Professional Documents
Culture Documents
M69 - ELD - Recondition Flimixs Bearing - 1EA - XLSX
M69 - ELD - Recondition Flimixs Bearing - 1EA - XLSX
Online
SPECIFICATIONS & Single
Online Online Single
Single (Approval)
SCOPE OF WORK (Approval) (Approval)
PR Number Haiqal Akmal/CK Lee Hwang
Project Name M69_ELD- Recondition Filmixs Bearing_1EA Date: 4/4/2024
Install Location Electrode Page : 1/1
PED PIC Amirul Haiqal bin Anif Purchasing section
Requestor Salehin From : Ms.Eliss Khoo
Required Date ASAP Return Fax: +606 678 5591
BILL OF MATERIAL
No. Item Specification Qty Remarks
1 Recondition Filmixs Bearing 1EA
VENDOR SCOPES
Design / Drawing Modify Electrical Work
Sample Test X Repair/ Service Others ( )
Fabricate / Assemble X Install
Details
Page 1 of 1
Prepared Checked Approved Approved
Online Online Online
Online Approval
Approval Approval Approval
(Single)
(Single) (Single) (Single)
A Item
3 Bearing 7013UCDTBT EA 2
5 Oring G340 EA 2
6 Oring G260 EA 2
B Labour Cost
C Transportation - LOT
D Commissioning %
E Total SET 1 RM
Prepared Prepared Checked Approved
Construction Name:
Online Online Online Online
M69_ELD- Recondition Filmixs Bearing_1EA Approval Approval Approval Approval
PIC: Haiqal Haiqal Akmal CK Lee Hwang
DETAIL OF DRAWING/PICTURE
Filmixs Bearing
1.