You are on page 1of 23

RWTP

RASAU WATER TREATMENT PLANT

PENGURUSAN AIR SELANGOR


SDN BHD
DESIGN CALCULATION SUBMISSION

DESIGN CALCULATION REPORT FOR

TABLE FORM AND LOOSE FORM

Reference No : RWTP-GB-PMD-DCL-000008

Revision : 00

Date : 17 April 2024

Action Name Designation Signature

Approved by Khor Thiam Chay Project Director

Consultant
Approved by Tan Jin Soon (Sepakat Setia
Perunding)

Construction
Reviewed by Suzanne Ng.
Manager

Reviewed by Syerifaizal QAQC Manager

Prepared by Nurul Hazwani Project Engineer


SG. RASAU WATER SUPPLY SCHEME (STAGE 1)
STRUCTURAL CALCULATION

DESIGN CALCULATION FOR


TABLE FORM & LOOSE FORM

PREPARED BY : YNY CONSULTING ENGINEER SDN BHD


NO. 74-1, JALAN SS 15/4B, 47500 SUBANG JAYA,
SELANGOR DARUL EHSAN, MALAYSIA.
DATE : 11th November 2023
REVISION :0
SG. RASAU TEMPORARY WORK – STRUCTURAL CALCULATION

TABLE OF CONTENTS

1 Introduction ......................................................................................................................... 1
2 Design Code and Reference ................................................................................................ 1
3 Design Criteria and Assumptions........................................................................................ 1
4 Design Calculations............................................................................................................. 2
5 Conclusion........................................................................................................................... 2

APPENDIX
Appendix A Analysis Result from Staad Pro
Appendix B Formwork Calculations
Appendix C Drawing
Appendix D Catalogue
SG. RASAU TEMPORARY WORK – STRUCTURAL CALCULATION

1 Introduction
The construction takes place at Sg. Rasau, and to construct reinforced concrete slab and beam. There
are two types of formwork system with varied materials. The aluminum formwork system consisted
of aluminum panel, c-channel, peri-up tower and jack base; whereas, timber formwork system
consisted of timber panel, c-channel, steel sections, peri-up tower and jack base, as well as aluminum
panel and nails as propping. This report will check the structural capacity of the proposed formwork.

2 Design Code and Reference


1.0 ACI Committee 347, Guide to Formwork for Concrete, ACI Standard; 2004.
2.0 BS 5950-Part 1 and Part 5:2000 - Structural use of steelwork in Building
3.0 BS 6399-Part 1:1984 - Design Loading for Building
4.0 BS 6975:2008 – Code of practice for temporary works procedures and the permissible
stress design of falsework

3 Design Criteria and Assumptions


1.0 Unless otherwise stated, all welding used for connection shall be capacity 220
N/mm2, or approved equivalent.
2.0 Assume material strength is as follow and shall be verified by supplier’s material
specification:
1) Aluminum Plate – py = 240 N/mm2
2) MS Steel Section – py = 275 N/mm2
3.0 The entire formwork system must be supported on firm and stable base.
4.0 Concreting method – The wet concrete shall be placed slowly and vibrated in layers
during the whole concreting process to avoid excessive loading to the formwork
system.
5.0 Wet concrete density and slump - assume 2400 kg/m3 and slump is 75 mm.
6.0 Induced force due to placing and vibration during concreting - assume 25% of wet
concrete self-weight.
7.0 The formwork is for concreting purpose only. Not to support concreting machine,
welding machine, gen-set etc.
8.0 Structural elements
8.1.1 4 mm thick aluminum panel
8.1.2 12 mm thick plywood panel (Fb = 5.3 N/mm2)
8.1.3 Timber Support

1
SG. RASAU TEMPORARY WORK – STRUCTURAL CALCULATION

i. Fb = 13.2 N/mm2
ii. Fc = 11.1 N/mm2
8.1.4 Steel member size used
i. 100 × 50 × 5 mm @ 9.36 kg/m (py = 275 N/mm2)
ii. 75 × 50 × 3 mm @ 5.59 kg/m (py = 275 N/mm2)
iii. 75 × 40 × 5 mm @ 6.92 kg/m (py = 275 N/mm2)
iv. 38 × 38 × 2.3 mm @ 2.54 kg/m (py = 275 N/mm2)
11.0 Loading Data
i. Dead load (DL)
Self-weight - Varied according to frame sections
ii. Imposed load (LL)
Construction Load - 1.5 kN/m2
iii. Combination Load
Combination Load 1 - 1.2 DL + 1.2 LL

4 Design Calculations
The design calculations for the formworks are exhibited in the Appendix A.

5 Conclusion
From the design calculation, the proposed formwork system is safe to be used for the casting of beam
and slab. The erection of the formwork must ensure the use of materials and accessories are comply to
the technical data or specification provided by respective manufacturer/supplier and should be in good
working condition. After the erection of formwork system, it must be inspected by site safety officer
before used by the workers.

