650

4 NOS HOLES Ø27 THRU.


ON 360 P.C.D. EQUISPACED
T1 - (Ø12 -8 NOS.) Rev. Date Revision Description
No.
R1 15-03-2022 FINAL DESIGN

650 T2 - (Ø8 190 C/C)

370 SQ.
SECTION B-B

Ø275
650 4 NOS. M25 x 800LG.
FOUNDATION J. BOLTS Customer :
ON 360 P.C.D.
Patna Smart City Ltd.
100

F.G.L. F.G.L.
System Integrator :
Ø50 PVC PIPE FOR 3 THK.
CABLE ENTRY TEMPLATE L&T Smart World
SCALE 1 : 7 Safe & Smart Cities | Communication
B B Project Name :
Selection of Master Systems Integrator (MSI) to Design,
Development, Implementation, Operations & Maintenance of
T1 - Ø12 - 8 NOS Command and Control Centre (CCC), CCTV Surveillance, Smart
Traffic Solution and Integration of various ICT components with
Integrated Command and Control Center Platform (ICCC)
GENERAL NOTES :-
T2 - Ø8 AT 190 C/C 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED. Drawing No. Rev.
2. MATERIAL & CONSTRUCTION TO BE IN ACCORDANCE WITH IS : POB-LE21M915-TEDD-ED-2600-0006
1800

1
456
1700

Document Name:
3. THE CONCRETE GRADE FOR FOUNDATION & OTHER WORKS
SHALL BE MIX M25 ATCS System Pole Foundation for 4.5Mtr Cantilever arm
4. IT IS ASSUMED THAT SOIL TYPE IS NORMAL HARD DRY SOIL
A. THE SOIL BEARING CAPACITY IS 10 T/M² AT 1.7M BELOW G.L. Scale : N.T.S. Sheet : 001/001
B. ANGLE OF REPOSE 30° PDMC's Approval with Stamp Signature & Date
C. DENSITY OF SOIL 1.85 T/M³
D. BASIC WIND SPEED : 47 M/SEC.
5. REINFORCEMENT SHALL BE OF GRADE Fe415 COMPLYING WITH
IS : 1786-1985
6. CLEAR COVER TO MAIN REINFORCEMENT AT END OF MAIN BARS
COLUMN : 40m.
Client's Approval with Stamp Signature & Date
7. DEVELOPMENT LENGTH FOR TENSION LDT=50 TIMES THE DIA OF
BAR.
8. FOR ANY OTHER DETAILS CLAUSES OF IS-456, SP-34 & SP-23
SHALL BE REFERRED.
9. IT IS ASSUMED THAT WATER TABLE IS NOT FOUND, IF FOUND
PLEASE APPROACH TLL FOR REVISED DESIGN DRAWING. Pre. By Rew. By Apr. By