Academics

 Bachelor of Technology in Mechanical engineering from J.R.N Rajasthan Vidyapeeth university (through distance mode)
 Diploma in Mechanical Engineering from State board of technical education and training Hyderabad.
 Intermediate from Alpha Junior College, Telangana
Computer Proficiency

 Windows 95/ 98/ XP, MS Office Suite (MS Word, MS Excel, MS PowerPoint, MS Access, MS Outlook), AutoCAD (E-
20), HAP 4.1 & 4.2
 Leed Green Associate from USGBC

Career Profile

Mechanical engineering professional with 14 years of GCC experience in inspection of installed HVAC services, Plumbing
services, Drainage services, Electrical services and Fire fighting services.

Significant experience in reviewing of shop drawings, design drawings, material submittals and tender documents.

Core Strengths

 Extending complete support to the Project Manager for the effective implementation of HVAC, Plumbing, Fire fighting
Electrical and Drainage services and procedures.
 Ensuring that work is executed as per approved design criteria, investor requirements, international standards, local
authority requirements, safety and quality management systems.
 Identifying and managing MEP associated risks on site; reporting the same to the senior management and contractors to
ensure early detection & resolution of potential problems.
 Managing, coordinating and executing job safety training programs. Furnishing reports on safety hazards and enforcing all
safety policies/ procedures stringently.
 Controlling all aspects of the works including planning, administration, commercial, engineering, site works,
documentation and disciplinary problems.

Employment Scan

June’2023 to Till Date Ezone security solutions, Hyderabad Mep Project Manager

Client - Sattva Knowledge City/ Inorbit Mall


Project - Fit-Out Projects

 Awarding the projects to Vendors based on quotation


 Submitting material submittal for approval.
 Raising RA bills based on material supplied and work executed on site
 Promoting quality awareness through quality sessions.
 Attending progress meeting with client and updating status of work progress

Jan’2023 to May 2023 Space Koncept project management, Hyderabad Mep Project Manager

Major Projects Handled

G+39 floor’s 12 towers at tellapur, Hyderabad (mivan shuttering)

Client - My home constructions


Project - My home sayuk
 Conducting site inspection as per the contractor’s request.
 Approving material based on specifications.
 Inspection and approval of mechanical, plumbing, Electrical and Fire Fighting works.
 Promoting quality awareness through quality sessions with the contractor’s and sub-contractors.

July’2021 to June 2022 Landbase Consulting Pvt. Limited, Hyderabad Mep Project Manager

Major Projects Handled

G+2 luxury villas of 40 no’s

Client - Sri Aditya Homes pvt. Limited

 Conducting site inspection as per the contractor’s request.


 Approving material based on specifications.
 Inspection and approval of mechanical, plumbing, Electrical and Fire Fighting works.
 Promoting quality awareness through quality sessions with the contractor’s and sub-contractors.
 Reviewing of tender documents and awarding the project to the sub-contractors.
 Reviewing of drawings issued by architects, consultants.
 Reviewing of shop drawings issued by sub-contractor.

Feb’2020 to May 2020 Facilities and building solutions, Bengaluru Mep Engineer

Major Projects Handled

Bosch automotives nagnathpura plant expansion project

Client - Bosch Automotive Electronics India Pvt. Ltd

 Conducting site inspection as per the contractors’ request. Approving material based on specifications.
 Inspection and approval of mechanical, plumbing, Electrical and Fire Fighting works.
 Testing and commissioning of all mep works.
 Promoting quality awareness through quality sessions with the contractor.

Nov’13 to Aug 2018 Gulf Engineering and Industrial Consultancy, Qatar Mechanical Inspector/Mechanical
Engineer

Major Projects Handled

Jan 2018 to Aug 2018

Client - Qatar Municipality


Project Manager - Aecom, Qatar
Project - G+8 Industrial Building 1 No.

Jan 2017 to March 2017

Client - Barwa Motor City


Project Manager - Gulf Engineering and Industrial Consultancy, Qatar
Project - G+2 Industrial Building’s 4 No and G+1 Industrial Building’s 2 No’s

Nov’13 to March 2015

MSHEIREB DOWNTOWN DOHA PROJECT: A QR20 billion (US$5.5 billion, €4.18 billion) development, Msherib is a
planned complex in downtown Doha, Qatar which, when completed, will be the world’s largest collection of LEED certified
buildings. The 31-hectares (76 acres, 310,000 square meters) Msherib Downtown is mixed-use development will comprise
more than 100 buildings, with a combination of commercial and residential properties, retail, cultural and entertainment areas.

