name called, issued by the competent authority permitting

occupation of any building, as provided under local laws, which


has provision for civic infrastructure such as water, sanitation and
electricity.
5. Amended version vide Notification No. K.E.R.C./COS/D/07/08 Dated:
14.3.2008 published in Karnataka Gazette dated: 20.3.2008

Suitable and easily accessible space near the main entrance shall be
provided at a height of 0.6 Mt to 1.6 Mt above the ground level for
energy metering at the ground floor only. However, this is not applicable to
the existing installations where power supply has already been provided.

Old version: Suitable and easily accessible space near the main entrance shall
be provided at a height of 0.6 mtrs to 1.6 mtrs above the ground level for energy
metering at the ground floor / cellar floor.
Separate circuit for each installation shall be laid and terminated at the
common point of supply. The panel board and bus bar arrangements
shall be as approved by the Licensee which shall be arranged by the
Applicant at his cost.
6. Amended Version vide Notification No. K.E.R.C./COS/D/02/16-17 Dated:
22.11.2016 published in Karnataka Gazette dated: 22.11.2016

To have alternate source of supply, two cables shall be provided by the


Applicant. The arrangement shall be as follows:
• Two runs of LT cables for alternate supply.
• Change over switch at the end of the supply cables
All the equipment shall be suitable for sealing to prevent theft / misuse.
Old Version: dated 17.06.2006
To have alternate source of supply, two cables shall be provided by the
Applicant. The arrangement shall be as follows:
• Two runs of cables for alternate supply.
• Change over switch at the end of the supply cables
• Master Metering Cubicle/Master Meter
All the equipment shall be suitable for sealing to prevent theft / misuse.

7. Supply to the building shall be through a common service main cable


terminating in a common bus bar. Supply to individual Consumers shall be
tapped from the common bus bar through individual Meters.

8. MCCB & ELCB shall be installed for the individual installations by the
Applicant / Consumer to have better selectivity. ELCB mentioned above
shall be installed at the entrance of the Individual premises.

9. Amended version vide Notification No. K.E.R.C./COS/D/07/08 Dated:


14.3.2008 published in Karnataka Gazette dated: 20.3.2008

For the purpose of calculation of load, fraction of a KW shall be rounded


off to next higher KW

Conditions of Supply of Electricity Of Distribution Licensees in The State of Karnataka


Page 39 of 182