You are on page 1of 1

650

T1 - (Ø12 -8 NOS.) 4 NOS HOLE Ø26 THRU. Rev.


No.
Date Revision Description

ON 285 P.C.D. EQUISPACED R1 15-03-2022 FINAL DESIGN

650

T2 - (Ø8 190 C/C)

300 SQ.
SECTION B-B

Ø150
Customer :
650 4 NOS. M24 x 750LG. Patna Smart City Ltd.
FOUNDATION J. BOLTS
ON 285 P.C.D. System Integrator :
100

F.G.L. F.G.L. L&T Smart World


TEMPLATE 3 THK. Safe & Smart Cities | Communication
SCALE 1 : 7 Project Name :
Ø50 PVC PIPE FOR
CABLE ENTRY Selection of Master Systems Integrator (MSI) to Design,
Development, Implementation, Operations & Maintenance of
Command and Control Centre (CCC), CCTV Surveillance, Smart
Traffic Solution and Integration of various ICT components with
B B Integrated Command and Control Center Platform (ICCC)
GENERAL NOTES :-
Drawing No. Rev.
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
T1 - Ø12 - 8 NOS POB-LE21M915-TEDD-ED-2600-0005 1
2. MATERIAL & CONSTRUCTION TO BE IN ACCORDANCE WITH IS :
1300

456 Document Name:


1200

3. THE CONCRETE GRADE FOR FOUNDATION & OTHER WORKS ATCS System Standard Pole Foundation Drawing
SHALL BE MIX M25
T2 - Ø8 AT 190 C/C 4. IT IS ASSUMED THAT SOIL TYPE IS NORMAL HARD DRY SOIL Scale : N.T.S. Sheet : 001/001
A. THE SOIL BEARING CAPACITY IS 10 T/M² AT 1.2M BELOW G.L. PDMC's Approval with Stamp Signature & Date
B. ANGLE OF REPOSE 30°
C. DENSITY OF SOIL 1.85 T/M³
D. BASIC WIND SPEED : 47 M/SEC.
5. REINFORCEMENT SHALL BE OF GRADE Fe415 COMPLYING WITH
IS : 1786-1985 Client's Approval with Stamp Signature & Date
6. CLEAR COVER TO MAIN REINFORCEMENT AT END OF MAIN BARS
COLUMN : 40m.
7. DEVELOPMENT LENGTH FOR TENSION LDT=50 TIMES THE DIA OF
BAR.
8. FOR ANY OTHER DETAILS CLAUSES OF IS-456, SP-34 & SP-23
650 SHALL BE REFERRED. Pre. By Rew. By Apr. By
9. IT IS ASSUMED THAT WATER TABLE IS NOT FOUND, IF FOUND
ELEVATION HL MP SP
PLEASE APPROACH TLL FOR REVISED DESIGN DRAWING.