2
SG. RASAU TEMPORARY WORK – STRUCTURAL CALCULATION

Appendix A
Table Form & Loose Form Calculations
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark

ACI Committee 347 Rasau Temporary Work - Table Form (Slab)


BS5950

Formwork

1 Mould Dimension And Loading

Slab thickness = 0.3 m


Concrete density = 24 kN/m3
Slab load = 7.2 kn/m2
DL Factor = 1.2
Factored DL = 8.64 kN/m2

Construction load = 1.5 kN/m2


LL Factor = 1.2
Factored LL = 1.80 kN/m2

Total factored load = 10.44 kN/m2

2 Check on Mould Plate

BS5950 Pressure on the plate = 10.44 kN/m2


Panel clear spanning length, L = 0.4 m

Ultimate moment, M = 0.047pL^2 = 0.079 kNm/m width


Ultimate shear, V = 0.49pL = 2.0 kN/m width
Deflection , d = M/ EI = 0.18 mm

Plate Width, b = 1000 mm Use


Use Aluminum Plate thickness, t = 4.0 mm E= 70 kN/mm2
Py= 240.0 N/mm2 I = bd3 / 12 = 5333 mm4 4 mm
Section modulus, Z = 2667 mm3 thk Aluminum Panel
Mc = Fb Z = 0.640 kNm/m width > M, ok
Shear thru the thickness, Fv = 144.00 N/mm2
Vc = Fv t = 576.00 kN/m width > V, ok
Allowable deflection, da = L/270 = 1.48 mm > d, ok

3 Check on Secondary Support (C-Channel)

Max. steel support spacing, Smax = 1.200 m


Max. clear span 1.500 m
UDL load, w = 12.53 kN/m
Moment, M = wL2 / 8 = 3.52 kNm
Ultimate shear, V = 0.6pL = 11.3 kN
Deflection , d = 5/384 (wL4 / EI) = 4.42 mm

BS5950 Use 75x40x5 6.92 kg/m CH Use


Diameter, D = 75 mm 75x40x5 6.92 kg/m
Thickness of web, tw = 5 mm CH
Gross Sectional area, Ag = 8.82 cm2 E= 205 kN/mm2
Radius of gyration, ry = 1.19 cm
Moment of inertia, Ixx = 75.90 cm4
Section modulus, Z = 20.20 cm3
Torsional index, x= 10.00
Buckling parameter, u = 0.942
lx = Le/rx = 50 l/x = 5.042017
v= 0.83
bw = 1
lLT = uvl/b w = 39
pb = 262 N/mm2 py = 275 N/mm2

Mc = pb Z = 5.29 kNm > M, ok


Vc = 0.6py Av = 61.9 kN > V, ok
Allowable deflection, da = L/270 = 5.56 mm > d, ok

Rasau Temporary Work - Formwork Calculation for Table Form/Table Form_slab 1/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark


3 Check on Primary Support (C-Channel)

Max. steel support spacing, Smax = 1.500 m


Max. support length, Lmax = 2.000 m
UDL load, w = 15.66 kN/m
Moment, M = wL2 / 8 = 7.83 kNm
Ultimate shear, V = 0.6pL = 18.8 kN
Deflection , d = 5/384 (wL4 / EI) = 7.02 mm

BS5950 Use 100x50x5 9.36kg/m CH Use


Diameter, D = 100 mm 100x50x5 9.36kg/m
Thickness of web, tw = 5 mm CH
Gross Sectional area, Ag = 11.92 cm2 E= 205 kN/mm2
Radius of gyration, ry = 3.98 cm
Moment of inertia, Ixx = 189.00 cm4
Section modulus, Z = 37.80 cm3
Torsional index, x= 13.10
Buckling parameter, u = 0.942
lx = Le/rx = 50 l/x = 3.835974
v= 0.83
bw = 1
lLT = uvl/b w = 39

pb = 275 N/mm2 py = 275 N/mm2

Mc = pb Z = 20.79 kNm > M, ok


Vc = 0.6py Av = 82.5 kN > V, ok
Allowable deflection, da = L/270 = 7.41 mm > d, ok

