletal Full body Safety harness shall ect
from before start the engine
injuries to the be used for working at height.
Excess height work. er
Noise Fall of workers, Property Inspected Ladder should be Height work training
material Damage use, Scaffold made as per should be conducted
s from scheme diagram prior to start the job.
hand One person should be hold on
Working at height
permit shall be
obtained from site
the Ladder while working. engineers.
Noise illumination will be maintained
hazard during execution of job.
Access should be clear from
obstructions.
___________________________________________________
Project Manager / Section In-charge EHSO