Client - Msherieb Properties


Project Manager - TIME Qatar (Turner International Middleast)
Executive Architect - Burns & McDonnell Inc.
Buildings under my scope - Mandarin Oriental Doha, Qatar (249 guestrooms, 9 restaurants, Outdoor
Pool and 2 indoor pools)
- G+3 service apartments 3 No’s and a Mosque

Responsibilities

 Attending Inspection Requests (IR's) raised by contractors for installation of Mechanical equipment such as HVAC
ducting, duct insulation, chilled water piping, pipe insulation, air handling units, package units, heat exchangers, grills
and diffusers, motorized dampers, exhaust fans, stair pressurisation fans,VAV’s, Plumbing pipes, pipe insulation, booster
pumps, transfer pumps domestic water tanks, Fire fighting pipes,sprinklers,fire extinguisher’s, fire pumps, fire water
tanks, fire blankets, Drainage pipes, fixtures, floor drains, water closets, wash basin and hanger supports.
 Reviewing submitted shop drawings of HVAC, Plumbing, Drainage and Fire fighting services against contract drawings
and specifications, local codes and statutory requirements and international best practice
 Reporting any works carried out by contractor found to not be in accordance with approved drawing and specifications
and reporting to immediate supervisor for appropriate action and discharge instruction to the contractor
 Monitoring quality of works and assess the safety at site including health and environmental issues, ensuring the same
complies with contracts / QCS specifications, safety and health risk assessment and environmental mitigating measures
respectively on a daily basis
 Maintaining records for daily activities on site including progress photos and ensure they are readily available for
inspection as and when required
 Preparing Surveillance Report(s) for deficiencies of work found at site that are believed to have failed or if the contractor
is not complying with verbal instructions and subsequently complete a Non Conformance Report (NCR) if required in
view of the development of events
 Checking and ensuring effective co-ordination between discipline related works and all other disciplines
 Providing technical input and experiences to resolve any discipline related issues on site that may arise
 Monitoring the contractor’s (ITP's) and quality plan(s) in regards to discipline related works
 Inspecting materials delivered and report on quantity and technical compliance.

April 2012 to June 2012 ARGON GLOBAL W.L.L QATAR. Senior Mechanical Engineer

Client - Sidra Hospital


Project Manager - Arab Engineering Bureau
Project - G+1Building’s 4 No’s for Hospital employees

Responsibilities:

 Motivate, mentor and guide junior staff, where required.


 Responsible for Design Estimation and Execution of MEP scope of Turnkey Projects, within the framework of statutory
regulations, as per specifications issued by clients and consultants.
 Organize to liaise with clients and consultants where required for obtaining relevant approvals.
 Production drawings redline drafting, submittal review, site reviews and RFI responses.
 organized training session for the HVAC department
 Plan labour requirements based on the construction program and provide requirements to the Project Manager

May 2009 to Jul 2010 ABS Consulting, Saudi Arabia (Saudi Aramco PID) Mechanical Inspector
(Project based contract)
Major Projects Handled

KAUST (King Abdullah University of Science and Technology)

The $23 Billion KAUST was Saudi Arabia's first LEED certified project and is the world's largest LEED Platinum campus.
Designed by international architecture firm HOK, it was also chosen by the American Institute of Architects (AIA) Committee
on the Environment (COTE) as one of the 2010 Top Ten Green Projects.

Client - Saudi Aramco


Design Consultant - HOK
Buildings under my scope - 12 no’s G+2 buildings for National guards.

Responsibilities

 Monitor and/or perform quality activities at all stages of projects. Assure that contractor’s work is in compliance with
SAUDI ARAMCO engineering requirements, standards, specifications, and Schedule Q of the project contract.
 Conducting inspection of material and equipment as applicable to ensure compliance with SAUDI ARAMCO requirements
for proper handling, storage and protection at SAUDI ARAMCO facilities and/ or construction sites.
 Monitoring Contractor’s Quality Systems, records and Quality Personnel for compliance with requirements.
 Witnessing on-site and off-site material and installations tests for compliance with SAUDI ARAMCO standards.
 Maintaining accurate records for all controversial and non-complying construction practices, materials and equipment and
report to supervisor detailed potential problems for early resolution.
 Compiling inspection reports and initiating Non-Conformance Reports (NCRs), Worksheets (WSs) and Equipment
Deficiency Report (EDRs) as needed.
 Coordinating 3rd party inspection for checking quality of work executed by the contractor. Furnishing complete reports to the
client with cost savings, including.
 Inspection and approval of mechanical, plumbing and fire fighting works.
 Raising NCRs and also deducting payable amount from contractor’s bills depending on the non-compliance reported in the
work executed by the contractor.