4 Check on Peri Up Scaffolding & Propping

Compression force = 15.66 kN Use

Peri Up Flex Shoring


Use Peri Up Flex Shoring Tower
Tower

Capacity from catalogue = 46 kN > T, ok

Rasau Temporary Work - Formwork Calculation for Table Form/Table Form_slab 2/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark

ACI Committee 347 Rasau Temporary Work - Table Form (Beam & Slab)
BS5950

Formwork

1 Mould Dimension And Loading

Concrete density = 24 kN/m3


Slab thickness = 0.3 m
Beam width = 0.3 m
Beam height = 0.425 m
Cross-sectional area = 0.2775 m2
Slab & Beam load = 6.66 kN/m

DL Factor = 1.2
Factored DL = 7.992 kN/m

Construction load = 1.5 kN/m2


LL Factor = 1.2
Factored LL = 1.80 kN/m2

Total unfactored load = 8.16 kN/m2


Total factored load = 26.16 kN/m2

2 Check on Mould Plate

BS5950 UDL on the plate = 21.53 kN/m


Panel clear spanning length, L = 0.413 m

Moment, M = 0.062FL = 0.23 kNm/m width


Ultimate shear, V = 0.6pL = 5.3 kN/m width
Deflection , d = 5/384 (wL4 / EI) = 0.00 mm

Plate Width, b = 1000 mm Use


Use Aluminum Plate thickness, t = 4.0 mm E= 70 kN/mm2
Py= 240.0 N/mm2 I = bd3 / 12 = 5333 mm4 4 mm
Section modulus, Z = 2667 mm3 thk Aluminum Panel
Mc = Fb Z = 0.640 kNm/m width > M, ok
Shear thru the thickness, Fv = 144.00 N/mm2
Vc = Fv t = 576.00 kN/m width > V, ok
Allowable deflection, da = L/270 = 1.53 mm > d, ok

3 Check on Secondary Support (C-Channel)

Max. steel support spacing, Smax = 0.550 m


Max. clear span 1.500 m
Ultimate moment, M = PL/4 = 2.020 kNm
Ultimate shear, V = P/2 = 10.8 kN
Deflection , d = PL/3EI = 0.00 mm

BS5950 Use 75x40x5 6.92 kg/m CH Use


Diameter, D = 75 mm 75x40x5 6.92 kg/m
Thickness of web, tw = 5 mm CH
Gross Sectional area, Ag = 8.82 cm2 E= 205 kN/mm2
Radius of gyration, ry = 1.19 cm
Moment of inertia, Ixx = 75.90 cm4
Section modulus, Z = 20.20 cm3
Torsional index, x= 10.00
Buckling parameter, u = 0.942
lx = Le/rx = 50 l/x = 5.042017
v= 0.83
bw = 1
lLT = uvl/b w = 39
pb = 262 N/mm2 py = 275 N/mm2

Mc = pb Z = 5.29 kNm > M, ok


Vc = 0.6py Av = 61.9 kN > V, ok
Allowable deflection, da = L/270 = 5.56 mm > d, ok

Rasau Temporary Work - Formwork Calculation for Table Form/Table Form_s&b 1/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark


3 Check on Primary Support (C-Channel)

Max. steel support spacing, Smax = 1.500 m


Max. support length, Lmax = 2.000 m
UDL load, w = 7.18 kN/m
Moment, M = wL2 / 8 = 3.59 kNm
Ultimate shear, V = 0.6pL = 8.6 kN
Deflection , d = 5/384 (wL4 / EI) = 3.22 mm

BS5950 Use 100x50x5 9.36 kg/m CH Use


Diameter, D = 100 mm 100x50x5 9.36 kg/m
Thickness of web, tw = 5 mm CH
Gross Sectional area, Ag = 11.92 cm2 E= 205 kN/mm2
Radius of gyration, ry = 3.98 cm
Moment of inertia, Ixx = 189.00 cm4
Section modulus, Z = 37.80 cm3
Torsional index, x= 13.10
Buckling parameter, u = 0.942
lx = Le/rx = 50 l/x = 3.835974
v= 0.83
bw = 1
lLT = uvl/b w = 39

pb = 275 N/mm2 py = 275 N/mm2

Mc = pb Z = 20.79 kNm > M, ok


Vc = 0.6py Av = 82.5 kN > V, ok
Allowable deflection, da = L/270 = 7.41 mm > d, ok

4 Check on Peri Up Scaffolding & Propping

Compression force = 4.49 kN Use

Peri Up Flex Shoring


Use Peri Up Flex Shoring Tower
Tower

Capacity from catalogue = 46 kN > T, ok

Rasau Temporary Work - Formwork Calculation for Table Form/Table Form_s&b 2/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark

