Anitha
Bathroom Under Stair Case Labour + Materials and PVC Door 8500
Burgalow for Elevation & Over Head Elevation Centring Work 30000
Padauk Door + Window with Grill & (Flush Door For Kitchen) 53500
1st Floor Tiles Altered From Client Side ( Materials + Labour Loss ) 10000
Over Head Tank Position Change & Floor Plastering, Plumbing 1600
TOTAL 410860/-