You are on page 1of 1

GENERAL NOTES

A. THIS IS PERFORMANCE SYSTEM, THE


DRAWING IS FOR REFERENCE,
CONTRACTOR IS RESPONSIBLE FOR
DETAIL DESIGN.

KEYED NOTES:
1. - INSULATION SHALL BE PROVIDED FOR THE
PCW SUPPLY/RETURN PIPES (MAINS &
SUBMAINS), HEAT EXCHANGER (HX), AND
CHILLED WATER SUPPLY & RETURN PIPES
TO THE HX.
2. - GC TO PROVIDE THE LOTO DEVICE FOR
THE MANUAL VALVE

REV DATE DESCRIPTION by chkd. appd. client

SSMC ANNEX 10 EXPANSION (PHASE 3)

JTC Corporation
The JTC Summit 8 Jurong Town Hall Road
Singapore 609 434
TEL:(65) 6560 0056, FAX:(65) 6565 5301
www.jtc.gov.sg

Systems on Silicon Manufacturing Co. Pte Ltd


70 Pasir Ris Industrial Drive 1, Singapore 519527.
Tel: 65-62487000

JACOBS INTERNATIONAL CONSULTANTS PTE LTD.


150, Beach Road, Gateway West, 34th Floor, Singapore 189720
Tel: +65 6391 0350 Fax: +65 6299 4739

MAIN FAB
ADMIN

MAIN CUB
WAREHOUSE
AMHS LINK BRIDGE
ANNEX 10 FAB

CUB

N
Copyright reserved @ JACOBS INTERNATIONAL CONSULTANTS PTE LTD.

You might also like