ACI Committee 347 Rasau Temporary Work - Loose Form (Slab)


BS5950

Formwork

1 Mould Dimension And Loading

Slab thickness = 0.3 m


Concrete density = 24 kN/m3
Slab load = 7.2 kn/m2
DL Factor = 1.2
Factored DL = 8.64 kN/m2

Construction load = 1.5 kN/m2


LL Factor = 1.2
Factored LL = 1.80 kN/m2

Total factored load = 10.44 kN/m2

2 Check on Mould Plate

BS5950 Pressure on the plate = 10.44 kN/m2


Panel clear spanning length, L = 0.3 m
Use
Ultimate moment, M = 0.086pL^2 = 0.082 kNm/m width
Ultimate shear, V = 0.6pL = 1.9 kN/m width 12 mm
Deflection , d = 3/384 (wLd4 / EI) = 0.62 mm thk Plywood

Use plywood thickness, t = 12 mm


Extreme fiber stress in bending, Fb = 5.3 N/mm2 E= 6.2 kN/mm2
Section modulus, Z = 24000.0 mm3 I = bd3 / 12 = 144000 mm4
Mc = Fb Z = 0.127 kNm/m width > M, ok
Shear thru the thickness, Fv = 0.758 N/mm2
Vc = Fv t = 9.10 kN/m width > V, ok
Allowable deflection, da = L/270 = 1.11 mm > d, ok

3 Check on Secondary Support (SHS)

Max. steel support spacing, Smax = 0.300 m


Max. clear span 1.500 m
UDL load, w = 3.13 kN/m
Moment, M = wL2 / 8 = 0.88 kNm
Ultimate shear, V = 0.6pL = 2.8 kN
Deflection , d = 5/384 (wL4 / EI) = 13.71 mm

BS5950 Use 38x38x2.3 2.54 kg/m SHS Use


Diameter, D = 38 mm 38x38x2.3 2.54 kg/m
Thickness of web, tw = 2.3 mm SHS
Gross Sectional area, Ag = 2.85 cm2 E= 205 kN/mm2
Radius of gyration, ry = 1.47 cm
Moment of inertia, Ixx = 6.12 cm4
Section modulus, Z = 3.22 cm3
Torsional index, x= 10.00
Buckling parameter, u = 0.942
lx = Le/rx = 41 l/x = 4.081633
v= 0.83
bw = 1
lLT = uvl/b w = 32
pb = 275 N/mm2 py = 275 N/mm2

Mc = pb Z = 0.89 kNm > M, ok


Vc = 0.6py Av = 14.4 kN > V, ok

Rasau Temporary Work - Formwork Calculation for Loose Form/Loose Form_Slab 1/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark


3 Check on Primary Support (RHS)

Max. steel support spacing, Smax = 0.300 m


Max. support length, Lmax = 1.500 m
UDL load, w = 3.13 kN/m
Moment, M = wL2 / 8 = 0.88 kNm
Ultimate shear, V = 0.6pL = 2.8 kN
Deflection , d = 5/384 (wL4 / EI) = 1.60 mm

BS5950 Use 75x50x3 5.59kg/m RHS Use


Diameter, D = 75 mm 75x50x3 5.59kg/m
Thickness of web, tw = 3 mm RHS
Gross Sectional area, Ag = 6.91 cm2 E= 205 kN/mm2
Radius of gyration, ry = 2.00 cm
Moment of inertia, Ixx = 52.50 cm4
Section modulus, Z = 13.90 cm3
Torsional index, x= 10.00
Buckling parameter, u = 0.942
lx = Le/rx = 75 l/x = 7.5
v= 0.83
bw = 1
lLT = uvl/b w = 59

pb = 275 N/mm2 py = 275 N/mm2

Mc = pb Z = 7.65 kNm > M, ok


Vc = 0.6py Av = 37.1 kN > V, ok
Allowable deflection, da = L/270 = 5.56 mm > d, ok

4 Check on Peri Up Scaffolding & Propping

Compression force = 3.13 kN Use

Peri Up Flex Shoring


Use Peri Up Flex Shoring Tower
Tower

Capacity from catalogue = 46 kN > T, ok

Rasau Temporary Work - Formwork Calculation for Loose Form/Loose Form_Slab 2/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark

ACI Committee 347 Rasau Temporary Work - Loose Form (Beam & Slab)
BS5950

Formwork

1 Mould Dimension And Loading

Concrete density = 24 kN/m3


Slab thickness = 0.3 m
Beam width = 0.3 m
Beam height = 0.425 m
Cross-sectional area = 0.2775 m2
Slab & Beam load = 6.66 kN/m

