N

PART-1 PART-2

KEYPLAN

GENERAL NOTES:

1. ALLDIMENSIONS ARE IN MILLIMETERS UNLESS SPECIFIED


OTHERWISE.
2. THIS DRAWING SHALLBE READ IN CONJUNCTION WITH ALLOTHER
MEP, CIVILS, STRUCTURAL AND ARCHITECTURAL TENDER
DRAWINGS, SPECIFICATIONS AND EQUIPMENT SCHEDULES.
3. FOR MECHANICAL SYMBOLS AND ABBREVIATIONS REFER TO:
OR4100-1-ATNM-MM2-DRW-6540901
4. CFSD TO BE PROVIDED FOR ALL DUCTWORK PENETRATIONS
THROUGH SLAB AND RISER OR SHAFT.
5. ALLTHE SUPLY AIR DIFFUSER PLENUM SHALLBE INTERNALLY
LINED WITH ACOUSTIC INSULATION.
6. FOR MECHANICAL STANDARD DETAILREFER TO: OR4100-1-ATNM-
MM2- DRW-6540911,ATNM-MM2-DRW-6540912
7. FOR DETAILS OF INDIVIDUAL ROOM AND GRILLE FLOW RATES
REFER TO THE MECHANICALSERVICES SCHEDULE OF
EQUIPMENT.
8. CONOENSATE DRAIN FROM THE AHU AND FCU TO BE
CONNECTED TO THE NEAREST DRAIN POINT. REFER
TO DRAINAGE LAYOUTS FOR CONOENSATE DRAIN
CONNECTIONS.OR4100-1-ATNM-MP2-DRW-5070326.
9. POWER SUPPLY TO THE AHU'SJFAU'S SHALL BE COORDINATED
WITH THE ELECTRICAL DRAWINGS.
10. THIS DRAWING SHALLBE COORDINATED WITH ALLOTHER
SERVICES & REFLECTING FALSE CEILING AND ARCHITECTURE.
11. MECHANICAL SPECIFICATION REFERENCE (OR4100-2-ATNM-MM1-
SPC-6540901 AND ACOUSTICS REPORT REFERENCE (OR4100-1-
ATNMRVO RPT-1510003) .
12. ALLRELATED HVAC EQUIPMENTS AND ACCESSORIES TO BE
INTERFACE WITH THE BMS & FIRE ALARM
13. DOOR UNDERCUT HEIGHT TO BE CO-ORDINATED WITH THE
ARCHITECTURAL LAYOUT.
14. DUCT SIZE & BOD I PIPE SIZE & BOP WITHOUT INSULATION.
15. DETAILS REGARDING MIO OF THE MEP RISER AREA SHALL BE
SUBMITTED SEPERATELY .
16. DUCT THERMAL INSULATION IN AIR CONDITIONING AREA IS 20
MM HICK XLPE NON AIR CONDITIONING AREA 30 MM THICK
XLPE, EXPOSE AREA 40 MM THICK XLPE.
17. ISOLATION ROOMS AIRFLOW SCHEME DEVELOPED ACCORDING
TO MOH / INSHA RFI (REF.NO.OR4100-1-ATNM-HVAC-RFI-00001)
RESPONSE.

40 FOR CONSTRUCTION VKT SS 12/11/2023


4A FOR REVIEW VKT SS 05/10/2023
Rev Description Dr'n Chk'd Date

Client

Consultant

Contractor

Lead Design Consultant / MEP Consultant

Structural / Civil Design Consultant

Architectural / Medical Planning Design Consultant

EOR/AOR Consultant

Project

Sultan Qaboos Hospital


Salalah

Drawing

Level 06 Mechanical Ventilation


& Air Conditioning Layout
Sheet 2 (Zone 2)
Drawing No. Rev
OR4100-1-ATNM-MM2-SDW-654060002 40
Status

FOR CONSTRUCTION
Drawn ● VKT Checked ● SS
Date ● 05/10/2023 Scale ● @ A1

You might also like