Specific Highlights
 Saved over $ 10 million for King Abdullah University of Science & Technology (KAUST) project through deduction
in payments for:
 Not maintaining quality as per the specified standards.
 Violating international standards.
 Surpassing the timelines stated for project completion.

 Received appreciation letter from the Saudi Aramco project inspection division for maintaining quality on site

Apr’08 to Apr’09 Nass Contracting, Manama (Bahrain) MEP Coordinator


(Project based contract)

Major Projects Handled

Salam Hotel Resort and Spa worth USD 500 million, a five star luxury resort and spa situated on the coast of Bahrain
including a hotel, conference, spa, restaurants, royal island and villas.

Client - Sama Dubai


Architect - DSA Architect
Consultant - WSP Consultant

Responsibilities

 Keeping a track of schedules for all MEP Materials, Shop Drawings and Method Statements.
 Securing approval for all MEP Shop Drawings, Method Statement, and Material Approval Certificate (MAC) depending on
the Master Construction Program (MCP).
 Submitting RFI for MEP works. Allocating tasks to QC inspector, Draftsman and Document Controller; maintaining regular
follow up to ensure compliance with quality & time parameters.
 Coordinating inspection and approval of MEP works. Following a defined project methodology and sequencing the MEP
activities.
 Reviewing subcontractors’ performance to ascertain they execute project activities as per SOW. Issuing letters when any
deviation from plan/ quality standards is noticed.

Specific Highlights

Distinction of receiving appreciation letter from the administration of Murray & Roberts (Bahrain) in the year 2009.

Dec’06 to Mar’08 Dubarch Engineering Consultants, Dubai MEP Engineer


(United Arab Emirates)

Major Projects Handled

 G+2 Floor Residential Villa at Al Mamzar, Dubai for Dirham 10 million.


 B+G+3 Residential Building at Al Karama, Dubai for Dirham 80 million.
 Villas for Mr. Mohammed Saleh at Al Mizhar, Dubai worth 150 million Dirhams.

Responsibilities

 Reviewing the shop drawings submitted by contractor, as well as tender documents.


 Conducting site inspection as per the contractors’ request. Approving material based on specifications.
 Inspection and approval of mechanical, plumbing and fire fighting works.
 Testing and commissioning of all mechanical works.
 Promoting quality awareness through quality sessions with the contractor.
 Reviewing quality of work executed on site, as well as shop drawings submitted by contractor.
 Giving approval to invoices depending on quality of work executed on site.
 Raising NCRs and also deducting payable amount from contractor’s bills depending on the non-compliance reported in the
work executed by the contractor.

Dec’04 to Dec’06 General Engineering & Management Consultant Mechanical Draughtsman


(GEMAC), Dubai (United Arab Emirates)

Major Projects Handled

 Site 35 Golf Views Development for EMAAR Properties.


 Multi Storey Car Park at Sabkha for Dubai Municipality.
 32KV Substations (Dubai Land, Dragon Mall & Garden of Paradise), with each substation consisting of 8 Nos. package
units and total capacity 100 TR.
 Sidra Tower (3B+G+45) Floors Development Offices & Serviced Apartments at B-001-011, TECOM, Dubai.
 Pearl Tower (G+3M+45 Floors), involving 3 towers for Pearl Development Real Estate, Bahrain.
 Proposed 3B+G+16 Building at Al Mamzar, Dubai; and 2B+G+7 Shopping Mall & Hotel at Al Jaddaf, Dubai

Responsibilities

 Preparing final submission format for project details as per Dubai Municipality’s specifications.
 Handling conceptual drawings for drainage systems, water system, rain water system, hot water system and plumbing
fixtures.
 Measuring the size and capacity of water roof tanks, ground water tanks, transfer pumps and booster pumps.
 Carrying out the selection of different types of grills, diffusers, slot diffusers, etc. Making heat load calculations.
 Calculating exhaust requirements in kitchens and toilets.
 Preparing schedule for the commissioning of mechanical equipment.
 Using software like HAP 4.2 for calculating duct sizes, chilled water piping size, etc.
 Making pump head calculations for fire pumps, capacity calculations for fire water tanks and sprinkler pipe sizing.
Complying NFPA codes like NFPA 13, 20, 90A.