DL Factor = 1.2
Factored DL = 7.992 kN/m

Construction load = 1.5 kN/m2


LL Factor = 1.2
Factored LL = 1.80 kN/m2

Total unfactored load = 8.16 kN/m2


Total factored load = 26.16 kN/m2

2 Check on Mould Plate

BS5950 Point load on the plate = 9.79 kN/m


Panel clear spanning length, L = 0.3 m

Moment, M = 0.065FL = 0.057 kNm/m width


Ultimate shear, V = 0.6pL = 1.8 kN/m width
Deflection , d = 5/384 (wL4 / EI) = 0.00 mm

Use plywood thickness, t = 12 mm Use


Extreme fiber stress in bending, Fb = 5.3 N/mm2 E= 6.2 kN/mm2
Section modulus, Z = 24000.0 mm3 I = bd3 / 12 = 144000 mm4 12 mm
Mc = Fb Z = 0.127 kNm/m width > M, ok thk Plywood
Shear thru the thickness, Fv = 0.758 N/mm2
Vc = Fv t = 9.10 kN/m width > V, ok
Allowable deflection, da = L/270 = 1.11 mm > d, ok

3 Check on Secondary Support (SHS)

Max. steel support spacing, Smax = 0.300 m


Max. clear span 1.500 m
Ultimate moment, M = PL/4 = 1.102 kNm
Ultimate shear, V = P/2 = 4.9 kN
Deflection , d = PL/3EI = 0.00 mm

BS5950 Use 38x38x2.3 2.54 kg/m SHS Use


Diameter, D = 38 mm 38x38x2.3 2.54 kg/m
Thickness of web, tw = 2.3 mm SHS
Gross Sectional area, Ag = 2.85 cm2 E= 205 kN/mm2
Radius of gyration, ry = 1.47 cm
Moment of inertia, Ixx = 6.12 cm4
Section modulus, Z = 4.32 cm3
Torsional index, x= 10.00
Buckling parameter, u = 0.942
lx = Le/rx = 41 l/x = 4.081633
v= 0.83
bw = 1
lLT = uvl/b w = 32
pb = 275 N/mm2 py = 275 N/mm2

Mc = pb Z = 1.19 kNm > M, ok


Vc = 0.6py Av = 14.4 kN > V, ok
Allowable deflection, da = L/270 = 5.56 mm > d, ok

Rasau Temporary Work - Formwork Calculation for Loose Form/Loose Form_S&B 1/2
SG. RASAU TEMPORARY WORK - STRUCTURAL CALCULATIONS

Reference Calculations Remark


3 Check on Primary Support (RHS)

Max. steel support spacing, Smax = 1.500 m


Max. support length, Lmax = 2.000 m
UDL load, w = 3.26 kN/m
Moment, M = wL2 / 8 = 1.63 kNm
Ultimate shear, V = 0.6pL = 3.9 kN
Deflection , d = 5/384 (wL4 / EI) = 5.30 mm

BS5950 Use 75x50x3 5.59kg/m RHS Use


Diameter, D = 75 mm 75x50x3 5.59kg/m
Thickness of web, tw = 3 mm RHS
Gross Sectional area, Ag = 6.91 cm2 E= 205 kN/mm2
Radius of gyration, ry = 2.00 cm
Moment of inertia, Ixx = 52.20 cm4
Section modulus, Z = 13.90 cm3
Torsional index, x= 13.10
Buckling parameter, u = 0.942
lx = Le/rx = 100 l/x = 7.633588
v= 0.83
bw = 1
lLT = uvl/b w = 78

pb = 275 N/mm2 py = 275 N/mm2

Mc = pb Z = 7.65 kNm > M, ok


Vc = 0.6py Av = 74.3 kN > V, ok
Allowable deflection, da = L/270 = 7.41 mm > d, ok

4 Check on Peri Up Scaffolding & Propping

Compression force = 7.34 kN Use

Peri Up Flex Shoring


Use Peri Up Flex Shoring Tower
Tower

Capacity from catalogue = 46 kN > T, ok

Rasau Temporary Work - Formwork Calculation for Loose Form/Loose Form_S&B 2/2
SG. RASAU TEMPORARY WORK – STRUCTURAL CALCULATION

Appendix B
Drawings
5.02.24

KP
KP
KP

GEN
KP

GEN
KP

GEN
KP

GEN
KP

GEN
KP
KP
KP

You might also like